Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
3D design model of the Apache Camper Center

3D design model by World Steel. Not a photograph.

United States

Apache Camper Center Structural steel for a commercial & retail building in United States

A commercial and retail building in the United States, finished in 2023 using a pre-engineered steel frame. It is a good reference for US dealerships, showrooms and service buildings that need wide clear spans under one roof.

Location
United States
Building type
Commercial & retail building
Year
2023
Status
Completed
Next step Plan a similar building → Next step See all projects →

Project overview

About Apache Camper Center

Apache Camper Center is a US delivery from 2023, a commercial and retail building framed with steel that World Steel designed and fabricated. Dealerships for campers, RVs and trailers are a natural fit for metal building systems, because they often combine a sales area, a service bay and storage under a single roof with large openings for oversized units.

If you are planning a showroom, dealership or service building in the US, World Steel can size frames and openings to your layout, coordinate with your architect and provide anchor bolt plans for your foundation contractor. The design basis follows IBC 2024 and ASCE 7-22 unless your Engineer of Record specifies otherwise. Share the site address and floor plan to get the conversation started.

Recreational vehicle dealers need tall, wide door openings for units that can stand about 4 m (13 ft) tall, and each opening interrupts the wall bracing. In a dealership frame, those openings are fixed early, so the bracing is placed in the solid bays and the door headers are designed as part of the main structure rather than added later.

In context

Apache Camper Center by the numbers

In the portfolio

Apache Camper Center is one of 10 commercial and retail buildings in the World Steel portfolio on this site, and one of 7 projects listed for United States.

World Steel supplied Apache Camper Center in 2023, together with 21 other projects shown here from that year.

More commercial and retail buildings:

Design points

What a commercial & retail building needs from its steel

General points for every commercial & retail building, not specific to this one.

Flexible floor plans

Stores, dealerships and showrooms change layouts often, so long spans keep interior columns to a minimum.

Learn more →

Curb appeal

Storefront glazing, entry canopies and tidy steel details on the customer side carry as much weight as structural efficiency.

Learn more →

Snow and roof steps

Parapets, canopies and roof height changes collect drifting snow, which ASCE 7 requires the frame to carry.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Structural design, fabrication and export supply of the steel structure.

Planning a commercial & retail building in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.