Project overview
About Thailand Factory 2019
Listed by World Steel as Thailand Factory 2019, this industrial building was completed that year with steel the company designed, fabricated and supplied. It is one of several factories World Steel framed in Thailand before 2020, adding to its experience with production halls, where equipment layouts and future growth often influence how the structure is planned.
US manufacturers starting a plant project should tell their steel supplier early about equipment loads, future expansion and any crane plans. We fold those into a SAP2000 analysis, design to AISC 360 under IBC 2024 and ASCE 7-22 or your Engineer of Record’s basis, and show expandable end-wall options. Send your production layout for an early steel concept.
SQM Factory was supplied in 2019. A factory frame has to stay serviceable for decades of changing use, so spare capacity in the roof for future equipment is often worth more than a few tonnes saved today. That is a decision for the owner and the Engineer of Record.
Gallery
Thailand Factory 2019 images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
Thailand Factory 2019 by the numbers
In the portfolio
Thailand Factory 2019 is one of 33 factories in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.
World Steel supplied Thailand Factory 2019 in 2019, together with 19 other projects shown here from that year.
More factories:
Design points
What a factory needs from its steel
General points for every factory, not specific to this one.
Process first, frame second
Production lines, crane coverage and utility runs are laid out first, and the frame is sized to carry what they need.
Learn more →Mezzanines in the model
Offices, control rooms and equipment decks are part of the main structural model rather than bolted on later.
Learn more →Heat, cold and condensation
Insulation, ventilators and louvers are chosen for the process heat and the IECC climate zone, so the shop floor stays workable year-round.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Factory. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Thailand · 2020
Boss Pharmacere Factory
Factory
Photo
Thailand · 2020
Interlink Factory
Factory
Photo
Thailand · 2025
JRI New Factory
Factory
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a factory in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.