Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Jamaica · Contact World Steel

Contact World Steel about structural steel for Jamaica

From logistics parks around Kingston Harbour to resort blocks on the north coast, talk to the team that designs steel for Jamaican hurricane and earthquake loads, fabricates it in our own plant in Vietnam and ships it to Kingston or Montego Bay.

Kingston, Jamaica

Plant & engineering, Vietnam

Vietnam is 12 hours ahead of Kingston. Tell us when you are free and we book calls inside your working day.

  • Email

    Drawings, questions and quote requests from Jamaica, read by our sales and engineering team.

    dang.victor@worldsteelgroup.com
  • Phone & WhatsApp

    International calls reach our head office in Vietnam. Ask for a call at an hour that suits Kingston.

    +84 902 881 833 WhatsApp +84 902 881 833
  • Video call

    Walk through your Jamaica drawings with an engineer on Zoom or Microsoft Teams, or watch an inspection live at the plant.

    Ask for a call
  • Jamaican contractors

    You win the job and build it; we design, detail and fabricate the steel and ship it to Kingston.

    Contractor partnership

Send us a message from Jamaica

Tell us about your Jamaica project

A few lines are enough to start: the parish and the nearest town, what you are building and a rough size. You get a reference number by email straight away, and a member of our team replies with questions or a written scope of supply.

Contractor partnership · Jamaica

Jamaican contractors: you win the job, we fabricate the steel

Plants on Highway 2000, warehouses near Kingston Harbour, resort blocks on the north coast and bauxite works in the hills are big steel packages. You win the job and run the site. We design, detail and fabricate the steel in our own plant, ship it to Kingston and back your bid with drawings and live tracking.

  • Plants and logistics on Highway 2000
  • Resorts from Negril to Port Antonio
  • Bauxite, alumina and energy works
  • Shop and erection drawings included

Who reads your message

The team that answers Jamaica

The same sales team answers contractors, owners and engineers in Jamaica. Write through the form above or on WhatsApp and the right person picks up your message.

Meet the full team

One team, two shores

Your site in Jamaica, our plant in Vietnam

You talk to World Steel by WhatsApp, email or video. Your steel is engineered, fabricated, inspected and packed by the same company in Vietnam, shipped to Kingston, and you follow every step in real time in PEB Studio.

  • Jamaica

    Your project

    Shipped to Kingston, Montego Bay

    The contractor, our customer, erects the steel; the Jamaican engineer of record approves the drawings and files them. We have no office or crew in Jamaica.

    Structural steel for Jamaica
  • Vietnam

    Head office & engineering

    55 Le Thuc Hoach Street, Phu Tho Hoa Ward, Ho Chi Minh City, Vietnam

    Design to the Jamaica National Building Code in SAP2000 and Tekla Structures, project management and PEB Studio. Our US office in Westminster, California, handles coordination.

    +84 902 881 833
  • Vietnam

    Plant, IAS AC472 accredited

    Lot Q9-10-15-16, Street No. 7, Hai Son Industrial Park (Phase 3+4), Duc Hoa, Tay Ninh Province (formerly Long An), Vietnam

    Fabrication, QC, painting and export packing for Jamaica. Visits and witnessed inspections by arrangement.

    Tour the plant

Getting here

Flying in from Jamaica?

Two short drives take you from the runway to the shop floor. Step-by-step directions with photos of each stop.

Book a plant visit

Jamaica Q&A

Questions contractors in Jamaica ask first

Kingston or Montego Bay: which port do you ship to?

Kingston for most of the island; Montego Bay can suit jobs in St James, Hanover, Westmoreland and Trelawny. Tell us the parish and we suggest the port and the bundle sizes for the road from there.

Can you design for both hurricane and earthquake loads in Jamaica?

Yes. We design to the Jamaica National Building Code with the wind and seismic values your engineer of record sets for the site, and state them on the first calculation sheet.

Does World Steel have an office in Jamaica?

No. We answer Jamaica projects from our head office and plant in Vietnam and our US office in Westminster, California, by WhatsApp, email and video call. We work through contractors in Jamaica: they win the job and build it, we design, detail and fabricate the steel and ship it to Kingston.

Who erects the steel and who files the permit in Jamaica?

The contractor, our customer, erects the steel and runs the site. The Jamaican engineer or architect of record approves the drawings and files them for the permit. We design to the Jamaica National Building Code with the loads they set and give them calculations, shop drawings and erection drawings to work from.

What should I send with my first message?

Tell us the parish and the nearest town, what the building is for and a rough size in meters or feet, and attach any drawings you have. Files up to 50 MB each can go with the form. We do not publish prices: every quote is written for its project, with the scope of supply and the price FOB Vietnam or CIF to Kingston.

Working in another country? Contact pages for all 26 Caribbean countries.

Made in Vietnam. Shipped to Kingston.

Send the drawings or the parish, size and use. We set the design basis with your engineer of record, design or detail the steel to the Jamaica National Building Code, and quote it made in our plant in Vietnam, packed in erection order and shipped to Kingston.