Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

The Bahamas · Contact World Steel

Contact World Steel about structural steel for the Bahamas

Resorts on the Family Islands, warehouses in Nassau or public works on Grand Bahama: talk to the team that designs steel for Bahamian hurricanes and storm surge, fabricates it in our own plant in Vietnam and ships it to Nassau or Freeport.

Nassau, The Bahamas

Plant & engineering, Vietnam

Vietnam is 11 or 12 hours ahead of Nassau, depending on daylight saving time. Tell us when you are free and we book calls inside your working day.

  • Email

    Drawings, questions and quote requests from the Bahamas, read by our sales and engineering team.

    dang.victor@worldsteelgroup.com
  • Phone & WhatsApp

    International calls reach our head office in Vietnam. Ask for a call at an hour that suits Nassau.

    +84 902 881 833 WhatsApp +84 902 881 833
  • Video call

    Walk through your The Bahamas drawings with an engineer on Zoom or Microsoft Teams, or watch an inspection live at the plant.

    Ask for a call
  • Bahamian contractors

    You win the job and build it; we design, detail and fabricate the steel and ship it to Nassau.

    Contractor partnership

Send us a message from the Bahamas

Tell us about your The Bahamas project

A few lines are enough to start: the island and whether the site has a dock, what you are building and a rough size. You get a reference number by email straight away, and a member of our team replies with questions or a written scope of supply.

Contractor partnership · The Bahamas

Bahamian contractors: you win the job, we fabricate the steel

Resorts in Nassau and the Family Islands, warehouses and terminals in Freeport, rebuilding in Abaco and public buildings on every island are big steel packages. You win the job and run the site. We design, detail and fabricate the steel in our own plant, ship it to Nassau or Freeport and back your bid with drawings and live tracking.

  • Resorts in Nassau and the Family Islands
  • Warehouses and terminals in Freeport
  • Storm-ready public buildings on every island
  • Shop and erection drawings included

Who reads your message

The team that answers the Bahamas

The same sales team answers contractors, owners and engineers in the Bahamas. Write through the form above or on WhatsApp and the right person picks up your message.

Meet the full team

One team, two shores

Your site in the Bahamas, our plant in Vietnam

You talk to World Steel by WhatsApp, email or video. Your steel is engineered, fabricated, inspected and packed by the same company in Vietnam, shipped to Nassau, and you follow every step in real time in PEB Studio.

  • The Bahamas

    Your project

    Shipped to Nassau, Freeport

    The contractor, our customer, erects the steel; the Bahamian engineer of record approves the drawings and files them. We have no office or crew in the Bahamas.

    Structural steel for the Bahamas
  • Vietnam

    Head office & engineering

    55 Le Thuc Hoach Street, Phu Tho Hoa Ward, Ho Chi Minh City, Vietnam

    Design to the Bahamas Building Code in SAP2000 and Tekla Structures, project management and PEB Studio. Our US office in Westminster, California, handles coordination.

    +84 902 881 833
  • Vietnam

    Plant, IAS AC472 accredited

    Lot Q9-10-15-16, Street No. 7, Hai Son Industrial Park (Phase 3+4), Duc Hoa, Tay Ninh Province (formerly Long An), Vietnam

    Fabrication, QC, painting and export packing for the Bahamas. Visits and witnessed inspections by arrangement.

    Tour the plant

Getting here

Flying in from the Bahamas?

Two short drives take you from the runway to the shop floor. Step-by-step directions with photos of each stop.

Book a plant visit

The Bahamas Q&A

Questions contractors in the Bahamas ask first

How does steel reach a Family Island?

Ocean freight lands at Nassau or Freeport. From there the steel goes on by inter-island freight boat or barge, arranged by the contractor. We size and mark bundles for that last leg so each one can be lifted with the equipment on the island.

Nassau or Freeport?

Freeport usually suits Grand Bahama and the northern islands, Nassau New Providence and the rest. Tell us the island and we suggest the port.

Does World Steel have an office in the Bahamas?

No. We answer The Bahamas projects from our head office and plant in Vietnam and our US office in Westminster, California, by WhatsApp, email and video call. We work through contractors in the Bahamas: they win the job and build it, we design, detail and fabricate the steel and ship it to Nassau.

Who erects the steel and who files the permit in the Bahamas?

The contractor, our customer, erects the steel and runs the site. The Bahamian engineer or architect of record approves the drawings and files them for the permit. We design to the Bahamas Building Code with the loads they set and give them calculations, shop drawings and erection drawings to work from.

What should I send with my first message?

Tell us the island and whether the site has a dock, what the building is for and a rough size in meters or feet, and attach any drawings you have. Files up to 50 MB each can go with the form. We do not publish prices: every quote is written for its project, with the scope of supply and the price FOB Vietnam or CIF to Nassau.

Working in another country? Contact pages for all 26 Caribbean countries.

Made in Vietnam. Shipped to Nassau.

Send the drawings or the island, size and use. We set the design basis with your engineer of record, design or detail the steel to the Bahamas Building Code, and quote it made in our plant in Vietnam, packed in erection order and shipped to Nassau.