Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Steel structure of the 3N1 Warehouse, Philippines on site

Site photo, World Steel project archive.

Philippines

3N1 Warehouse Structural steel for a warehouse in Philippines

A steel warehouse in the Philippines, listed in World Steel's portfolio for 2023. Shipped by sea to the Philippines, it follows the same packing and container planning World Steel uses for US ports.

Location
Philippines
Building type
Warehouse
Year
2023
Next step Plan a similar building →

Project overview

About 3N1 Warehouse

World Steel supplied the structural steel for 3N1 Warehouse in the Philippines in 2023. The country sees frequent tropical storms, so wind is a central concern for any warehouse built there.

Owners on the US Gulf and Atlantic coasts plan around the same issue. Under ASCE 7-22 the design wind speed comes from your site’s location and risk category, and door openings and roof edges get particular attention. Your Engineer of Record confirms the criteria; we design and fabricate the frame and connections to them. Send your site address for a load check.

The Philippines faces typhoons every year, so a warehouse there is designed for high wind and uplift on the roof. US warehouses on the Gulf Coast and in Florida face the same hurricane design questions.

In context

3N1 Warehouse by the numbers

In the portfolio

3N1 Warehouse is one of 63 warehouses in the World Steel portfolio on this site, and one of 8 projects listed for Philippines.

World Steel supplied 3N1 Warehouse in 2023, together with 21 other projects shown here from that year.

More warehouses:

Design points

What a warehouse needs from its steel

General points for every warehouse, not specific to this one.

Cube, not just floor area

A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.

Learn more →

Dock doors and bracing

A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.

Learn more →

Snow, rain and ponding

Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Warehouse. Steel structure design, fabrication and supply by World Steel.

Planning a warehouse in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.