Capacity for the Bahamas
Large The Bahamas projects need a large plant. Ours fabricates 2,500 t a month.
These are single jobs from our own plant in Vietnam, released area by area. Whatever the Bahamas is building, the steel comes from the same line.
Already in the Caribbean
Steel from our plant stands in Guyana today:
- 18 pedestrian bridges
- 6 warehouses
- 2 maintenance workshops
- 1 office building
- 1 mosque
Matched to the Bahamas
What the Bahamas builds, and the steel we supply for it
Resorts and marinas, airport hangars, warehouses on every inhabited island, and public works rebuilt to stronger standards after storms.
Multi-storey hotels and offices
Multi-storey steel frames with composite deck for hotels, offices, apartments and hospitals.
See the steel →Aircraft hangars
Long-span hangars, terminals and airport support buildings, designed for the site wind.
See the steel →Warehouses and distribution
Clear-span distribution buildings with dock doors, mezzanines and racking loads, sized for the ports and estates of the Bahamas.
See the steel →Cold storage buildings
Insulated cold rooms and chilled warehouses for fish, produce and food distribution in the Bahamas.
See the steel →Commercial buildings
Shops, showrooms, offices and mixed-use blocks on light, fast steel frames.
See the steel →Solar and EV canopies
Solar carports and EV charging canopies built for The Bahamas sun and storms.
See the steel →Equipment shelters
Compact equipment and utility shelters, shipped ready to bolt together.
See the steel →Churches and assembly halls
Churches, mosques and assembly halls with wide interiors free of columns.
See the steel →
For Bahamian contractors
Why Bahamian contractors work with World Steel
One supplier for the whole steel package, made in one accredited plant and shipped to Nassau, with you in charge of the site.
Our own plant, 2,500 t a month
One plant in Vietnam fabricates 2,500 metric tons of structural steel a month, so a large The Bahamas package gets a production slot, not a place in a queue.
IAS AC472 accredited
The first and only fabricator in Vietnam accredited under IAS AC472, audited twice a year since 2019. Your inspector is welcome at every hold point.
One desk, one project manager
Design, drawings, steel, coating, inspection, packing and shipping under one contract, with one English-speaking project manager for your The Bahamas job.
Live in PEB Studio
Follow every member from cutting to the ship in real time, from your office in Nassau, and book cranes and crews on facts.
Shop drawings included
Tekla shop and erection drawings come with every project at no extra cost, ready for your engineer of record to approve.
FOB Vietnam or CIF Nassau
Two clear terms: take the steel at our port in Vietnam, or let us arrange sea freight and insurance through to Nassau.
About 45 days at sea
From the Vietnamese port to the Caribbean port takes about 45 days, with packing lists and shipping documents ready for your customs broker.
We never compete with you
We supply the steel structure only. Bahamian contractors win and build the job; we back the bid with drawings, calculations and live tracking.
Designed for the Bahamas
Built for the wind, salt and ground of the Bahamas
We design to the Bahamas Building Code with the values your engineer of record sets, state them on sheet one and coat the steel for the exposure of your site.
Hurricane wind
Very highSalt air
Very highEarthquake
Moderate
Caribbean hurricane and marine guides
The whole shelf
Every product and solution, available for the Bahamas
Anything in our catalog can ship to Nassau: structural steel and members, complete buildings, engineered solutions, and the coatings and quality records that go with them.
Structural steel and members
Frames, built-up members and multi-storey steel for buildings of any size.
Complete building packages
Whole buildings, frame to roof and wall cladding, packed as one shipment.
Solutions for island loads
Engineering groups written for hurricanes, earthquakes, salt air and remote sites.
Coating, quality and documents
What protects the steel and proves it: coatings, inspection, accreditation and sample files.
Shipping to the Bahamas
From our plant to Nassau, FOB or CIF
Members leave Vietnam piece-marked and bundled in erection order. The voyage from the Vietnamese port to Nassau takes about 45 days; your contractor clears the cargo and takes it to site.
An invitation to Bahamian contractors
You win the job and build it. We fabricate the steel.
Building on an out island is hard enough. We make the steel side simple: one desk, members packed for barge and truck, and drawings your crew can erect from. You win the work; we fabricate it.
- You, the Bahamian contractorWin the job, clear the cargo, erect the steel and run the site.
- World SteelDesign, drawings, fabrication, coating, inspection, packing and shipping.
- Your engineer of recordSets the loads, approves the drawings and seals them as local rules require.
- Start todayContact page for The Bahamas
Questions from Bahamian contractors
Buying steel for the Bahamas: the questions we hear
Can you pack steel for a Family Island site?
Yes. We size bundles and member lengths for the inter-island barge and the roads at the far end, mark every piece and list every bundle, so your crew finds what it needs on a small dock.
Do you design for Bahamas hurricane wind?
Yes. We take the basic wind speed and exposure your engineer of record sets under the Bahamas Building Code and size frames, purlins, girts and connections to them.
What does World Steel supply for a project in the Bahamas?
The steel structure: design or a design check to the Bahamas Building Code with the loads your engineer of record sets, shop and erection drawings, fabricated and coated steel and bolts. Complete building packages add roof and wall cladding, doors and accessories, and overhead cranes can come with the building on request. The contractor, our customer, erects it.
How are price and delivery agreed for the Bahamas?
Every quote is written for its project; we do not publish prices. You choose FOB Vietnam or CIF to Nassau. The voyage from the Vietnamese port to the Caribbean takes about 45 days, and the production slot is named in the quote.
How we work in the Bahamas. World Steel designs and fabricates to the Bahamas Building Code and the standards it references, in our own plant in Vietnam. We hold no Bahamian approval, licence or registration and have no office or crew in the Bahamas. The contractor, our customer, erects the steel and runs the site; the engineer or architect of record approves the drawings and seals and files them as local rules require.
More for the Bahamas
Contact World Steel · The Bahamas
Talk to us about steel for the Bahamas
WhatsApp, email or a video call with our engineers, booked at an hour that suits Nassau. Our contact page for the Bahamas has the ports, the local time and the form.