Capacity for Suriname
Large Suriname projects need a large plant. Ours fabricates 2,500 t a month.
These are single jobs from our own plant in Vietnam, released area by area. Whatever Suriname is building, the steel comes from the same line.
Already in the Caribbean
Steel from our plant stands in Guyana today:
- 18 pedestrian bridges
- 6 warehouses
- 2 maintenance workshops
- 1 office building
- 1 mosque
Matched to Suriname
What Suriname builds, and the steel we supply for it
Shore bases and warehouses for offshore oil and gas, gold and bauxite mines in the interior, rice and agro-industry in Nickerie, and river crossings.
Oil, gas and petrochemical steel
Pipe racks, shore-base warehouses, process buildings and modules for oil and gas.
See the steel →Mining steel structures
Process plants, conveyor galleries, headframes and covers for mines.
See the steel →Warehouses and distribution
Clear-span distribution buildings with dock doors, mezzanines and racking loads, sized for the ports and estates of Suriname.
See the steel →Agricultural buildings
Packing houses, barns, feed stores and sheds with galvanized secondary steel.
See the steel →Pedestrian bridges
Steel truss footbridges over rivers, canals and busy roads, like the 18 we made for Guyana.
See the steel →Workshops with offices
Workshops with a built-in office block for fleets, marine yards and contractors’ own bases.
See the steel →Food and beverage plants
Food and beverage plants: processing halls, cold rooms, platforms and stores.
See the steel →Heavy industrial plants
Process buildings, conveyor galleries, pipe racks and maintenance shops for heavy industry.
See the steel →
Shipping to Suriname
From our plant to Paramaribo, FOB or CIF
Members leave Vietnam piece-marked and bundled in erection order. The voyage from the Vietnamese port to Paramaribo takes about 45 days; your contractor clears the cargo and takes it to site.
For Surinamese contractors
Why Surinamese contractors work with World Steel
One supplier for the whole steel package, made in one accredited plant and shipped to Paramaribo, with you in charge of the site.
Our own plant, 2,500 t a month
One plant in Vietnam fabricates 2,500 metric tons of structural steel a month, so a large Suriname package gets a production slot, not a place in a queue.
IAS AC472 accredited
The first and only fabricator in Vietnam accredited under IAS AC472, audited twice a year since 2019. Your inspector is welcome at every hold point.
One desk, one project manager
Design, drawings, steel, coating, inspection, packing and shipping under one contract, with one English-speaking project manager for your Suriname job.
Live in PEB Studio
Follow every member from cutting to the ship in real time, from your office in Paramaribo, and book cranes and crews on facts.
Shop drawings included
Tekla shop and erection drawings come with every project at no extra cost, ready for your engineer of record to approve.
FOB Vietnam or CIF Paramaribo
Two clear terms: take the steel at our port in Vietnam, or let us arrange sea freight and insurance through to Paramaribo.
About 45 days at sea
From the Vietnamese port to the Caribbean port takes about 45 days, with packing lists and shipping documents ready for your customs broker.
We never compete with you
We supply the steel structure only. Surinamese contractors win and build the job; we back the bid with drawings, calculations and live tracking.
Designed for Suriname
Built for the wind, salt and ground of Suriname
We design to the design basis set for Suriname with the values your engineer of record sets, state them on sheet one and coat the steel for the exposure of your site.
Hurricane wind
ModerateSalt air
HighEarthquake
Moderate
Caribbean hurricane and marine guides
The whole shelf
Every product and solution, available for Suriname
Anything in our catalog can ship to Paramaribo: structural steel and members, complete buildings, engineered solutions, and the coatings and quality records that go with them.
Structural steel and members
Frames, built-up members and multi-storey steel for buildings of any size.
Complete building packages
Whole buildings, frame to roof and wall cladding, packed as one shipment.
Solutions for island loads
Engineering groups written for hurricanes, earthquakes, salt air and remote sites.
Coating, quality and documents
What protects the steel and proves it: coatings, inspection, accreditation and sample files.
An invitation to Surinamese contractors
You win the job and build it. We fabricate the steel.
You know the river, the interior roads and the permits. We know how to fabricate large steel packages and ship them across the world. Together we can take on the projects the oil decade is bringing. You build; we fabricate.
- You, the Surinamese contractorWin the job, clear the cargo, erect the steel and run the site.
- World SteelDesign, drawings, fabrication, coating, inspection, packing and shipping.
- Your engineer of recordSets the loads, approves the drawings and seals them as local rules require.
- Start todayContact page for Suriname
Questions from Surinamese contractors
Buying steel for Suriname: the questions we hear
Can you supply steel for a mine in the interior?
Yes. Process buildings, conveyor galleries, workshops and covers, with members sized for the river and road route to site and packed in erection order.
Do you work in Dutch?
Our team works in English. Drawings, calculations and documents are in English, with metric units first, and your team can bring a Dutch-speaking colleague to any call.
What does World Steel supply for a project in Suriname?
The steel structure: design or a design check to the design basis set for Suriname with the loads your engineer of record sets, shop and erection drawings, fabricated and coated steel and bolts. Complete building packages add roof and wall cladding, doors and accessories, and overhead cranes can come with the building on request. The contractor, our customer, erects it.
How are price and delivery agreed for Suriname?
Every quote is written for its project; we do not publish prices. You choose FOB Vietnam or CIF to Paramaribo. The voyage from the Vietnamese port to the Caribbean takes about 45 days, and the production slot is named in the quote.
How we work in Suriname. World Steel designs and fabricates to the design basis set for Suriname and the standards it references, in our own plant in Vietnam. We hold no Surinamese approval, licence or registration and have no office or crew in Suriname. The contractor, our customer, erects the steel and runs the site; the engineer or architect of record approves the drawings and seals and files them as local rules require.
More for Suriname
Contact World Steel · Suriname
Talk to us about steel for Suriname
WhatsApp, email or a video call with our engineers, booked at an hour that suits Paramaribo. Our contact page for Suriname has the ports, the local time and the form.