Capacity for Montserrat
Large Montserrat projects need a large plant. Ours fabricates 2,500 t a month.
These are single jobs from our own plant in Vietnam, released area by area. Whatever Montserrat is building, the steel comes from the same line.
Already in the Caribbean
Steel from our plant stands in Guyana today:
- 18 pedestrian bridges
- 6 warehouses
- 2 maintenance workshops
- 1 office building
- 1 mosque
Matched to Montserrat
What Montserrat builds, and the steel we supply for it
The new town and port at Little Bay, public buildings in Brades, power and utility structures, warehouses and schools, all in the north, away from the exclusion zone.
Multi-storey hotels and offices
Multi-storey steel frames with composite deck for hotels, offices, apartments and hospitals.
See the steel →Energy and utility structures
Power plant buildings, substations and utility structures.
See the steel →Warehouses and distribution
Clear-span distribution buildings with dock doors, mezzanines and racking loads, sized for the ports and estates of Montserrat.
See the steel →Schools and community halls
Schools, classrooms and community halls, designed to the loads your engineer of record sets.
See the steel →Equipment shelters
Compact equipment and utility shelters, shipped ready to bolt together.
See the steel →Aircraft hangars
Long-span hangars, terminals and airport support buildings, designed for the site wind.
See the steel →Commercial buildings
Shops, showrooms, offices and mixed-use blocks on light, fast steel frames.
See the steel →Cold storage buildings
Insulated cold rooms and chilled warehouses for fish, produce and food distribution in Montserrat.
See the steel →
Shipping to Montserrat
From our plant to Little Bay, FOB or CIF
Members leave Vietnam piece-marked and bundled in erection order. The voyage from the Vietnamese port to Little Bay takes about 45 days; your contractor clears the cargo and takes it to site.
For Montserratian contractors
Why Montserratian contractors work with World Steel
One supplier for the whole steel package, made in one accredited plant and shipped to Little Bay, with you in charge of the site.
Our own plant, 2,500 t a month
One plant in Vietnam fabricates 2,500 metric tons of structural steel a month, so a large Montserrat package gets a production slot, not a place in a queue.
IAS AC472 accredited
The first and only fabricator in Vietnam accredited under IAS AC472, audited twice a year since 2019. Your inspector is welcome at every hold point.
One desk, one project manager
Design, drawings, steel, coating, inspection, packing and shipping under one contract, with one English-speaking project manager for your Montserrat job.
Live in PEB Studio
Follow every member from cutting to the ship in real time, from your office in Brades, and book cranes and crews on facts.
Shop drawings included
Tekla shop and erection drawings come with every project at no extra cost, ready for your engineer of record to approve.
FOB Vietnam or CIF Little Bay
Two clear terms: take the steel at our port in Vietnam, or let us arrange sea freight and insurance through to Little Bay.
About 45 days at sea
From the Vietnamese port to the Caribbean port takes about 45 days, with packing lists and shipping documents ready for your customs broker.
We never compete with you
We supply the steel structure only. Montserratian contractors win and build the job; we back the bid with drawings, calculations and live tracking.
Designed for Montserrat
Built for the wind, salt and ground of Montserrat
We design to the Montserrat building code with the values your engineer of record sets, state them on sheet one and coat the steel for the exposure of your site.
Hurricane wind
Very highSalt air
Very highEarthquake
Very high
Caribbean hurricane and marine guides
The whole shelf
Every product and solution, available for Montserrat
Anything in our catalog can ship to Little Bay: structural steel and members, complete buildings, engineered solutions, and the coatings and quality records that go with them.
Structural steel and members
Frames, built-up members and multi-storey steel for buildings of any size.
Complete building packages
Whole buildings, frame to roof and wall cladding, packed as one shipment.
Solutions for island loads
Engineering groups written for hurricanes, earthquakes, salt air and remote sites.
Coating, quality and documents
What protects the steel and proves it: coatings, inspection, accreditation and sample files.
An invitation to Montserratian contractors
You win the job and build it. We fabricate the steel.
A small island building a new town needs a supplier that makes it simple. One desk, one project manager, drawings included and steel packed for a small port. You build Little Bay; we fabricate the steel.
- You, the Montserratian contractorWin the job, clear the cargo, erect the steel and run the site.
- World SteelDesign, drawings, fabrication, coating, inspection, packing and shipping.
- Your engineer of recordSets the loads, approves the drawings and seals them as local rules require.
- Start todayContact page for Montserrat
Questions from Montserratian contractors
Buying steel for Montserrat: the questions we hear
Where on Montserrat can you deliver steel?
To Little Bay, the island’s port in the north. We supply projects in the safe northern zone only; nothing is proposed for the exclusion zone in the south.
Do you design for volcanic and seismic loads?
We design for the seismic, wind and roof loads your engineer of record sets for the site, including ash where they call for it.
What does World Steel supply for a project in Montserrat?
The steel structure: design or a design check to the Montserrat building code with the loads your engineer of record sets, shop and erection drawings, fabricated and coated steel and bolts. Complete building packages add roof and wall cladding, doors and accessories, and overhead cranes can come with the building on request. The contractor, our customer, erects it.
How are price and delivery agreed for Montserrat?
Every quote is written for its project; we do not publish prices. You choose FOB Vietnam or CIF to Little Bay. The voyage from the Vietnamese port to the Caribbean takes about 45 days, and the production slot is named in the quote.
How we work in Montserrat. World Steel designs and fabricates to the Montserrat building code and the standards it references, in our own plant in Vietnam. We hold no Montserratian approval, licence or registration and have no office or crew in Montserrat. The contractor, our customer, erects the steel and runs the site; the engineer or architect of record approves the drawings and seals and files them as local rules require.
More for Montserrat
Contact World Steel · Montserrat
Talk to us about steel for Montserrat
WhatsApp, email or a video call with our engineers, booked at an hour that suits Brades. Our contact page for Montserrat has the ports, the local time and the form.