Capacity for Haiti
Large Haiti projects need a large plant. Ours fabricates 2,500 t a month.
These are single jobs from our own plant in Vietnam, released area by area. Whatever Haiti is building, the steel comes from the same line.
Already in the Caribbean
Steel from our plant stands in Guyana today:
- 18 pedestrian bridges
- 6 warehouses
- 2 maintenance workshops
- 1 office building
- 1 mosque
Matched to Haiti
What Haiti builds, and the steel we supply for it
Schools, hospitals and public buildings, warehouses for relief and trade, industrial parks in the north, and churches and halls.
Schools and community halls
Schools, classrooms and community halls, designed to the loads your engineer of record sets.
See the steel →Multi-storey hotels and offices
Multi-storey steel frames with composite deck for hotels, offices, apartments and hospitals.
See the steel →Warehouses and distribution
Clear-span distribution buildings with dock doors, mezzanines and racking loads, sized for the ports and estates of Haiti.
See the steel →Plants with crane bays
Portal frames with crane bays for processing, packaging and manufacturing plants.
See the steel →Churches and assembly halls
Churches, mosques and assembly halls with wide interiors free of columns.
See the steel →Equipment shelters
Compact equipment and utility shelters, shipped ready to bolt together.
See the steel →Cold storage buildings
Insulated cold rooms and chilled warehouses for fish, produce and food distribution in Haiti.
See the steel →Solar and EV canopies
Solar carports and EV charging canopies built for Haiti sun and storms.
See the steel →
For Haitian contractors
Why Haitian contractors work with World Steel
One supplier for the whole steel package, made in one accredited plant and shipped to Port-au-Prince, with you in charge of the site.
Our own plant, 2,500 t a month
One plant in Vietnam fabricates 2,500 metric tons of structural steel a month, so a large Haiti package gets a production slot, not a place in a queue.
IAS AC472 accredited
The first and only fabricator in Vietnam accredited under IAS AC472, audited twice a year since 2019. Your inspector is welcome at every hold point.
One desk, one project manager
Design, drawings, steel, coating, inspection, packing and shipping under one contract, with one English-speaking project manager for your Haiti job.
Live in PEB Studio
Follow every member from cutting to the ship in real time, from your office in Port-au-Prince, and book cranes and crews on facts.
Shop drawings included
Tekla shop and erection drawings come with every project at no extra cost, ready for your engineer of record to approve.
FOB Vietnam or CIF Port-au-Prince
Two clear terms: take the steel at our port in Vietnam, or let us arrange sea freight and insurance through to Port-au-Prince.
About 45 days at sea
From the Vietnamese port to the Caribbean port takes about 45 days, with packing lists and shipping documents ready for your customs broker.
We never compete with you
We supply the steel structure only. Haitian contractors win and build the job; we back the bid with drawings, calculations and live tracking.
Designed for Haiti
Built for the wind, salt and ground of Haiti
We design to the Haiti National Building Code with the values your engineer of record sets, state them on sheet one and coat the steel for the exposure of your site.
Hurricane wind
Very highSalt air
HighEarthquake
Very high
Caribbean hurricane and marine guides
The whole shelf
Every product and solution, available for Haiti
Anything in our catalog can ship to Port-au-Prince: structural steel and members, complete buildings, engineered solutions, and the coatings and quality records that go with them.
Structural steel and members
Frames, built-up members and multi-storey steel for buildings of any size.
Complete building packages
Whole buildings, frame to roof and wall cladding, packed as one shipment.
Solutions for island loads
Engineering groups written for hurricanes, earthquakes, salt air and remote sites.
Coating, quality and documents
What protects the steel and proves it: coatings, inspection, accreditation and sample files.
Shipping to Haiti
From our plant to Port-au-Prince, FOB or CIF
Members leave Vietnam piece-marked and bundled in erection order. The voyage from the Vietnamese port to Port-au-Prince takes about 45 days; your contractor clears the cargo and takes it to site.
An invitation to Haitian contractors
You win the job and build it. We fabricate the steel.
Rebuilding Haiti is work for Haitian contractors. We supply the steel structure, designed with your engineer of record for the earthquake and the wind, with clear drawings your crews can follow. You build; we fabricate.
- You, the Haitian contractorWin the job, clear the cargo, erect the steel and run the site.
- World SteelDesign, drawings, fabrication, coating, inspection, packing and shipping.
- Your engineer of recordSets the loads, approves the drawings and seals them as local rules require.
- Start todayContact page for Haiti
Questions from Haitian contractors
Buying steel for Haiti: the questions we hear
Can you design a school in Haiti for earthquakes?
Yes. We take the seismic values your engineer of record sets for the site and detail the frame for them, with welding by qualified procedures and welders. The basis is stated on the drawings.
Can you supply repeat buildings for a program?
Yes. A school, clinic or warehouse design can be repeated across many sites, with each building packed and marked as its own shipment.
What does World Steel supply for a project in Haiti?
The steel structure: design or a design check to the Haiti National Building Code with the loads your engineer of record sets, shop and erection drawings, fabricated and coated steel and bolts. Complete building packages add roof and wall cladding, doors and accessories, and overhead cranes can come with the building on request. The contractor, our customer, erects it.
How are price and delivery agreed for Haiti?
Every quote is written for its project; we do not publish prices. You choose FOB Vietnam or CIF to Port-au-Prince. The voyage from the Vietnamese port to the Caribbean takes about 45 days, and the production slot is named in the quote.
How we work in Haiti. World Steel designs and fabricates to the Haiti National Building Code and the standards it references, in our own plant in Vietnam. We hold no Haitian approval, licence or registration and have no office or crew in Haiti. The contractor, our customer, erects the steel and runs the site; the engineer or architect of record approves the drawings and seals and files them as local rules require.
More for Haiti
Contact World Steel · Haiti
Talk to us about steel for Haiti
WhatsApp, email or a video call with our engineers, booked at an hour that suits Port-au-Prince. Our contact page for Haiti has the ports, the local time and the form.