Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

St Kitts and Nevis · Contact World Steel

Contact World Steel about structural steel for St Kitts and Nevis

Resorts, campus buildings, light industry and public works on St Kitts or Nevis: talk to the team that designs and fabricates the steel in our own plant in Vietnam and ships it to Basseterre, with the last leg to Nevis by sea.

Basseterre, St Kitts and Nevis

Plant & engineering, Vietnam

Vietnam is 11 hours ahead of Basseterre. Tell us when you are free and we book calls inside your working day.

  • Email

    Drawings, questions and quote requests from St Kitts and Nevis, read by our sales and engineering team.

    dang.victor@worldsteelgroup.com
  • Phone & WhatsApp

    International calls reach our head office in Vietnam. Ask for a call at an hour that suits Basseterre.

    +84 902 881 833 WhatsApp +84 902 881 833
  • Video call

    Walk through your St Kitts and Nevis drawings with an engineer on Zoom or Microsoft Teams, or watch an inspection live at the plant.

    Ask for a call
  • Kittitian and Nevisian contractors

    You win the job and build it; we design, detail and fabricate the steel and ship it to Basseterre.

    Contractor partnership

Send us a message from St Kitts and Nevis

Tell us about your St Kitts and Nevis project

A few lines are enough to start: the parish and whether the site is on St Kitts or Nevis, what you are building and a rough size. You get a reference number by email straight away, and a member of our team replies with questions or a written scope of supply.

Contractor partnership · St Kitts and Nevis

Kittitian and Nevisian contractors: you win the job, we fabricate the steel

Resorts on Frigate Bay, the South East Peninsula and Nevis, medical and veterinary campus buildings, warehouses near the Basseterre port, light industry and new schools and clinics are big steel packages. You win the job and run the site. We design, detail and fabricate the steel in our own plant, ship it to Basseterre or Nevis and back your bid with drawings and live tracking.

  • Resorts and villas on both islands
  • Campus, schools and clinics
  • Light industry and warehouses
  • Shop and erection drawings included

Who reads your message

The team that answers St Kitts and Nevis

The same sales team answers contractors, owners and engineers in St Kitts and Nevis. Write through the form above or on WhatsApp and the right person picks up your message.

Meet the full team

One team, two shores

Your site in St Kitts and Nevis, our plant in Vietnam

You talk to World Steel by WhatsApp, email or video. Your steel is engineered, fabricated, inspected and packed by the same company in Vietnam, shipped to Basseterre, and you follow every step in real time in PEB Studio.

  • St Kitts and Nevis

    Your project

    Shipped to Basseterre

    The contractor, our customer, erects the steel; the Kittitian and Nevisian engineer of record approves the drawings and files them. We have no office or crew in St Kitts and Nevis.

    Structural steel for St Kitts and Nevis
  • Vietnam

    Head office & engineering

    55 Le Thuc Hoach Street, Phu Tho Hoa Ward, Ho Chi Minh City, Vietnam

    Design to the St Kitts and Nevis building code in SAP2000 and Tekla Structures, project management and PEB Studio. Our US office in Westminster, California, handles coordination.

    +84 902 881 833
  • Vietnam

    Plant, IAS AC472 accredited

    Lot Q9-10-15-16, Street No. 7, Hai Son Industrial Park (Phase 3+4), Duc Hoa, Tay Ninh Province (formerly Long An), Vietnam

    Fabrication, QC, painting and export packing for St Kitts and Nevis. Visits and witnessed inspections by arrangement.

    Tour the plant

Getting here

Flying in from St Kitts and Nevis?

Two short drives take you from the runway to the shop floor. Step-by-step directions with photos of each stop.

Book a plant visit

Before you write

Read up on steel for St Kitts and Nevis

Six guides and a page for every parish, written for St Kitts and Nevis: the code basis, the loads, the coatings and the road from Basseterre.

St Kitts and Nevis Q&A

Questions contractors in St Kitts and Nevis ask first

Can you supply a project on Nevis?

Yes. The steel lands at Basseterre and the contractor takes it on to Charlestown or Long Point. We size and mark bundles for that crossing.

Can you supply light industrial buildings?

Yes. Portal frames with crane beams, mezzanines and canopies are frames we design and fabricate every month in our own plant.

Does World Steel have an office in St Kitts and Nevis?

No. We answer St Kitts and Nevis projects from our head office and plant in Vietnam and our US office in Westminster, California, by WhatsApp, email and video call. We work through contractors in St Kitts and Nevis: they win the job and build it, we design, detail and fabricate the steel and ship it to Basseterre.

Who erects the steel and who files the permit in St Kitts and Nevis?

The contractor, our customer, erects the steel and runs the site. The Kittitian and Nevisian engineer or architect of record approves the drawings and files them for the permit. We design to the St Kitts and Nevis building code with the loads they set and give them calculations, shop drawings and erection drawings to work from.

What should I send with my first message?

Tell us the parish and whether the site is on St Kitts or Nevis, what the building is for and a rough size in meters or feet, and attach any drawings you have. Files up to 50 MB each can go with the form. We do not publish prices: every quote is written for its project, with the scope of supply and the price FOB Vietnam or CIF to Basseterre.

Working in another country? Contact pages for all 26 Caribbean countries.

Made in Vietnam. Shipped to Basseterre.

Send the drawings or the parish, size and use. We set the design basis with your engineer of record, design or detail the steel to the St Kitts and Nevis building code, and quote it made in our plant in Vietnam, packed in erection order and shipped to Basseterre.