Capacity for Turks and Caicos
Large Turks and Caicos projects need a large plant. Ours fabricates 2,500 t a month.
These are single jobs from our own plant in Vietnam, released area by area. Whatever Turks and Caicos is building, the steel comes from the same line.
Already in the Caribbean
Steel from our plant stands in Guyana today:
- 18 pedestrian bridges
- 6 warehouses
- 2 maintenance workshops
- 1 office building
- 1 mosque
Matched to Turks and Caicos
What Turks and Caicos builds, and the steel we supply for it
Resorts and villas on Providenciales, warehouses and shops, airport buildings, and public works on Grand Turk and the other islands.
Multi-storey hotels and offices
Multi-storey steel frames with composite deck for hotels, offices, apartments and hospitals.
See the steel →Warehouses and distribution
Clear-span distribution buildings with dock doors, mezzanines and racking loads, sized for the ports and estates of Turks and Caicos.
See the steel →Aircraft hangars
Long-span hangars, terminals and airport support buildings, designed for the site wind.
See the steel →Commercial buildings
Shops, showrooms, offices and mixed-use blocks on light, fast steel frames.
See the steel →Cold storage buildings
Insulated cold rooms and chilled warehouses for fish, produce and food distribution in Turks and Caicos.
See the steel →Solar and EV canopies
Solar carports and EV charging canopies built for Turks and Caicos sun and storms.
See the steel →Equipment shelters
Compact equipment and utility shelters, shipped ready to bolt together.
See the steel →Schools and community halls
Schools, classrooms and community halls, designed to the loads your engineer of record sets.
See the steel →
For Turks and Caicos Islander contractors
Why Turks and Caicos Islander contractors work with World Steel
One supplier for the whole steel package, made in one accredited plant and shipped to Providenciales, with you in charge of the site.
Our own plant, 2,500 t a month
One plant in Vietnam fabricates 2,500 metric tons of structural steel a month, so a large Turks and Caicos package gets a production slot, not a place in a queue.
IAS AC472 accredited
The first and only fabricator in Vietnam accredited under IAS AC472, audited twice a year since 2019. Your inspector is welcome at every hold point.
One desk, one project manager
Design, drawings, steel, coating, inspection, packing and shipping under one contract, with one English-speaking project manager for your Turks and Caicos job.
Live in PEB Studio
Follow every member from cutting to the ship in real time, from your office in Cockburn Town, and book cranes and crews on facts.
Shop drawings included
Tekla shop and erection drawings come with every project at no extra cost, ready for your engineer of record to approve.
FOB Vietnam or CIF Providenciales
Two clear terms: take the steel at our port in Vietnam, or let us arrange sea freight and insurance through to Providenciales.
About 45 days at sea
From the Vietnamese port to the Caribbean port takes about 45 days, with packing lists and shipping documents ready for your customs broker.
We never compete with you
We supply the steel structure only. Turks and Caicos Islander contractors win and build the job; we back the bid with drawings, calculations and live tracking.
Designed for Turks and Caicos
Built for the wind, salt and ground of Turks and Caicos
We design to the Turks and Caicos building code with the values your engineer of record sets, state them on sheet one and coat the steel for the exposure of your site.
Hurricane wind
Very highSalt air
Very highEarthquake
Moderate
Caribbean hurricane and marine guides
The whole shelf
Every product and solution, available for Turks and Caicos
Anything in our catalog can ship to Providenciales: structural steel and members, complete buildings, engineered solutions, and the coatings and quality records that go with them.
Structural steel and members
Frames, built-up members and multi-storey steel for buildings of any size.
Complete building packages
Whole buildings, frame to roof and wall cladding, packed as one shipment.
Solutions for island loads
Engineering groups written for hurricanes, earthquakes, salt air and remote sites.
Coating, quality and documents
What protects the steel and proves it: coatings, inspection, accreditation and sample files.
Shipping to Turks and Caicos
From our plant to Providenciales, FOB or CIF
Members leave Vietnam piece-marked and bundled in erection order. The voyage from the Vietnamese port to Providenciales takes about 45 days; your contractor clears the cargo and takes it to site.
An invitation to Turks and Caicos Islander contractors
You win the job and build it. We fabricate the steel.
Low islands, strong winds and salt everywhere. We design for all three with your engineer, coat for the exposure and pack for island docks. You win the resort or the public job and build it; we fabricate the steel.
- You, the Turks and Caicos Islander contractorWin the job, clear the cargo, erect the steel and run the site.
- World SteelDesign, drawings, fabrication, coating, inspection, packing and shipping.
- Your engineer of recordSets the loads, approves the drawings and seals them as local rules require.
- Start todayContact page for Turks and Caicos
Questions from Turks and Caicos Islander contractors
Buying steel for Turks and Caicos: the questions we hear
What coating suits a Grace Bay resort?
Most sites sit in very high or extreme salt exposure. We propose a paint system, hot-dip galvanizing or duplex for the ISO 12944 category your engineer sets.
Can you supply Grand Turk or North Caicos?
Yes. We ship to Providenciales and pack bundles for the inter-island barge.
What does World Steel supply for a project in Turks and Caicos?
The steel structure: design or a design check to the Turks and Caicos building code with the loads your engineer of record sets, shop and erection drawings, fabricated and coated steel and bolts. Complete building packages add roof and wall cladding, doors and accessories, and overhead cranes can come with the building on request. The contractor, our customer, erects it.
How are price and delivery agreed for Turks and Caicos?
Every quote is written for its project; we do not publish prices. You choose FOB Vietnam or CIF to Providenciales. The voyage from the Vietnamese port to the Caribbean takes about 45 days, and the production slot is named in the quote.
How we work in Turks and Caicos. World Steel designs and fabricates to the Turks and Caicos building code and the standards it references, in our own plant in Vietnam. We hold no Turks and Caicos Islander approval, licence or registration and have no office or crew in Turks and Caicos. The contractor, our customer, erects the steel and runs the site; the engineer or architect of record approves the drawings and seals and files them as local rules require.
More for Turks and Caicos
Contact World Steel · Turks and Caicos
Talk to us about steel for Turks and Caicos
WhatsApp, email or a video call with our engineers, booked at an hour that suits Cockburn Town. Our contact page for Turks and Caicos has the ports, the local time and the form.