Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Saint Lucia · Solutions and products

Steel solutions and products for Saint Lucia

Resorts under the Pitons, logistics at Vieux Fort, new public buildings in Castries: here is every steel product and solution we supply for Saint Lucia, shipped to Castries or Vieux Fort.

Saint Lucian contractors, from Gros Islet to Vieux Fort, this page puts our whole range in front of you.

Manifest · Vietnam to

Castries

FromWorld Steel plant, Vietnam
ToCastries, Vieux Fort
TermsFOB Vietnam or CIF
At seaAbout 45 days
PackingErection order, every piece marked
Simulate the voyage to Castries

Capacity for Saint Lucia

Large Saint Lucia projects need a large plant. Ours fabricates 2,500 t a month.

These are single jobs from our own plant in Vietnam, released area by area. Whatever Saint Lucia is building, the steel comes from the same line.

For Saint Lucian contractors

Why Saint Lucian contractors work with World Steel

One supplier for the whole steel package, made in one accredited plant and shipped to Castries, with you in charge of the site.

  • Our own plant, 2,500 t a month

    One plant in Vietnam fabricates 2,500 metric tons of structural steel a month, so a large Saint Lucia package gets a production slot, not a place in a queue.

  • IAS AC472 accredited

    The first and only fabricator in Vietnam accredited under IAS AC472, audited twice a year since 2019. Your inspector is welcome at every hold point.

  • One desk, one project manager

    Design, drawings, steel, coating, inspection, packing and shipping under one contract, with one English-speaking project manager for your Saint Lucia job.

  • Live in PEB Studio

    Follow every member from cutting to the ship in real time, from your office in Castries, and book cranes and crews on facts.

  • Shop drawings included

    Tekla shop and erection drawings come with every project at no extra cost, ready for your engineer of record to approve.

  • FOB Vietnam or CIF Castries

    Two clear terms: take the steel at our port in Vietnam, or let us arrange sea freight and insurance through to Castries.

  • About 45 days at sea

    From the Vietnamese port to the Caribbean port takes about 45 days, with packing lists and shipping documents ready for your customs broker.

  • We never compete with you

    We supply the steel structure only. Saint Lucian contractors win and build the job; we back the bid with drawings, calculations and live tracking.

The whole shelf

Every product and solution, available for Saint Lucia

Anything in our catalog can ship to Castries: structural steel and members, complete buildings, engineered solutions, and the coatings and quality records that go with them.

Structural steel and members

Frames, built-up members and multi-storey steel for buildings of any size.

Complete building packages

Whole buildings, frame to roof and wall cladding, packed as one shipment.

Solutions for island loads

Engineering groups written for hurricanes, earthquakes, salt air and remote sites.

Coating, quality and documents

What protects the steel and proves it: coatings, inspection, accreditation and sample files.

Designed for Saint Lucia

Built for the wind, salt and ground of Saint Lucia

We design to the Saint Lucia Building Code with the values your engineer of record sets, state them on sheet one and coat the steel for the exposure of your site.

Shipping to Saint Lucia

From our plant to Castries, FOB or CIF

Members leave Vietnam piece-marked and bundled in erection order. The voyage from the Vietnamese port to Castries takes about 45 days; your contractor clears the cargo and takes it to site.

FOBVietnamYou or your forwarder book the ship from our port.
CIFCastriesWe book sea freight and insurance to your port.

An invitation to Saint Lucian contractors

You win the job and build it. We fabricate the steel.

Saint Lucia’s hillsides and coasts ask a lot of a builder. You bring the local skill; we bring frames designed for the wind, coated for the sea and packed so your crew sets them in order. You build; we fabricate.

  • You, the Saint Lucian contractorWin the job, clear the cargo, erect the steel and run the site.
  • World SteelDesign, drawings, fabrication, coating, inspection, packing and shipping.
  • Your engineer of recordSets the loads, approves the drawings and seals them as local rules require.

Questions from Saint Lucian contractors

Buying steel for Saint Lucia: the questions we hear

Which port should steel for southern Saint Lucia go to?

Vieux Fort suits the south and the airport area; Castries suits the north and the west coast resorts. CIF terms name the port you choose.

Can you design a hillside resort frame for Saint Lucia?

Yes. We take the wind speed-up from the slope and the foundation layout your engineer sets, and design the frame and its connections to them.

What does World Steel supply for a project in Saint Lucia?

The steel structure: design or a design check to the Saint Lucia Building Code with the loads your engineer of record sets, shop and erection drawings, fabricated and coated steel and bolts. Complete building packages add roof and wall cladding, doors and accessories, and overhead cranes can come with the building on request. The contractor, our customer, erects it.

How are price and delivery agreed for Saint Lucia?

Every quote is written for its project; we do not publish prices. You choose FOB Vietnam or CIF to Castries. The voyage from the Vietnamese port to the Caribbean takes about 45 days, and the production slot is named in the quote.

How we work in Saint Lucia. World Steel designs and fabricates to the Saint Lucia Building Code and the standards it references, in our own plant in Vietnam. We hold no Saint Lucian approval, licence or registration and have no office or crew in Saint Lucia. The contractor, our customer, erects the steel and runs the site; the engineer or architect of record approves the drawings and seals and files them as local rules require.

More for Saint Lucia

Contact World Steel · Saint Lucia

Talk to us about steel for Saint Lucia

WhatsApp, email or a video call with our engineers, booked at an hour that suits Castries. Our contact page for Saint Lucia has the ports, the local time and the form.