Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Aruba · Contact World Steel

Contact World Steel about structural steel for Aruba

High-rise hotels on Palm Beach, energy and water works, warehouses near Barcadera: talk to the team that designs steel for constant trade winds and salt-laden sun, fabricates it in our own plant in Vietnam and ships it to the Port of Barcadera.

Oranjestad, Aruba

Plant & engineering, Vietnam

Vietnam is 11 hours ahead of Oranjestad. Tell us when you are free and we book calls inside your working day.

  • Email

    Drawings, questions and quote requests from Aruba, read by our sales and engineering team.

    dang.victor@worldsteelgroup.com
  • Phone & WhatsApp

    International calls reach our head office in Vietnam. Ask for a call at an hour that suits Oranjestad.

    +84 902 881 833 WhatsApp +84 902 881 833
  • Video call

    Walk through your Aruba drawings with an engineer on Zoom or Microsoft Teams, or watch an inspection live at the plant.

    Ask for a call
  • Aruban contractors

    You win the job and build it; we design, detail and fabricate the steel and ship it to Barcadera.

    Contractor partnership

Send us a message from Aruba

Tell us about your Aruba project

A few lines are enough to start: the region and how close the site is to the sea, what you are building and a rough size. You get a reference number by email straight away, and a member of our team replies with questions or a written scope of supply.

Contractor partnership · Aruba

Aruban contractors: you win the job, we fabricate the steel

Hotels and timeshare towers on the north-west beaches, the airport, schools, clinics and offices in Oranjestad, warehouses near Barcadera and energy and water buildings are large steel packages for a small island. You win the job and run the site. We design, detail and fabricate the steel in our own plant, ship it to Barcadera and back your bid with drawings and live tracking.

  • Hotels and resorts
  • Offices, clinics and schools
  • Energy, water and warehouses
  • Shop and erection drawings included

Who reads your message

The team that answers Aruba

The same sales team answers contractors, owners and engineers in Aruba. Write through the form above or on WhatsApp and the right person picks up your message.

Meet the full team

One team, two shores

Your site in Aruba, our plant in Vietnam

You talk to World Steel by WhatsApp, email or video. Your steel is engineered, fabricated, inspected and packed by the same company in Vietnam, shipped to Barcadera, and you follow every step in real time in PEB Studio.

  • Aruba

    Your project

    Shipped to Barcadera

    The contractor, our customer, erects the steel; the Aruban engineer of record approves the drawings and files them. We have no office or crew in Aruba.

    Structural steel for Aruba
  • Vietnam

    Head office & engineering

    55 Le Thuc Hoach Street, Phu Tho Hoa Ward, Ho Chi Minh City, Vietnam

    Design to the code basis agreed for Aruba in SAP2000 and Tekla Structures, project management and PEB Studio. Our US office in Westminster, California, handles coordination.

    +84 902 881 833
  • Vietnam

    Plant, IAS AC472 accredited

    Lot Q9-10-15-16, Street No. 7, Hai Son Industrial Park (Phase 3+4), Duc Hoa, Tay Ninh Province (formerly Long An), Vietnam

    Fabrication, QC, painting and export packing for Aruba. Visits and witnessed inspections by arrangement.

    Tour the plant

Getting here

Flying in from Aruba?

Two short drives take you from the runway to the shop floor. Step-by-step directions with photos of each stop.

Book a plant visit

Aruba Q&A

Questions contractors in Aruba ask first

Can you supply a high-rise hotel frame?

Yes. Multi-storey steel frames with composite deck are part of what our plant fabricates. Send the architectural set and we propose the frame with your engineer of record.

Can I send drawings with notes in Dutch or Papiamento?

Yes, send them as they are. Tell us which sheets carry the key requirements and our engineers come back with their questions in English.

Does World Steel have an office in Aruba?

No. We answer Aruba projects from our head office and plant in Vietnam and our US office in Westminster, California, by WhatsApp, email and video call. We work through contractors in Aruba: they win the job and build it, we design, detail and fabricate the steel and ship it to Barcadera.

Who erects the steel and who files the permit in Aruba?

The contractor, our customer, erects the steel and runs the site. The Aruban engineer or architect of record approves the drawings and files them for the permit. We design to the code basis agreed for Aruba with the loads they set and give them calculations, shop drawings and erection drawings to work from.

What should I send with my first message?

Tell us the region and how close the site is to the sea, what the building is for and a rough size in meters or feet, and attach any drawings you have. Files up to 50 MB each can go with the form. We do not publish prices: every quote is written for its project, with the scope of supply and the price FOB Vietnam or CIF to Barcadera.

Working in another country? Contact pages for all 26 Caribbean countries.

Made in Vietnam. Shipped to Barcadera.

Send the drawings or the region, size and use. We set the design basis with your engineer of record, design or detail the steel to the code basis agreed for Aruba, and quote it made in our plant in Vietnam, packed in erection order and shipped to Barcadera.