Capacity for Curaçao
Large Curaçao projects need a large plant. Ours fabricates 2,500 t a month.
These are single jobs from our own plant in Vietnam, released area by area. Whatever Curaçao is building, the steel comes from the same line.
Already in the Caribbean
Steel from our plant stands in Guyana today:
- 18 pedestrian bridges
- 6 warehouses
- 2 maintenance workshops
- 1 office building
- 1 mosque
For Curaçaoan contractors
Why Curaçaoan contractors work with World Steel
One supplier for the whole steel package, made in one accredited plant and shipped to Willemstad, with you in charge of the site.
Our own plant, 2,500 t a month
One plant in Vietnam fabricates 2,500 metric tons of structural steel a month, so a large Curaçao package gets a production slot, not a place in a queue.
IAS AC472 accredited
The first and only fabricator in Vietnam accredited under IAS AC472, audited twice a year since 2019. Your inspector is welcome at every hold point.
One desk, one project manager
Design, drawings, steel, coating, inspection, packing and shipping under one contract, with one English-speaking project manager for your Curaçao job.
Live in PEB Studio
Follow every member from cutting to the ship in real time, from your office in Willemstad, and book cranes and crews on facts.
Shop drawings included
Tekla shop and erection drawings come with every project at no extra cost, ready for your engineer of record to approve.
FOB Vietnam or CIF Willemstad
Two clear terms: take the steel at our port in Vietnam, or let us arrange sea freight and insurance through to Willemstad.
About 45 days at sea
From the Vietnamese port to the Caribbean port takes about 45 days, with packing lists and shipping documents ready for your customs broker.
We never compete with you
We supply the steel structure only. Curaçaoan contractors win and build the job; we back the bid with drawings, calculations and live tracking.
Matched to Curaçao
What Curaçao builds, and the steel we supply for it
Harbour and drydock industry around the Schottegat, hotels in Willemstad and on the coast, warehouses, cold stores and power plants.
Heavy industrial plants
Process buildings, conveyor galleries, pipe racks and maintenance shops for heavy industry.
See the steel →Crane-supporting structures
Crane runway girders and crane-bay columns, with overhead cranes supplied with the building on request.
See the steel →Multi-storey hotels and offices
Multi-storey steel frames with composite deck for hotels, offices, apartments and hospitals.
See the steel →Warehouses and distribution
Clear-span distribution buildings with dock doors, mezzanines and racking loads, sized for the ports and estates of Curaçao.
See the steel →Cold storage buildings
Insulated cold rooms and chilled warehouses for fish, produce and food distribution in Curaçao.
See the steel →Energy and utility structures
Power plant buildings, substations and utility structures.
See the steel →Commercial buildings
Shops, showrooms, offices and mixed-use blocks on light, fast steel frames.
See the steel →Long-span structures
Long-span trusses and frames for terminals, arenas and hangars.
See the steel →
The whole shelf
Every product and solution, available for Curaçao
Anything in our catalog can ship to Willemstad: structural steel and members, complete buildings, engineered solutions, and the coatings and quality records that go with them.
Structural steel and members
Frames, built-up members and multi-storey steel for buildings of any size.
Complete building packages
Whole buildings, frame to roof and wall cladding, packed as one shipment.
Solutions for island loads
Engineering groups written for hurricanes, earthquakes, salt air and remote sites.
Coating, quality and documents
What protects the steel and proves it: coatings, inspection, accreditation and sample files.
Designed for Curaçao
Built for the wind, salt and ground of Curaçao
We design to the code basis agreed for Curaçao with the values your engineer of record sets, state them on sheet one and coat the steel for the exposure of your site.
Hurricane wind
ModerateSalt air
Very highEarthquake
Moderate
Caribbean hurricane and marine guides
Shipping to Curaçao
From our plant to Willemstad, FOB or CIF
Members leave Vietnam piece-marked and bundled in erection order. The voyage from the Vietnamese port to Willemstad takes about 45 days; your contractor clears the cargo and takes it to site.
An invitation to Curaçaoan contractors
You win the job and build it. We fabricate the steel.
Curaçao has an industrial harbour and contractors who know heavy work. We add a plant that fabricates 2,500 t a month and crane girders, platforms and frames to match. You build; we fabricate.
- You, the Curaçaoan contractorWin the job, clear the cargo, erect the steel and run the site.
- World SteelDesign, drawings, fabrication, coating, inspection, packing and shipping.
- Your engineer of recordSets the loads, approves the drawings and seals them as local rules require.
- Start todayContact page for Curaçao
Questions from Curaçaoan contractors
Buying steel for Curaçao: the questions we hear
Can you supply crane-bay buildings for harbour industry?
Yes. Crane runway girders, crane-bay columns and frames, with overhead cranes supplied with the building on request, coated for the harbour exposure.
What coating suits steel in Willemstad?
Harbour and coastal sites reach very high or extreme salt exposure. We propose a paint system, hot-dip galvanizing or duplex for the ISO 12944 category your engineer sets.
What does World Steel supply for a project in Curaçao?
The steel structure: design or a design check to the code basis agreed for Curaçao with the loads your engineer of record sets, shop and erection drawings, fabricated and coated steel and bolts. Complete building packages add roof and wall cladding, doors and accessories, and overhead cranes can come with the building on request. The contractor, our customer, erects it.
How are price and delivery agreed for Curaçao?
Every quote is written for its project; we do not publish prices. You choose FOB Vietnam or CIF to Willemstad. The voyage from the Vietnamese port to the Caribbean takes about 45 days, and the production slot is named in the quote.
How we work in Curaçao. World Steel designs and fabricates to the code basis agreed for Curaçao and the standards it references, in our own plant in Vietnam. We hold no Curaçaoan approval, licence or registration and have no office or crew in Curaçao. The contractor, our customer, erects the steel and runs the site; the engineer or architect of record approves the drawings and seals and files them as local rules require.
More for Curaçao
Contact World Steel · Curaçao
Talk to us about steel for Curaçao
WhatsApp, email or a video call with our engineers, booked at an hour that suits Willemstad. Our contact page for Curaçao has the ports, the local time and the form.