Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Caribbean industrial estates · Saint Lucia

Steel factory shells for Saint Lucia’s industrial estates

Invest Saint Lucia runs seven industrial estates and free zones on about 67 acres, with 26 factory shells from Castries in the north to Vieux Fort in the south. Many tenants outgrow a shell or need a new one built to their process. We design the buildings for your lot, fabricate them in our IAS AC472 accredited plant in Vietnam at 2,500 t a month and ship them FOB Vietnam or CIF Castries for the local contractor, our customer, to erect.

7estates and free zones, ISL
67 acresof estate land in total
2,500 ta month from our own plant
FOB · CIFthe two terms we offer
Odsan Vieux Fort FZ Dennery Union Bisee Vieux Fort IE Hewanorra
Pins are approximate and placed by district.

Seven estates, one fabricator

Choose your estate. The larger ones have their own steel guide.

Estate facts come from the Invest Saint Lucia asset portfolio and government news, with the year where given. Lots and shells are let by Invest Saint Lucia; we supply the steel building for the lot you hold.

01

Odsan, Castries

Odsan Industrial Estate and Free Zone

The largest Invest Saint Lucia estate: 37.2 acres of free-zone land outside Castries with factory shells and room to build.

  • 37.2 acres · largest ISL estate
  • 4 shells · 8 units, ISL
  • 50% · occupied, ISL portfolio
02

Vieux Fort, south coast

Vieux Fort Free Zone

A 12.7-acre Invest Saint Lucia free zone in Vieux Fort, the island’s southern port and airport town, with five factory shells.

  • 12.7 acres · free-zone land, ISL
  • 5 shells · factory buildings
  • 60% · occupied, ISL portfolio
03

Dennery, east coast

Dennery Industrial Estate

A 2.1-acre east coast estate with four shells, where Invest Saint Lucia retrofitted a shell for a poultry processing plant in 2019.

  • 2.1 acres · estate land, ISL
  • 75% · occupied, ISL portfolio
  • EC$4.3 M · poultry plant investment (2019)
04

Union, Castries

Union Industrial Estate

A 1.8-acre Invest Saint Lucia estate in Castries with two factory shells.

  • 1.8 acres · ISL
  • 2 shells · 50% occupied
05

Bisee, Castries

Bisee Industrial Estate

A 2.1-acre Invest Saint Lucia estate in Castries with three shells split into six units, 83% occupied.

  • 2.1 acres · ISL
  • 6 units · 83% occupied
06

Vieux Fort, south coast

Vieux Fort Industrial Estate

A 2.1-acre Invest Saint Lucia estate in Vieux Fort with three factory shells.

  • 2.1 acres · ISL
  • 3 shells · 33% occupied
07

Vieux Fort, by Hewanorra airport

Hewanorra Free Zone

A 9-acre Invest Saint Lucia free zone in Vieux Fort with four shells and ten units, most of them free.

  • 9.0 acres · ISL
  • 10 units · 10% occupied

Sources: Invest Saint Lucia asset portfolio (undated), Government of Saint Lucia news (2019). Occupancy figures are as the portfolio states them; check lots and leases with Invest Saint Lucia.

Why Saint Lucian contractors trust the package

Standards you can submit, shipping you can plan, quality you can inspect

Standards you can submit

Every building is designed to the code basis your engineer of record names, with the basis on sheet one of the calculations for the planning approval.

  • Saint Lucia building code guide
  • AISC 360 and AWS D1.1 designed to
  • Mill certificates for every heat
  • Your engineer of record approves and seals

Shipping you can plan

About 45 days at sea from the Vietnamese port to Castries on a typical sailing, confirmed at booking. Our plant is about two hours by road from the port.

  • FOB Vietnamese port or CIF Castries
  • Packed in erection order
  • Bundle lists by building and area
  • Tracked live in PEB Studio

Quality you can inspect

Inspection items and rates are agreed with you before cutting, and your inspector can watch online or visit the plant.

  • Inspection and test plan agreed per job
  • AWS-qualified welders
  • Coating readings recorded
  • Materials tested at ILAC labs

From our plant to your estate gate

Five legs from Vietnam to a Saint Lucian estate

Sailing time is the typical figure from the Vietnamese port and is confirmed at booking. Steel is packed in erection order, so the first bundles off the truck are the first members your crew needs.

  1. Our plantFabricated, coated and packed in erection order
  2. Vietnamese portAbout two hours by road from the plant
  3. At seaAbout 45 days to Castries, typical sailing
  4. CastriesCleared by your broker on CIF terms
  5. Estate gateBy road to Odsan, Bisee, Dennery or Vieux Fort

From our plant

Where every Saint Lucia estate building is made

Real World Steel photos from our plant in Vietnam. None is shown as a site in Saint Lucia.

Every building is designed to the code basis your engineer of record names, made in an IAS AC472 accredited plant and checked to an inspection plan you agree.

Large-project capacity

Built for the biggest jobs on any Saint Lucia estate

Our own plant in Vietnam fabricates 2,500 t of structural steel a month. These are real World Steel jobs, plus the steel we have already shipped to the Caribbean, erected by the local contractor, our customer.

5,000 tSunpro Steel mill
2,500 tCPV Food plant
2,000 tLong Son oil and gas, 56,000+ m²
2,000 tM&D Warehouse, Thailand
20projects already shipped to Guyana

Questions

Questions on steel buildings for Saint Lucia’s estates

Which Saint Lucian estates do you supply?

All seven Invest Saint Lucia estates and free zones, Union, Bisee, Odsan, Dennery, the Vieux Fort Industrial Estate, the Vieux Fort Free Zone and the Hewanorra Free Zone, plus any other lot you hold. We supply the steel building; Invest Saint Lucia handles the lease.

On what terms do you ship to Saint Lucia?

FOB at the Vietnamese port, where your forwarder takes over, or CIF Castries, where we book and insure the sailing. Clearance is handled by your broker.

How long does steel take to reach Castries?

About 45 days at sea from the Vietnamese port on a typical sailing, confirmed at booking. Our plant is about two hours by road from the port.

Which code are the buildings designed to?

To the code basis your engineer of record names for Saint Lucia, commonly with AISC 360 and AWS D1.1. Your engineer approves and seals the design.

Do you design for hurricanes and earthquakes?

Yes. Your engineer sets the wind and seismic basis; we design the frame, cladding fixings and connections to it.

Do you erect the buildings?

No. World Steel designs and fabricates the steel. The local contractor, our customer, erects it.

How much steel can you fabricate for one estate job?

Our own plant fabricates 2,500 t of structural steel a month, and we have delivered single jobs of up to 5,000 t.

Building on a Saint Lucian estate?

Send the lot, the use and your engineer’s code basis. We design the steel, fabricate it in our plant and ship it CIF Castries.