- Location
- Thailand
- Building type
- Commercial & retail building
- Year
- 2020
Project overview
About SKB Marry Mart
SKB Marry Mart is a commercial and retail building in Thailand delivered in 2020, with World Steel providing the steel structure. Smaller retail buildings tend to follow repeatable formats, which rewards a supplier able to turn one approved design into consistent packages for every new store in a chain, with the same details and the same drawing standards each time.
US franchise owners, grocery operators and convenience-store developers often build the same prototype in many towns. We can engineer a steel frame once, then adjust loads for each site’s wind, snow and seismic data under ASCE 7-22 and prepare calculations for each building department. Your local contractor handles foundations and erection. Tell us about your prototype and rollout plans.
Supermarket roofs carry refrigeration condensers and HVAC units, often in heavy concentrated spots. World Steel takes the equipment layout into the design, so the purlins and rafters under each unit are sized for it and the support frames come with the steel package.
Gallery
SKB Marry Mart images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
SKB Marry Mart by the numbers
In the portfolio
SKB Marry Mart is one of 10 commercial and retail buildings in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.
World Steel supplied SKB Marry Mart in 2020, together with 26 other projects shown here from that year.
More commercial and retail buildings:
Design points
What a commercial & retail building needs from its steel
General points for every commercial & retail building, not specific to this one.
Flexible floor plans
Stores, dealerships and showrooms change layouts often, so long spans keep interior columns to a minimum.
Learn more →Curb appeal
Storefront glazing, entry canopies and tidy steel details on the customer side carry as much weight as structural efficiency.
Learn more →Snow and roof steps
Parapets, canopies and roof height changes collect drifting snow, which ASCE 7 requires the frame to carry.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Commercial & retail building. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Thailand · 2023
Makro Prachinburi
Commercial & retail building
Photo
Thailand · 2020
Marko Khonkaen
Commercial & retail building
Photo
Thailand · 2020
7-ELEVEN
Commercial & retail building · 791 t steel
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a commercial & retail building in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.