Capacity for Dominica
Large Dominica projects need a large plant. Ours fabricates 2,500 t a month.
These are single jobs from our own plant in Vietnam, released area by area. Whatever Dominica is building, the steel comes from the same line.
Already in the Caribbean
Steel from our plant stands in Guyana today:
- 18 pedestrian bridges
- 6 warehouses
- 2 maintenance workshops
- 1 office building
- 1 mosque
For Dominican contractors
Why Dominican contractors work with World Steel
One supplier for the whole steel package, made in one accredited plant and shipped to Roseau, with you in charge of the site.
Our own plant, 2,500 t a month
One plant in Vietnam fabricates 2,500 metric tons of structural steel a month, so a large Dominica package gets a production slot, not a place in a queue.
IAS AC472 accredited
The first and only fabricator in Vietnam accredited under IAS AC472, audited twice a year since 2019. Your inspector is welcome at every hold point.
One desk, one project manager
Design, drawings, steel, coating, inspection, packing and shipping under one contract, with one English-speaking project manager for your Dominica job.
Live in PEB Studio
Follow every member from cutting to the ship in real time, from your office in Roseau, and book cranes and crews on facts.
Shop drawings included
Tekla shop and erection drawings come with every project at no extra cost, ready for your engineer of record to approve.
FOB Vietnam or CIF Roseau
Two clear terms: take the steel at our port in Vietnam, or let us arrange sea freight and insurance through to Roseau.
About 45 days at sea
From the Vietnamese port to the Caribbean port takes about 45 days, with packing lists and shipping documents ready for your customs broker.
We never compete with you
We supply the steel structure only. Dominican contractors win and build the job; we back the bid with drawings, calculations and live tracking.
Matched to Dominica
What Dominica builds, and the steel we supply for it
The new international airport, resilient schools, clinics and shelters, geothermal power, hillside resorts and warehouses around Roseau.
Aircraft hangars
Long-span hangars, terminals and airport support buildings, designed for the site wind.
See the steel →Multi-storey hotels and offices
Multi-storey steel frames with composite deck for hotels, offices, apartments and hospitals.
See the steel →Energy and utility structures
Power plant buildings, substations and utility structures.
See the steel →Warehouses and distribution
Clear-span distribution buildings with dock doors, mezzanines and racking loads, sized for the ports and estates of Dominica.
See the steel →Schools and community halls
Schools, classrooms and community halls, designed to the loads your engineer of record sets.
See the steel →Equipment shelters
Compact equipment and utility shelters, shipped ready to bolt together.
See the steel →Cold storage buildings
Insulated cold rooms and chilled warehouses for fish, produce and food distribution in Dominica.
See the steel →Pedestrian bridges
Steel truss footbridges over rivers, canals and busy roads, like the 18 we made for Guyana.
See the steel →
The whole shelf
Every product and solution, available for Dominica
Anything in our catalog can ship to Roseau: structural steel and members, complete buildings, engineered solutions, and the coatings and quality records that go with them.
Structural steel and members
Frames, built-up members and multi-storey steel for buildings of any size.
Complete building packages
Whole buildings, frame to roof and wall cladding, packed as one shipment.
Solutions for island loads
Engineering groups written for hurricanes, earthquakes, salt air and remote sites.
Coating, quality and documents
What protects the steel and proves it: coatings, inspection, accreditation and sample files.
Designed for Dominica
Built for the wind, salt and ground of Dominica
We design to the Dominica building code with the values your engineer of record sets, state them on sheet one and coat the steel for the exposure of your site.
Hurricane wind
Very highSalt air
Very highEarthquake
Very high
Caribbean hurricane and marine guides
Shipping to Dominica
From our plant to Roseau, FOB or CIF
Members leave Vietnam piece-marked and bundled in erection order. The voyage from the Vietnamese port to Roseau takes about 45 days; your contractor clears the cargo and takes it to site.
An invitation to Dominican contractors
You win the job and build it. We fabricate the steel.
Resilient buildings need good steel and good builders. You are the builders. We design the steel with your engineer of record for hurricane wind and earthquakes, fabricate it and ship it to Roseau. You build; we fabricate.
- You, the Dominican contractorWin the job, clear the cargo, erect the steel and run the site.
- World SteelDesign, drawings, fabrication, coating, inspection, packing and shipping.
- Your engineer of recordSets the loads, approves the drawings and seals them as local rules require.
- Start todayContact page for Dominica
Questions from Dominican contractors
Buying steel for Dominica: the questions we hear
Can you supply steel for resilient public buildings in Dominica?
Yes. Schools, clinics, shelters and offices, designed to the hurricane and seismic values your engineer of record sets, with connections and cladding fixings checked for uplift.
Can long members reach mountain sites?
Yes, with route planning. We splice members where hill roads need shorter lengths and mark every piece for erection.
What does World Steel supply for a project in Dominica?
The steel structure: design or a design check to the Dominica building code with the loads your engineer of record sets, shop and erection drawings, fabricated and coated steel and bolts. Complete building packages add roof and wall cladding, doors and accessories, and overhead cranes can come with the building on request. The contractor, our customer, erects it.
How are price and delivery agreed for Dominica?
Every quote is written for its project; we do not publish prices. You choose FOB Vietnam or CIF to Roseau. The voyage from the Vietnamese port to the Caribbean takes about 45 days, and the production slot is named in the quote.
How we work in Dominica. World Steel designs and fabricates to the Dominica building code and the standards it references, in our own plant in Vietnam. We hold no Dominican approval, licence or registration and have no office or crew in Dominica. The contractor, our customer, erects the steel and runs the site; the engineer or architect of record approves the drawings and seals and files them as local rules require.
More for Dominica
Contact World Steel · Dominica
Talk to us about steel for Dominica
WhatsApp, email or a video call with our engineers, booked at an hour that suits Roseau. Our contact page for Dominica has the ports, the local time and the form.