-
Email
Drawings, questions and quote requests from the Dominican Republic, read by our sales and engineering team.
dang.victor@worldsteelgroup.com -
Phone & WhatsApp
International calls reach our head office in Vietnam. Ask for a call at an hour that suits Santo Domingo.
+84 902 881 833 WhatsApp +84 902 881 833 -
Video call
Walk through your Dominican Republic drawings with an engineer on Zoom or Microsoft Teams, or watch an inspection live at the plant.
Ask for a call -
Dominican contractors
You win the job and build it; we design, detail and fabricate the steel and ship it to Caucedo.
Contractor partnership
Send us a message from the Dominican Republic
Tell us about your Dominican Republic project
A few lines are enough to start: the province and the nearest city, what you are building and a rough size. You get a reference number by email straight away, and a member of our team replies with questions or a written scope of supply.
Contractor partnership · Dominican Republic
Dominican contractors: you win the job, we fabricate the steel
Hotels and resorts in Punta Cana, Bávaro, La Romana and Puerto Plata, free-zone factories, warehouses near Caucedo and Haina, shopping centres and offices in Santo Domingo and Santiago, power plants, mines and airports are big steel packages. You win the job and run the site. We design, detail and fabricate the steel in our own plant, ship it to Caucedo, Haina or Puerto Plata and back your bid with drawings and live tracking.
- Hotels and resorts
- Free-zone factories and warehouses
- Energy, mining and airports
- Shop and erection drawings included
Who reads your message
The team that answers the Dominican Republic
The same sales team answers contractors, owners and engineers in the Dominican Republic. Write through the form above or on WhatsApp and the right person picks up your message.
One team, two shores
Your site in the Dominican Republic, our plant in Vietnam
You talk to World Steel by WhatsApp, email or video. Your steel is engineered, fabricated, inspected and packed by the same company in Vietnam, shipped to Caucedo, and you follow every step in real time in PEB Studio.
-
Dominican Republic
Your project
Shipped to Caucedo, Río Haina, Puerto Plata
The contractor, our customer, erects the steel; the Dominican engineer of record approves the drawings and files them. We have no office or crew in the Dominican Republic.
Structural steel for the Dominican Republic -
Vietnam
Head office & engineering
55 Le Thuc Hoach Street, Phu Tho Hoa Ward, Ho Chi Minh City, Vietnam
Design to the Dominican building regulations in SAP2000 and Tekla Structures, project management and PEB Studio. Our US office in Westminster, California, handles coordination.
+84 902 881 833 -
Vietnam
Plant, IAS AC472 accredited
Lot Q9-10-15-16, Street No. 7, Hai Son Industrial Park (Phase 3+4), Duc Hoa, Tay Ninh Province (formerly Long An), Vietnam
Fabrication, QC, painting and export packing for the Dominican Republic. Visits and witnessed inspections by arrangement.
Tour the plant
Getting here
Flying in from the Dominican Republic?
Two short drives take you from the runway to the shop floor. Step-by-step directions with photos of each stop.
- Tan Son Nhat Airport (SGN) Head officeDirections
- Head office Plant, Hai Son Industrial ParkDirections
Before you write
Read up on steel for the Dominican Republic
Six guides and a page for every province, written for the Dominican Republic: the code basis, the loads, the coatings and the road from Caucedo.
Structural steel for the Dominican Republic→
- Building regulations and permits→
- Earthquakes and seismic design→
- Hurricanes and coastal steel→
- Free zones and industry→
- Ports: Caucedo, Haina, Puerto Plata→
- Resorts and hotels→
- 32 provinces, one page each→
Dominican Republic Q&A
Questions contractors in the Dominican Republic ask first
Caucedo, Río Haina or Puerto Plata?
Caucedo and Río Haina suit the south and the capital, Puerto Plata the north coast and Santiago. Tell us the province and we suggest the port.
Can I send drawings in Spanish?
Yes, send them as they are. Tell us which sheets carry the key requirements and our engineers come back with their questions in English.
Does World Steel have an office in the Dominican Republic?
No. We answer Dominican Republic projects from our head office and plant in Vietnam and our US office in Westminster, California, by WhatsApp, email and video call. We work through contractors in the Dominican Republic: they win the job and build it, we design, detail and fabricate the steel and ship it to Caucedo.
Who erects the steel and who files the permit in the Dominican Republic?
The contractor, our customer, erects the steel and runs the site. The Dominican engineer or architect of record approves the drawings and files them for the permit. We design to the Dominican building regulations with the loads they set and give them calculations, shop drawings and erection drawings to work from.
What should I send with my first message?
Tell us the province and the nearest city, what the building is for and a rough size in meters or feet, and attach any drawings you have. Files up to 50 MB each can go with the form. We do not publish prices: every quote is written for its project, with the scope of supply and the price FOB Vietnam or CIF to Caucedo.
Working in another country? Contact pages for all 26 Caribbean countries.
Made in Vietnam. Shipped to Caucedo.
Send the drawings or the province, size and use. We set the design basis with your engineer of record, design or detail the steel to the Dominican building regulations, and quote it made in our plant in Vietnam, packed in erection order and shipped to Caucedo.