Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Steel structure of the Warehouse 25×42, Thailand on site

Site photo, World Steel project archive.

Thailand

Warehouse 25×42 Structural steel for a warehouse in Thailand

A steel warehouse in Thailand. The project name gives its plan size as 25 × 42. No completion year is published for it. A small warehouse of about 1,000 m², the size of many US contractor shops and agricultural storage buildings.

Location
Thailand
Building type
Warehouse
Footprint
25 m × 42 m (82 ft × 138 ft) · about 1,050 m² (11,300 sq ft)
Next step Plan a similar building →

Project overview

About Warehouse 25×42

Warehouse 25×42 in Thailand covers a footprint of 25 by 42 m, roughly 82 by 138 ft and about 11,300 sq ft. It is a straightforward pre-engineered building, and that is exactly why it is a helpful reference: most US metal building projects are of this scale, and the quality of drawings and fabrication matters more than any headline feature.

For a US building of this size, the main local differences are loads and code basis. World Steel applies wind, snow and seismic values from ASCE 7-22 for your exact site, checks members to AISC 360 and AISI S100, and provides a package ready for review. Send your address and dimensions, and we will tell you what the structure would include.

A 25 m (82 ft) span leaves room for a center truck lane with storage on both sides. US farm equipment storage and contractor shops often use this layout, with large end-wall doors.

In context

Warehouse 25×42 by the numbers

Footprint

About 1,050 m² (11,300 sq ft) of footprint, about 20% of a US football field with end zones.

It is 25 m (82 ft) wide. A width of 20 to 35 m can still be one clear span with no interior columns, which US distributors prefer for racking.

By footprint it ranks 21st of the 26 warehouses on this site with published dimensions.

In the portfolio

Warehouse 25×42 is one of 63 warehouses in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.

Closest in footprint:

Design points

What a warehouse needs from its steel

General points for every warehouse, not specific to this one.

Cube, not just floor area

A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.

Learn more →

Dock doors and bracing

A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.

Learn more →

Snow, rain and ponding

Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Warehouse. Steel structure design, fabrication and supply by World Steel.

Planning a warehouse in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.