Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Sint Maarten · Contact World Steel

Contact World Steel about structural steel for Sint Maarten

Rebuilding hotels, public works and commercial buildings on the Dutch side of the island: talk to the team that designs steel for hurricanes and hillside ground, fabricates it in our own plant in Vietnam and ships it to Pointe Blanche.

Philipsburg, Sint Maarten

Plant & engineering, Vietnam

Vietnam is 11 hours ahead of Philipsburg. Tell us when you are free and we book calls inside your working day.

  • Email

    Drawings, questions and quote requests from Sint Maarten, read by our sales and engineering team.

    dang.victor@worldsteelgroup.com
  • Phone & WhatsApp

    International calls reach our head office in Vietnam. Ask for a call at an hour that suits Philipsburg.

    +84 902 881 833 WhatsApp +84 902 881 833
  • Video call

    Walk through your Sint Maarten drawings with an engineer on Zoom or Microsoft Teams, or watch an inspection live at the plant.

    Ask for a call
  • St. Maartener contractors

    You win the job and build it; we design, detail and fabricate the steel and ship it to Pointe Blanche.

    Contractor partnership

Send us a message from Sint Maarten

Tell us about your Sint Maarten project

A few lines are enough to start: the area and the road access to the site, what you are building and a rough size. You get a reference number by email straight away, and a member of our team replies with questions or a written scope of supply.

Contractor partnership · Sint Maarten

St. Maarten contractors: you win the job, we fabricate the steel

Hotels and timeshare towers on the west end, the airport, schools, the hospital, shelters and government buildings, marina and port buildings and warehouses are large steel packages for half of a small island. You win the job and run the site. We design, detail and fabricate the steel in our own plant, ship it to Pointe Blanche and back your bid with drawings and live tracking.

  • Hotels and resorts
  • Schools, shelters and public buildings
  • Marina, port and airport buildings
  • Shop and erection drawings included

Who reads your message

The team that answers Sint Maarten

The same sales team answers contractors, owners and engineers in Sint Maarten. Write through the form above or on WhatsApp and the right person picks up your message.

Meet the full team

One team, two shores

Your site in Sint Maarten, our plant in Vietnam

You talk to World Steel by WhatsApp, email or video. Your steel is engineered, fabricated, inspected and packed by the same company in Vietnam, shipped to Pointe Blanche, and you follow every step in real time in PEB Studio.

  • Sint Maarten

    Your project

    Shipped to Pointe Blanche

    The contractor, our customer, erects the steel; the St. Maartener engineer of record approves the drawings and files them. We have no office or crew in Sint Maarten.

    Structural steel for Sint Maarten
  • Vietnam

    Head office & engineering

    55 Le Thuc Hoach Street, Phu Tho Hoa Ward, Ho Chi Minh City, Vietnam

    Design to the code basis agreed for Sint Maarten in SAP2000 and Tekla Structures, project management and PEB Studio. Our US office in Westminster, California, handles coordination.

    +84 902 881 833
  • Vietnam

    Plant, IAS AC472 accredited

    Lot Q9-10-15-16, Street No. 7, Hai Son Industrial Park (Phase 3+4), Duc Hoa, Tay Ninh Province (formerly Long An), Vietnam

    Fabrication, QC, painting and export packing for Sint Maarten. Visits and witnessed inspections by arrangement.

    Tour the plant

Getting here

Flying in from Sint Maarten?

Two short drives take you from the runway to the shop floor. Step-by-step directions with photos of each stop.

Book a plant visit

Before you write

Read up on steel for Sint Maarten

Six guides and a page for every area, written for Sint Maarten: the code basis, the loads, the coatings and the road from Pointe Blanche.

Sint Maarten Q&A

Questions contractors in Sint Maarten ask first

Can you supply a hotel being rebuilt after a hurricane?

Yes. Send what survives of the original drawings and the new design. We design the steel to the loads your engineer of record sets and release it in the order the contractor rebuilds.

Can steel go up to a hillside site?

Yes. Tell us the longest load the road takes and we split members and bundles to suit, with bolted splices designed in.

Does World Steel have an office in Sint Maarten?

No. We answer Sint Maarten projects from our head office and plant in Vietnam and our US office in Westminster, California, by WhatsApp, email and video call. We work through contractors in Sint Maarten: they win the job and build it, we design, detail and fabricate the steel and ship it to Pointe Blanche.

Who erects the steel and who files the permit in Sint Maarten?

The contractor, our customer, erects the steel and runs the site. The St. Maartener engineer or architect of record approves the drawings and files them for the permit. We design to the code basis agreed for Sint Maarten with the loads they set and give them calculations, shop drawings and erection drawings to work from.

What should I send with my first message?

Tell us the area and the road access to the site, what the building is for and a rough size in meters or feet, and attach any drawings you have. Files up to 50 MB each can go with the form. We do not publish prices: every quote is written for its project, with the scope of supply and the price FOB Vietnam or CIF to Pointe Blanche.

Working in another country? Contact pages for all 26 Caribbean countries.

Made in Vietnam. Shipped to Pointe Blanche.

Send the drawings or the area, size and use. We set the design basis with your engineer of record, design or detail the steel to the code basis agreed for Sint Maarten, and quote it made in our plant in Vietnam, packed in erection order and shipped to Pointe Blanche.