- Location
- Thailand
- Building type
- Warehouse
- Year
- 2026
- Footprint
- 20 m × 36 m (66 ft × 118 ft) · about 720 m² (7,800 sq ft)
Project overview
About Warehouse 20×36M
Warehouse 20×36M is a 2026 project in Thailand with a footprint of 20 by 36 m, roughly 66 by 118 ft. It is one of World Steel’s most recent warehouse deliveries, and its compact size lines up with a common US request: a single clear-span building for storage, a contractor yard, an agricultural operation or a small distribution point.
At this width a building can usually be framed without interior columns, which keeps the floor flexible for racking or equipment. For a US version, World Steel designs the frames, purlins and girts as one system to MBMA practice and AISI S100, then ships a labeled kit with anchor bolt plans for your concrete contractor. Send your dimensions and site address for a quote.
A 20 m (66 ft) span is one of the most efficient sizes for a single clear-span frame: wide enough for trucks to turn inside, narrow enough to keep rafters light. Many US contractor yards, farm buildings and equipment sheds use the same width.
In context
Warehouse 20×36M by the numbers
Footprint
About 720 m² (7,750 sq ft) of footprint, about 13% of a US football field with end zones.
It is 20 m (66 ft) wide. A width of 20 to 35 m can still be one clear span with no interior columns, which US distributors prefer for racking.
By footprint it ranks 23rd of the 26 warehouses on this site with published dimensions.
In the portfolio
Warehouse 20×36M is one of 63 warehouses in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.
World Steel supplied Warehouse 20×36M in 2026, together with 6 other projects shown here from that year.
Closest in footprint:
Design points
What a warehouse needs from its steel
General points for every warehouse, not specific to this one.
Cube, not just floor area
A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.
Learn more →Dock doors and bracing
A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.
Learn more →Snow, rain and ponding
Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Warehouse. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Thailand · 2022
Mongkolphisan Warehouse 80×70
Warehouse
Photo
Pathumtani, Thailand · 2020
Pathumtani Warehouse
Warehouse
Photo
Thailand · 2025
Warehouse 38×135
Warehouse
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a warehouse in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.