Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Cayman Islands · Solutions and products

Steel solutions and products for the Cayman Islands

Offices and hotels in George Town and Seven Mile Beach, warehouses, schools and sports buildings: here is every steel product and solution we supply for the Cayman Islands, shipped to George Town.

Caymanian contractors, on Grand Cayman or the Sister Islands, this page lists everything we make for you.

Manifest · Vietnam to

George Town

FromWorld Steel plant, Vietnam
ToGeorge Town
TermsFOB Vietnam or CIF
At seaAbout 45 days
PackingErection order, every piece marked
Simulate the voyage to George Town

Capacity for the Cayman Islands

Large Cayman Islands projects need a large plant. Ours fabricates 2,500 t a month.

These are single jobs from our own plant in Vietnam, released area by area. Whatever the Cayman Islands is building, the steel comes from the same line.

For Caymanian contractors

Why Caymanian contractors work with World Steel

One supplier for the whole steel package, made in one accredited plant and shipped to George Town, with you in charge of the site.

  • Our own plant, 2,500 t a month

    One plant in Vietnam fabricates 2,500 metric tons of structural steel a month, so a large Cayman Islands package gets a production slot, not a place in a queue.

  • IAS AC472 accredited

    The first and only fabricator in Vietnam accredited under IAS AC472, audited twice a year since 2019. Your inspector is welcome at every hold point.

  • One desk, one project manager

    Design, drawings, steel, coating, inspection, packing and shipping under one contract, with one English-speaking project manager for your Cayman Islands job.

  • Live in PEB Studio

    Follow every member from cutting to the ship in real time, from your office in George Town, and book cranes and crews on facts.

  • Shop drawings included

    Tekla shop and erection drawings come with every project at no extra cost, ready for your engineer of record to approve.

  • FOB Vietnam or CIF George Town

    Two clear terms: take the steel at our port in Vietnam, or let us arrange sea freight and insurance through to George Town.

  • About 45 days at sea

    From the Vietnamese port to the Caribbean port takes about 45 days, with packing lists and shipping documents ready for your customs broker.

  • We never compete with you

    We supply the steel structure only. Caymanian contractors win and build the job; we back the bid with drawings, calculations and live tracking.

The whole shelf

Every product and solution, available for the Cayman Islands

Anything in our catalog can ship to George Town: structural steel and members, complete buildings, engineered solutions, and the coatings and quality records that go with them.

Structural steel and members

Frames, built-up members and multi-storey steel for buildings of any size.

Complete building packages

Whole buildings, frame to roof and wall cladding, packed as one shipment.

Solutions for island loads

Engineering groups written for hurricanes, earthquakes, salt air and remote sites.

Coating, quality and documents

What protects the steel and proves it: coatings, inspection, accreditation and sample files.

Designed for the Cayman Islands

Built for the wind, salt and ground of the Cayman Islands

We design to the Cayman Islands Building Code with the values your engineer of record sets, state them on sheet one and coat the steel for the exposure of your site.

Shipping to the Cayman Islands

From our plant to George Town, FOB or CIF

Members leave Vietnam piece-marked and bundled in erection order. The voyage from the Vietnamese port to George Town takes about 45 days; your contractor clears the cargo and takes it to site.

FOBVietnamYou or your forwarder book the ship from our port.
CIFGeorge TownWe book sea freight and insurance to your port.

An invitation to Caymanian contractors

You win the job and build it. We fabricate the steel.

Cayman clients expect quality and clear paperwork. We deliver both: mill certificates by heat, an inspection plan agreed with you and every member tracked in PEB Studio. You win the job and build it; we fabricate.

  • You, the Caymanian contractorWin the job, clear the cargo, erect the steel and run the site.
  • World SteelDesign, drawings, fabrication, coating, inspection, packing and shipping.
  • Your engineer of recordSets the loads, approves the drawings and seals them as local rules require.

Questions from Caymanian contractors

Buying steel for the Cayman Islands: the questions we hear

Do you design for Cayman hurricane wind?

Yes. We take the basic wind speed and exposure your engineer of record sets under the Cayman Islands Building Code and size frames, cladding supports and connections to them.

Can you supply Cayman Brac or Little Cayman?

Yes. We ship to George Town and pack bundles for the onward trip to the Sister Islands.

What does World Steel supply for a project in the Cayman Islands?

The steel structure: design or a design check to the Cayman Islands Building Code with the loads your engineer of record sets, shop and erection drawings, fabricated and coated steel and bolts. Complete building packages add roof and wall cladding, doors and accessories, and overhead cranes can come with the building on request. The contractor, our customer, erects it.

How are price and delivery agreed for the Cayman Islands?

Every quote is written for its project; we do not publish prices. You choose FOB Vietnam or CIF to George Town. The voyage from the Vietnamese port to the Caribbean takes about 45 days, and the production slot is named in the quote.

How we work in the Cayman Islands. World Steel designs and fabricates to the Cayman Islands Building Code and the standards it references, in our own plant in Vietnam. We hold no Caymanian approval, licence or registration and have no office or crew in the Cayman Islands. The contractor, our customer, erects the steel and runs the site; the engineer or architect of record approves the drawings and seals and files them as local rules require.

More for the Cayman Islands

Contact World Steel · Cayman Islands

Talk to us about steel for the Cayman Islands

WhatsApp, email or a video call with our engineers, booked at an hour that suits George Town. Our contact page for the Cayman Islands has the ports, the local time and the form.