40-foot containers
Most of a steel building ships in standard and high-cube 40-foot boxes, loaded in erection order and sealed at our plant. Ship-to-shore cranes discharge them at the container berth.
The port
Caucedo opened in 2003 as a private port, and its container terminal handles most of the Dominican Republic’s container trade. Deep-sea services from Asia call here after the Panama Canal, which is why it is the port we quote by default for jobs in Santo Domingo, the east coast and the free zones around the capital.
The port is also a relay point. Some of the boxes discharged at Caucedo continue on feeder ships to the eastern Caribbean, and DP World runs a logistics park and economic zone inside the port gate, so cargo can be stored or consolidated without leaving the customs area.
Everything in your shipment is made in World Steel’s own plant in Vietnam: primary and secondary steel, built-up girders, cladding, trims and bolts. It leaves Cai Mep or Cat Lai in containers or on flat racks, and your customs broker clears it at Caucedo with the papers we send ahead.
Sea lane
An illustrative lane, measured as great-circle legs between waypoints. The carrier sets the actual routing on each sailing, and we never quote it in days.
Total about 10,800 nmi (20,000 km). Compare with a US port in the shipping simulator.
Handling
Containers, flat racks or breakbulk: we decide with you before fabrication, because it sets the splice points and the packing.
Most of a steel building ships in standard and high-cube 40-foot boxes, loaded in erection order and sealed at our plant. Ship-to-shore cranes discharge them at the container berth.
Girders, columns and trusses longer than about 12 m (39 ft) go on flat racks, lashed and covered, and are discharged by the same cranes.
Very large members can ship as breakbulk on a geared vessel and be landed at the 300 m conventional berth. We plan this with you and the carrier before fabrication.
Inland reach
Each province has its own page: the towns, the ground, the weather and the steel we recommend.
Receiving at Caucedo
Your broker can prepare the declaration in the Dominican customs system with our invoice, packing lists and bill of lading before the vessel arrives.
Lots arrive complete for one area of the building. Pull the containers for the next area first, using the lot numbers on the packing list.
If your laydown area is not ready, ask your broker about storing the lot in the port’s logistics park instead of on an open yard.
At our plant in Vietnam
Caucedo questions
Caucedo usually suits sites in Santo Domingo, the east and the free zones east of the capital, and it gets the most direct Asia services. Haina, west of the capital, can suit the south and west. We quote the port that gives the shortest truck run on the sailing you choose.
Yes. Flat racks are handled by the ship-to-shore cranes like containers. For members beyond flat-rack size we plan a breakbulk shipment to the conventional berth with you before fabrication.
Your customs broker, for the importer named in the quote. We send the commercial invoice, packing lists, bill of lading, certificate of origin and mill certificates ahead of arrival.
No. In the Caribbean World Steel supplies on FOB or CIF, so the steel is handed over in Vietnam and, under CIF, shipped to Caucedo. The contractor, our customer, receives, unloads and erects the steel.
Port facts as published by DP World Caucedo: infrastructure and Logistics Cluster: Dominican Republic port assessment, checked November 2026. The carrier and terminal confirm what applies to each call.
Send the drawings or the province, size and site date. We design or detail the steel, fabricate it in our plant in Vietnam at up to 2,500 metric tons a month and ship it packed in erection order to Caucedo.