- Location
- Vietnam
- Building type
- Commercial & retail building
Project overview
About Binh Chau Hot Spring Renovation
Binh Chau Hot Spring Renovation is a commercial and hospitality project in Vietnam where World Steel supplied structural steel for the upgrade of an existing destination. Renovation work differs from new construction because new members must fit the dimensions of what is already standing.
Owners of US resorts, waterparks and recreation centers face the same challenge when adding canopies, pavilions or new wings. Accurate field measurements are the starting point, and your Engineer of Record decides how new steel connects to existing structure. We detail from those measurements and mark every piece for the erector. Send your existing drawings and site survey.
Renovation work fits new steel to an existing building, so site measurements come before shop drawings. A resort renovation like this is close to US hospitality refurbishment work, where existing structures set the limits.
In context
Binh Chau Hot Spring Renovation by the numbers
In the portfolio
Binh Chau Hot Spring Renovation is one of 10 commercial and retail buildings in the World Steel portfolio on this site, and one of 43 projects listed for Vietnam.
More commercial and retail buildings:
Design points
What a commercial & retail building needs from its steel
General points for every commercial & retail building, not specific to this one.
Flexible floor plans
Stores, dealerships and showrooms change layouts often, so long spans keep interior columns to a minimum.
Learn more →Curb appeal
Storefront glazing, entry canopies and tidy steel details on the customer side carry as much weight as structural efficiency.
Learn more →Snow and roof steps
Parapets, canopies and roof height changes collect drifting snow, which ASCE 7 requires the frame to carry.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Commercial & retail building. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Lam Dong Province, Vietnam
Bao Loc Showroom
Commercial & retail building
Ho Chi Minh City, Vietnam
An Phu 3S Hyundai
Commercial & retail building · 400 t steel
Photo
Thailand · 2020
SKB Marry Mart
Commercial & retail building
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a commercial & retail building in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.