Capacity for Belize
Large Belize projects need a large plant. Ours fabricates 2,500 t a month.
These are single jobs from our own plant in Vietnam, released area by area. Whatever Belize is building, the steel comes from the same line.
Already in the Caribbean
Steel from our plant stands in Guyana today:
- 18 pedestrian bridges
- 6 warehouses
- 2 maintenance workshops
- 1 office building
- 1 mosque
For Belizean contractors
Why Belizean contractors work with World Steel
One supplier for the whole steel package, made in one accredited plant and shipped to Belize City, with you in charge of the site.
Our own plant, 2,500 t a month
One plant in Vietnam fabricates 2,500 metric tons of structural steel a month, so a large Belize package gets a production slot, not a place in a queue.
IAS AC472 accredited
The first and only fabricator in Vietnam accredited under IAS AC472, audited twice a year since 2019. Your inspector is welcome at every hold point.
One desk, one project manager
Design, drawings, steel, coating, inspection, packing and shipping under one contract, with one English-speaking project manager for your Belize job.
Live in PEB Studio
Follow every member from cutting to the ship in real time, from your office in Belmopan, and book cranes and crews on facts.
Shop drawings included
Tekla shop and erection drawings come with every project at no extra cost, ready for your engineer of record to approve.
FOB Vietnam or CIF Belize City
Two clear terms: take the steel at our port in Vietnam, or let us arrange sea freight and insurance through to Belize City.
About 45 days at sea
From the Vietnamese port to the Caribbean port takes about 45 days, with packing lists and shipping documents ready for your customs broker.
We never compete with you
We supply the steel structure only. Belizean contractors win and build the job; we back the bid with drawings, calculations and live tracking.
Matched to Belize
What Belize builds, and the steel we supply for it
Sugar mills, citrus and banana packing, resorts on the cayes, warehouses on the coast, and bridges over rivers in the south.
Food and beverage plants
Food and beverage plants: processing halls, cold rooms, platforms and stores.
See the steel →Agricultural buildings
Packing houses, barns, feed stores and sheds with galvanized secondary steel.
See the steel →Warehouses and distribution
Clear-span distribution buildings with dock doors, mezzanines and racking loads, sized for the ports and estates of Belize.
See the steel →Multi-storey hotels and offices
Multi-storey steel frames with composite deck for hotels, offices, apartments and hospitals.
See the steel →Cold storage buildings
Insulated cold rooms and chilled warehouses for fish, produce and food distribution in Belize.
See the steel →Pedestrian bridges
Steel truss footbridges over rivers, canals and busy roads, like the 18 we made for Guyana.
See the steel →Plants with crane bays
Portal frames with crane bays for processing, packaging and manufacturing plants.
See the steel →Schools and community halls
Schools, classrooms and community halls, designed to the loads your engineer of record sets.
See the steel →
The whole shelf
Every product and solution, available for Belize
Anything in our catalog can ship to Belize City: structural steel and members, complete buildings, engineered solutions, and the coatings and quality records that go with them.
Structural steel and members
Frames, built-up members and multi-storey steel for buildings of any size.
Complete building packages
Whole buildings, frame to roof and wall cladding, packed as one shipment.
Solutions for island loads
Engineering groups written for hurricanes, earthquakes, salt air and remote sites.
Coating, quality and documents
What protects the steel and proves it: coatings, inspection, accreditation and sample files.
Designed for Belize
Built for the wind, salt and ground of Belize
We design to the Belize building code with the values your engineer of record sets, state them on sheet one and coat the steel for the exposure of your site.
Hurricane wind
Very highSalt air
HighEarthquake
High
Caribbean hurricane and marine guides
Shipping to Belize
From our plant to Belize City, FOB or CIF
Members leave Vietnam piece-marked and bundled in erection order. The voyage from the Vietnamese port to Belize City takes about 45 days; your contractor clears the cargo and takes it to site.
An invitation to Belizean contractors
You win the job and build it. We fabricate the steel.
From Orange Walk to Toledo, you know the land and the clients. We add a plant that fabricates 2,500 t a month and an engineering team that draws every piece. Win the job; we will fabricate the steel and ship it to your port.
- You, the Belizean contractorWin the job, clear the cargo, erect the steel and run the site.
- World SteelDesign, drawings, fabrication, coating, inspection, packing and shipping.
- Your engineer of recordSets the loads, approves the drawings and seals them as local rules require.
- Start todayContact page for Belize
Questions from Belizean contractors
Buying steel for Belize: the questions we hear
Can you ship to Big Creek for southern Belize?
Yes. Big Creek suits banana and southern projects; the Port of Belize suits Belize City and the north. CIF terms name the port you choose.
What do you supply for a sugar or citrus plant?
Process halls, stores, platforms, conveyor supports and packing buildings, designed for the equipment loads your engineer sets and coated for the conditions inside the plant.
What does World Steel supply for a project in Belize?
The steel structure: design or a design check to the Belize building code with the loads your engineer of record sets, shop and erection drawings, fabricated and coated steel and bolts. Complete building packages add roof and wall cladding, doors and accessories, and overhead cranes can come with the building on request. The contractor, our customer, erects it.
How are price and delivery agreed for Belize?
Every quote is written for its project; we do not publish prices. You choose FOB Vietnam or CIF to Belize City. The voyage from the Vietnamese port to the Caribbean takes about 45 days, and the production slot is named in the quote.
How we work in Belize. World Steel designs and fabricates to the Belize building code and the standards it references, in our own plant in Vietnam. We hold no Belizean approval, licence or registration and have no office or crew in Belize. The contractor, our customer, erects the steel and runs the site; the engineer or architect of record approves the drawings and seals and files them as local rules require.
More for Belize
Contact World Steel · Belize
Talk to us about steel for Belize
WhatsApp, email or a video call with our engineers, booked at an hour that suits Belmopan. Our contact page for Belize has the ports, the local time and the form.