Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Fabricated steel members for the Thailand Factory 2019 in the fabrication workshop

Photo, World Steel project archive: steel members before shipping.

Thailand

Thailand Factory 2019 Structural steel for a factory in Thailand

A factory building in Thailand, listed in World Steel's portfolio for 2019. Industrial frames like this are designed around the equipment inside them, not just the roof over it.

Location
Thailand
Building type
Factory
Year
2019
Next step Plan a similar building →

Project overview

About Thailand Factory 2019

Listed by World Steel as Thailand Factory 2019, this industrial building was completed that year with steel the company designed, fabricated and supplied. It is one of several factories World Steel framed in Thailand before 2020, adding to its experience with production halls, where equipment layouts and future growth often influence how the structure is planned.

US manufacturers starting a plant project should tell their steel supplier early about equipment loads, future expansion and any crane plans. We fold those into a SAP2000 analysis, design to AISC 360 under IBC 2024 and ASCE 7-22 or your Engineer of Record’s basis, and show expandable end-wall options. Send your production layout for an early steel concept.

SQM Factory was supplied in 2019. A factory frame has to stay serviceable for decades of changing use, so spare capacity in the roof for future equipment is often worth more than a few tonnes saved today. That is a decision for the owner and the Engineer of Record.

In context

Thailand Factory 2019 by the numbers

In the portfolio

Thailand Factory 2019 is one of 33 factories in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.

World Steel supplied Thailand Factory 2019 in 2019, together with 19 other projects shown here from that year.

More factories:

Design points

What a factory needs from its steel

General points for every factory, not specific to this one.

Process first, frame second

Production lines, crane coverage and utility runs are laid out first, and the frame is sized to carry what they need.

Learn more →

Mezzanines in the model

Offices, control rooms and equipment decks are part of the main structural model rather than bolted on later.

Learn more →

Heat, cold and condensation

Insulation, ventilators and louvers are chosen for the process heat and the IECC climate zone, so the shop floor stays workable year-round.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Factory. Steel structure design, fabrication and supply by World Steel.

Planning a factory in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.