Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Caribbean industrial estates · Trinidad and Tobago

Steel buildings for every industrial estate in Trinidad and Tobago

From the gas plants of Point Lisas and La Brea to the tech park at Tamana and the eco-park at Cove, each estate has its own lots, loads and rules. We design the steel for your lot, fabricate it in our IAS AC472 accredited plant in Vietnam at 2,500 t a month and ship it FOB Vietnam or CIF Port of Spain for the local contractor, our customer, to erect.

7estates and ports in this guide
860 haPoint Lisas, the largest estate
2,500 ta month from our own plant
FOB · CIFthe two terms we offer
Point Lisas Phoenix Park La Brea Union Tamana Galeota Cove, Tobago
Pins are approximate and placed by district.

Seven estates, one fabricator

Choose your estate. Each one has its own steel guide.

Estate facts come from public government, estate and press reports, with the year. Lots are leased from each estate’s manager; we supply the steel building for the lot you hold.

01

Couva, central Trinidad

Point Lisas Industrial Estate

The energy estate on the Gulf of Paria: ammonia, methanol, steel and power plants beside the Port of Point Lisas.

  • 860 ha · estate area, public reports
  • 1978 · year the estate was developed
  • 11.5 m · draught at the largest berth
02

Point Lisas, central Trinidad

Phoenix Park Industrial Estate

A 144-acre light industrial estate next to Point Lisas, billed as the first 5G industrial estate in the region.

  • 144 acres · about 58 ha, public reports
  • 78 lots · for light industry and commerce
  • 5G · networked industrial estate
03

La Brea, south-west Trinidad

La Brea Industrial Estate

LABIDCO’s energy estate and the Port of Brighton: a platform fabrication yard, berths and lots for energy service firms.

  • 407 acres · about 165 ha, public reports
  • 1995 · LABIDCO incorporated
  • 3 berths · at the Port of Brighton
04

La Brea, south-west Trinidad

Union Industrial Estate

About 336 ha across the road from La Brea, laid out for light to heavy gas-based industry and a large power plant.

  • 336 ha · with buffers and reserves, public reports
  • 26 lots · for light to heavy gas-based industry
  • 16 lots · listed as available in 2022
05

Wallerfield, north-east Trinidad

Tamana InTech Park

An 1,100-acre technology park on the old Wallerfield airfield, with large lots and green space near Piarco airport.

  • 1,100 acres · about 445 ha, public reports
  • 2005 · year the park was inaugurated
  • 83,785 m² · largest lot listed in 2022
06

Guayaguayare, south-east Trinidad

Port of Galeota

The east coast energy port: five berths, warehouses and serviced lots for offshore supply and service companies.

  • 5 berths · and a 200 m turning basin
  • 18 lots · serviced, public reports
  • ECMA · east coast marine area hub
07

Cove, south-west Tobago

Cove Eco-Industrial and Business Park

Tobago’s 70-acre eco-industrial park with factory shells and multi-producer units for island businesses.

  • 70 acres · about 28.3 ha, public reports
  • 2 · multi-producer units and factory shells
  • Tobago · eco-industrial park

Sources: InvesTT Investment Guide (2022), Ministry of Trade and Industry (2022), The Energy Year (2018, 2023), NGC (2025), Caribbean Beat (2009). Check lots and leases with each estate’s manager.

Why Trinbagonian contractors trust the package

Standards you can submit, shipping you can plan, quality you can inspect

Standards you can submit

Every building is designed to the code basis your engineer of record names, with the basis printed on sheet one of the calculations.

  • Trinidad and Tobago building approvals guide
  • AISC 360 and AWS D1.1 designed to
  • Mill certificates for every heat
  • Your engineer of record approves and seals

Shipping you can plan

About 45 days at sea from the Vietnamese port to Port of Spain on a typical sailing, confirmed at booking. Our plant is about two hours by road from the port.

  • FOB Vietnamese port or CIF Port of Spain
  • Packed in erection order
  • Bundle lists by building and area
  • Tracked live in PEB Studio

Quality you can inspect

Inspection items and rates are agreed with you before cutting, and your inspector can watch online or visit the plant.

  • Inspection and test plan agreed per job
  • AWS-qualified welders
  • Coating readings recorded
  • Materials tested at ILAC labs

From our plant to your estate gate

Five legs from Vietnam to a Trinidad and Tobago estate

Sailing time is the typical figure from the Vietnamese port and is confirmed at booking. Steel is packed in erection order, so the first bundles off the truck are the first members your crew needs.

  1. Our plantFabricated, coated and packed in erection order
  2. Vietnamese portAbout two hours by road from the plant
  3. At seaAbout 45 days to Port of Spain, typical sailing
  4. Port of SpainCleared by your broker on CIF terms
  5. Estate gateBy road to Couva, La Brea, Wallerfield or Galeota

From our plant

Where every Trinidad and Tobago estate building is made

Real World Steel photos from our plant in Vietnam. None is shown as a site in Trinidad and Tobago.

Every building is designed to the code basis your engineer of record names, made in an IAS AC472 accredited plant and checked to an inspection plan you agree.

Large-project capacity

Built for the biggest jobs on any Trinidad and Tobago estate

Our own plant in Vietnam fabricates 2,500 t of structural steel a month. These are real World Steel jobs, plus the steel we have already shipped to the Caribbean, erected by the local contractor, our customer.

5,000 tSunpro Steel mill
2,500 tCPV Food plant
2,000 tLong Son oil and gas, 56,000+ m²
2,000 tM&D Warehouse, Thailand
20projects already shipped to Guyana

Questions

Questions on steel buildings for Trinidad and Tobago estates

Which Trinidad and Tobago industrial estates do you supply?

Point Lisas, Phoenix Park, La Brea, Union, Tamana InTech Park, the Port of Galeota and the Cove Eco-Industrial Park in Tobago. We supply the steel building for the lot you lease; the estate manager handles the lease.

On what terms do you ship to Trinidad and Tobago?

FOB at the Vietnamese port, where your forwarder takes over, or CIF Port of Spain, where we book and insure the sailing. Clearance is handled by your broker.

How long does steel take to reach Port of Spain?

About 45 days at sea from the Vietnamese port on a typical sailing, confirmed at booking. Our plant is about two hours by road from the port.

Which code are the buildings designed to?

To the code basis your engineer of record names, commonly with AISC 360 and AWS D1.1 alongside local requirements. The basis is printed on sheet one of the calculations, and your engineer approves and seals the design.

Do you erect the buildings?

No. World Steel designs and fabricates the steel. The local contractor, our customer, erects it, with our drawings and support.

Can you supply cranes with a workshop?

Yes. We design the crane runway with the frame and can supply the overhead crane with the building on request.

How much steel can you fabricate for one estate job?

Our own plant fabricates 2,500 t of structural steel a month, and we have delivered single jobs of up to 5,000 t.

Building on a Trinidad and Tobago estate?

Send the lot, the use and your engineer’s code basis. We design the steel, fabricate it in our plant and ship it CIF Port of Spain.