-
Email
Drawings, questions and quote requests from Bermuda, read by our sales and engineering team.
dang.victor@worldsteelgroup.com -
Phone & WhatsApp
International calls reach our head office in Vietnam. Ask for a call at an hour that suits Hamilton.
+84 902 881 833 WhatsApp +84 902 881 833 -
Video call
Walk through your Bermuda drawings with an engineer on Zoom or Microsoft Teams, or watch an inspection live at the plant.
Ask for a call -
Bermudian contractors
You win the job and build it; we design, detail and fabricate the steel and ship it to Hamilton.
Contractor partnership
Send us a message from Bermuda
Tell us about your Bermuda project
A few lines are enough to start: the parish and the access to the site, what you are building and a rough size. You get a reference number by email straight away, and a member of our team replies with questions or a written scope of supply.
Contractor partnership · Bermuda
Bermudian contractors: you win the job, we fabricate the steel
Office buildings in Hamilton, hotels and resorts on the south shore, healthcare, schools, the airport, marine buildings at Dockyard and warehouses near the port are big steel packages. You win the job and run the site. We design, detail and fabricate the steel in our own plant, ship it to Hamilton and back your bid with drawings and live tracking.
- Offices and mixed-use buildings
- Hotels and resorts
- Healthcare and schools
- Shop and erection drawings included
Who reads your message
The team that answers Bermuda
The same sales team answers contractors, owners and engineers in Bermuda. Write through the form above or on WhatsApp and the right person picks up your message.
One team, two shores
Your site in Bermuda, our plant in Vietnam
You talk to World Steel by WhatsApp, email or video. Your steel is engineered, fabricated, inspected and packed by the same company in Vietnam, shipped to Hamilton, and you follow every step in real time in PEB Studio.
-
Bermuda
Your project
Shipped to Hamilton
The contractor, our customer, erects the steel; the Bermudian engineer of record approves the drawings and files them. We have no office or crew in Bermuda.
Structural steel for Bermuda -
Vietnam
Head office & engineering
55 Le Thuc Hoach Street, Phu Tho Hoa Ward, Ho Chi Minh City, Vietnam
Design to the Bermuda Building Code in SAP2000 and Tekla Structures, project management and PEB Studio. Our US office in Westminster, California, handles coordination.
+84 902 881 833 -
Vietnam
Plant, IAS AC472 accredited
Lot Q9-10-15-16, Street No. 7, Hai Son Industrial Park (Phase 3+4), Duc Hoa, Tay Ninh Province (formerly Long An), Vietnam
Fabrication, QC, painting and export packing for Bermuda. Visits and witnessed inspections by arrangement.
Tour the plant
Getting here
Flying in from Bermuda?
Two short drives take you from the runway to the shop floor. Step-by-step directions with photos of each stop.
- Tan Son Nhat Airport (SGN) Head officeDirections
- Head office Plant, Hai Son Industrial ParkDirections
Before you write
Read up on steel for Bermuda
Six guides and a page for every parish, written for Bermuda: the code basis, the loads, the coatings and the road from Hamilton.
Bermuda Q&A
Questions contractors in Bermuda ask first
Hamilton or Dockyard?
Most cargo lands at Hamilton. Tell us the parish and we plan bundle sizes for Bermuda’s narrow roads.
Can you meet a Bermuda Building Code review?
We design to the Bermuda Building Code with the values your engineer of record sets, and give them calculations and drawings ready for their review and the planning submission they file.
Does World Steel have an office in Bermuda?
No. We answer Bermuda projects from our head office and plant in Vietnam and our US office in Westminster, California, by WhatsApp, email and video call. We work through contractors in Bermuda: they win the job and build it, we design, detail and fabricate the steel and ship it to Hamilton.
Who erects the steel and who files the permit in Bermuda?
The contractor, our customer, erects the steel and runs the site. The Bermudian engineer or architect of record approves the drawings and files them for the permit. We design to the Bermuda Building Code with the loads they set and give them calculations, shop drawings and erection drawings to work from.
What should I send with my first message?
Tell us the parish and the access to the site, what the building is for and a rough size in meters or feet, and attach any drawings you have. Files up to 50 MB each can go with the form. We do not publish prices: every quote is written for its project, with the scope of supply and the price FOB Vietnam or CIF to Hamilton.
Working in another country? Contact pages for all 26 Caribbean countries.
Made in Vietnam. Shipped to Hamilton.
Send the drawings or the parish, size and use. We set the design basis with your engineer of record, design or detail the steel to the Bermuda Building Code, and quote it made in our plant in Vietnam, packed in erection order and shipped to Hamilton.