-
Email
Drawings, questions and quote requests from Haiti, read by our sales and engineering team.
dang.victor@worldsteelgroup.com -
Phone & WhatsApp
International calls reach our head office in Vietnam. Ask for a call at an hour that suits Port-au-Prince.
+84 902 881 833 WhatsApp +84 902 881 833 -
Video call
Walk through your Haiti drawings with an engineer on Zoom or Microsoft Teams, or watch an inspection live at the plant.
Ask for a call -
Haitian contractors
You win the job and build it; we design, detail and fabricate the steel and ship it to Port-au-Prince.
Contractor partnership
Send us a message from Haiti
Tell us about your Haiti project
A few lines are enough to start: the department and the nearest town, what you are building and a rough size. You get a reference number by email straight away, and a member of our team replies with questions or a written scope of supply.
Contractor partnership · Haiti
Haitian contractors: you win the job, we fabricate the steel
Schools, hospitals, warehouses, markets and factories across Haiti are big steel packages, often funded by development partners with strict seismic and quality requirements. You win the job and run the site. We design, detail and fabricate the steel in our own plant, ship it to Port-au-Prince or Cap-Haïtien and back your bid with drawings, inspection records and live tracking.
- Schools and hospitals built for earthquakes
- Warehouses for food and relief stocks
- Factories in the industrial parks
- Shop and erection drawings included
Who reads your message
The team that answers Haiti
The same sales team answers contractors, owners and engineers in Haiti. Write through the form above or on WhatsApp and the right person picks up your message.
One team, two shores
Your site in Haiti, our plant in Vietnam
You talk to World Steel by WhatsApp, email or video. Your steel is engineered, fabricated, inspected and packed by the same company in Vietnam, shipped to Port-au-Prince, and you follow every step in real time in PEB Studio.
-
Haiti
Your project
Shipped to Port-au-Prince, Cap-Haïtien
The contractor, our customer, erects the steel; the Haitian engineer of record approves the drawings and files them. We have no office or crew in Haiti.
Structural steel for Haiti -
Vietnam
Head office & engineering
55 Le Thuc Hoach Street, Phu Tho Hoa Ward, Ho Chi Minh City, Vietnam
Design to the Haiti National Building Code in SAP2000 and Tekla Structures, project management and PEB Studio. Our US office in Westminster, California, handles coordination.
+84 902 881 833 -
Vietnam
Plant, IAS AC472 accredited
Lot Q9-10-15-16, Street No. 7, Hai Son Industrial Park (Phase 3+4), Duc Hoa, Tay Ninh Province (formerly Long An), Vietnam
Fabrication, QC, painting and export packing for Haiti. Visits and witnessed inspections by arrangement.
Tour the plant
Getting here
Flying in from Haiti?
Two short drives take you from the runway to the shop floor. Step-by-step directions with photos of each stop.
- Tan Son Nhat Airport (SGN) Head officeDirections
- Head office Plant, Hai Son Industrial ParkDirections
Before you write
Read up on steel for Haiti
Six guides and a page for every department, written for Haiti: the code basis, the loads, the coatings and the road from Port-au-Prince.
Structural steel for Haiti→
- Building code (CNBH)→
- Earthquake steel design→
- Hurricanes and floods→
- Salt air and coatings→
- Port delivery: Port-au-Prince and Cap-Haïtien→
- Schools, hospitals and public works→
- 10 departments, one page each→
Haiti Q&A
Questions contractors in Haiti ask first
Can you design schools and clinics for Haitian earthquakes?
Yes. We design the steel frame to the Haiti National Building Code with the seismic and wind values your engineer of record sets for the site, and show the load path clearly in the calculations so it can be reviewed.
Do you work with NGOs and development programmes?
Yes, through the contractor they appoint. Send the tender documents or the programme’s specification and we quote the steel package to it.
Does World Steel have an office in Haiti?
No. We answer Haiti projects from our head office and plant in Vietnam and our US office in Westminster, California, by WhatsApp, email and video call. We work through contractors in Haiti: they win the job and build it, we design, detail and fabricate the steel and ship it to Port-au-Prince.
Who erects the steel and who files the permit in Haiti?
The contractor, our customer, erects the steel and runs the site. The Haitian engineer or architect of record approves the drawings and files them for the permit. We design to the Haiti National Building Code with the loads they set and give them calculations, shop drawings and erection drawings to work from.
What should I send with my first message?
Tell us the department and the nearest town, what the building is for and a rough size in meters or feet, and attach any drawings you have. Files up to 50 MB each can go with the form. We do not publish prices: every quote is written for its project, with the scope of supply and the price FOB Vietnam or CIF to Port-au-Prince.
Working in another country? Contact pages for all 26 Caribbean countries.
Made in Vietnam. Shipped to Port-au-Prince.
Send the drawings or the department, size and use. We set the design basis with your engineer of record, design or detail the steel to the Haiti National Building Code, and quote it made in our plant in Vietnam, packed in erection order and shipped to Port-au-Prince.