- Location
- United States
- Building type
- Warehouse
- Year
- 2019
- Status
- Completed
Project overview
About UR Warehouse 2
UR Warehouse 2 is a 2019 US delivery, a pre-engineered steel warehouse designed and fabricated by World Steel. It is one of the company’s earlier American projects and shows that the export model of factory fabrication in Vietnam, ocean shipping and local erection has served US buyers for several years.
Pre-engineered warehouses are where a metal building system shows its value: tapered frames, cold-formed purlins and girts, and bracing are designed as one system, with cold-formed members checked to AISI S100 and the building following MBMA practice. Your erector receives a complete, labeled kit. If you need a storage or light industrial building, send your dimensions and site location for a proposal.
A second warehouse delivered under the same project name shows the kind of repeat order that matters to US owners who build in phases. When the first building's design files are kept, a second one can reuse its frame layout and connection details, and the shop drawings start from a checked model rather than a blank sheet.
Gallery
UR Warehouse 2 images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
UR Warehouse 2 by the numbers
In the portfolio
UR Warehouse 2 is one of 63 warehouses in the World Steel portfolio on this site, and one of 7 projects listed for United States.
World Steel supplied UR Warehouse 2 in 2019, together with 19 other projects shown here from that year.
More warehouses:
Design points
What a warehouse needs from its steel
General points for every warehouse, not specific to this one.
Cube, not just floor area
A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.
Learn more →Dock doors and bracing
A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.
Learn more →Snow, rain and ponding
Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Structural design, fabrication and export supply of the steel structure.
More projects
Related projects
Photo
New York, United States
NYT Warehouse
Warehouse · 230 t steel
Photo
United States · 2024
Addario
Warehouse
Photo
Guam · 2019
UR Warehouse
Warehouse
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a warehouse in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.