Capacity for Jamaica
Large Jamaica projects need a large plant. Ours fabricates 2,500 t a month.
These are single jobs from our own plant in Vietnam, released area by area. Whatever Jamaica is building, the steel comes from the same line.
Already in the Caribbean
Steel from our plant stands in Guyana today:
- 18 pedestrian bridges
- 6 warehouses
- 2 maintenance workshops
- 1 office building
- 1 mosque
Matched to Jamaica
What Jamaica builds, and the steel we supply for it
Logistics parks around Kingston, bauxite and alumina works, resorts from Negril to Ocho Rios, food plants and airport buildings.
Warehouses and distribution
Clear-span distribution buildings with dock doors, mezzanines and racking loads, sized for the ports and estates of Jamaica.
See the steel →Heavy industrial plants
Process buildings, conveyor galleries, pipe racks and maintenance shops for heavy industry.
See the steel →Multi-storey hotels and offices
Multi-storey steel frames with composite deck for hotels, offices, apartments and hospitals.
See the steel →Plants with crane bays
Portal frames with crane bays for processing, packaging and manufacturing plants.
See the steel →Cold storage buildings
Insulated cold rooms and chilled warehouses for fish, produce and food distribution in Jamaica.
See the steel →Aircraft hangars
Long-span hangars, terminals and airport support buildings, designed for the site wind.
See the steel →Food and beverage plants
Food and beverage plants: processing halls, cold rooms, platforms and stores.
See the steel →Commercial buildings
Shops, showrooms, offices and mixed-use blocks on light, fast steel frames.
See the steel →
For Jamaican contractors
Why Jamaican contractors work with World Steel
One supplier for the whole steel package, made in one accredited plant and shipped to Kingston, with you in charge of the site.
Our own plant, 2,500 t a month
One plant in Vietnam fabricates 2,500 metric tons of structural steel a month, so a large Jamaica package gets a production slot, not a place in a queue.
IAS AC472 accredited
The first and only fabricator in Vietnam accredited under IAS AC472, audited twice a year since 2019. Your inspector is welcome at every hold point.
One desk, one project manager
Design, drawings, steel, coating, inspection, packing and shipping under one contract, with one English-speaking project manager for your Jamaica job.
Live in PEB Studio
Follow every member from cutting to the ship in real time, from your office in Kingston, and book cranes and crews on facts.
Shop drawings included
Tekla shop and erection drawings come with every project at no extra cost, ready for your engineer of record to approve.
FOB Vietnam or CIF Kingston
Two clear terms: take the steel at our port in Vietnam, or let us arrange sea freight and insurance through to Kingston.
About 45 days at sea
From the Vietnamese port to the Caribbean port takes about 45 days, with packing lists and shipping documents ready for your customs broker.
We never compete with you
We supply the steel structure only. Jamaican contractors win and build the job; we back the bid with drawings, calculations and live tracking.
Designed for Jamaica
Built for the wind, salt and ground of Jamaica
We design to the Jamaica National Building Code with the values your engineer of record sets, state them on sheet one and coat the steel for the exposure of your site.
Hurricane wind
Very highSalt air
Very highEarthquake
Very high
Caribbean hurricane and marine guides
The whole shelf
Every product and solution, available for Jamaica
Anything in our catalog can ship to Kingston: structural steel and members, complete buildings, engineered solutions, and the coatings and quality records that go with them.
Structural steel and members
Frames, built-up members and multi-storey steel for buildings of any size.
Complete building packages
Whole buildings, frame to roof and wall cladding, packed as one shipment.
Solutions for island loads
Engineering groups written for hurricanes, earthquakes, salt air and remote sites.
Coating, quality and documents
What protects the steel and proves it: coatings, inspection, accreditation and sample files.
Shipping to Jamaica
From our plant to Kingston, FOB or CIF
Members leave Vietnam piece-marked and bundled in erection order. The voyage from the Vietnamese port to Kingston takes about 45 days; your contractor clears the cargo and takes it to site.
An invitation to Jamaican contractors
You win the job and build it. We fabricate the steel.
Jamaica is built by Jamaican contractors, and we want to keep it that way. You win the tender and run the site; we design, detail and fabricate the steel, ship it to Kingston and stand behind it with records for every member.
- You, the Jamaican contractorWin the job, clear the cargo, erect the steel and run the site.
- World SteelDesign, drawings, fabrication, coating, inspection, packing and shipping.
- Your engineer of recordSets the loads, approves the drawings and seals them as local rules require.
- Start todayContact page for Jamaica
Questions from Jamaican contractors
Buying steel for Jamaica: the questions we hear
Do you design for both hurricanes and earthquakes in Jamaica?
Yes. Jamaica has both, so we take the wind and seismic values your engineer of record sets for the parish and site class and check every frame for the governing case, with the basis printed on sheet one.
Can you ship to Montego Bay as well as Kingston?
Yes. Kingston suits most sites in the east and the middle of the island; Montego Bay suits the west and the north coast resorts. CIF terms name the port you choose.
What does World Steel supply for a project in Jamaica?
The steel structure: design or a design check to the Jamaica National Building Code with the loads your engineer of record sets, shop and erection drawings, fabricated and coated steel and bolts. Complete building packages add roof and wall cladding, doors and accessories, and overhead cranes can come with the building on request. The contractor, our customer, erects it.
How are price and delivery agreed for Jamaica?
Every quote is written for its project; we do not publish prices. You choose FOB Vietnam or CIF to Kingston. The voyage from the Vietnamese port to the Caribbean takes about 45 days, and the production slot is named in the quote.
How we work in Jamaica. World Steel designs and fabricates to the Jamaica National Building Code and the standards it references, in our own plant in Vietnam. We hold no Jamaican approval, licence or registration and have no office or crew in Jamaica. The contractor, our customer, erects the steel and runs the site; the engineer or architect of record approves the drawings and seals and files them as local rules require.
More for Jamaica
Contact World Steel · Jamaica
Talk to us about steel for Jamaica
WhatsApp, email or a video call with our engineers, booked at an hour that suits Kingston. Our contact page for Jamaica has the ports, the local time and the form.