Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Guyana · Solutions and products

Steel solutions and products for Guyana

Guyana is one of the fastest-growing economies in the world. Here is every steel product and solution we supply for it, from shore-base warehouses to river footbridges, made in our own plant and shipped to Georgetown.

Guyanese contractors already build with our steel: 18 footbridges, 6 warehouses, 2 workshops, an office building and a mosque.

Capacity for Guyana

Large Guyana projects need a large plant. Ours fabricates 2,500 t a month.

These are single jobs from our own plant in Vietnam, released area by area. Whatever Guyana is building, the steel comes from the same line.

For Guyanese contractors

Why Guyanese contractors work with World Steel

One supplier for the whole steel package, made in one accredited plant and shipped to Georgetown, with you in charge of the site.

  • Our own plant, 2,500 t a month

    One plant in Vietnam fabricates 2,500 metric tons of structural steel a month, so a large Guyana package gets a production slot, not a place in a queue.

  • IAS AC472 accredited

    The first and only fabricator in Vietnam accredited under IAS AC472, audited twice a year since 2019. Your inspector is welcome at every hold point.

  • One desk, one project manager

    Design, drawings, steel, coating, inspection, packing and shipping under one contract, with one English-speaking project manager for your Guyana job.

  • Live in PEB Studio

    Follow every member from cutting to the ship in real time, from your office in Georgetown, and book cranes and crews on facts.

  • Shop drawings included

    Tekla shop and erection drawings come with every project at no extra cost, ready for your engineer of record to approve.

  • FOB Vietnam or CIF Georgetown

    Two clear terms: take the steel at our port in Vietnam, or let us arrange sea freight and insurance through to Georgetown.

  • About 45 days at sea

    From the Vietnamese port to the Caribbean port takes about 45 days, with packing lists and shipping documents ready for your customs broker.

  • We never compete with you

    We supply the steel structure only. Guyanese contractors win and build the job; we back the bid with drawings, calculations and live tracking.

The whole shelf

Every product and solution, available for Guyana

Anything in our catalog can ship to Georgetown: structural steel and members, complete buildings, engineered solutions, and the coatings and quality records that go with them.

Structural steel and members

Frames, built-up members and multi-storey steel for buildings of any size.

Complete building packages

Whole buildings, frame to roof and wall cladding, packed as one shipment.

Solutions for island loads

Engineering groups written for hurricanes, earthquakes, salt air and remote sites.

Coating, quality and documents

What protects the steel and proves it: coatings, inspection, accreditation and sample files.

Designed for Guyana

Built for the wind, salt and ground of Guyana

We design to the Guyana National Building Code with the values your engineer of record sets, state them on sheet one and coat the steel for the exposure of your site.

Shipping to Guyana

From our plant to Georgetown, FOB or CIF

Members leave Vietnam piece-marked and bundled in erection order. The voyage from the Vietnamese port to Georgetown takes about 45 days; your contractor clears the cargo and takes it to site.

FOBVietnamYou or your forwarder book the ship from our port.
CIFGeorgetownWe book sea freight and insurance to your port.

An invitation to Guyanese contractors

You win the job and build it. We fabricate the steel.

You know the clay, the rain and the people in Georgetown and Linden. We bring a plant that fabricates 2,500 t a month and the drawings to match. Win the job, build it with your crew, and let us carry the steel from design to the wharf.

  • You, the Guyanese contractorWin the job, clear the cargo, erect the steel and run the site.
  • World SteelDesign, drawings, fabrication, coating, inspection, packing and shipping.
  • Your engineer of recordSets the loads, approves the drawings and seals them as local rules require.

Questions from Guyanese contractors

Buying steel for Guyana: the questions we hear

Have you supplied steel for Guyana before?

Yes. Guyanese contractors have built 18 pedestrian bridges, 6 warehouses, 2 maintenance workshops, an office building and a mosque with steel from our plant in Vietnam. We supplied the steel; the contractors erected it.

Can you design steel for the soft clay of the coast?

Yes. A light steel frame suits soft ground. Your geotechnical engineer sets the foundation design, and we design the frame and its base reactions to it, stated on the drawings for your engineer of record.

What does World Steel supply for a project in Guyana?

The steel structure: design or a design check to the Guyana National Building Code with the loads your engineer of record sets, shop and erection drawings, fabricated and coated steel and bolts. Complete building packages add roof and wall cladding, doors and accessories, and overhead cranes can come with the building on request. The contractor, our customer, erects it.

How are price and delivery agreed for Guyana?

Every quote is written for its project; we do not publish prices. You choose FOB Vietnam or CIF to Georgetown. The voyage from the Vietnamese port to the Caribbean takes about 45 days, and the production slot is named in the quote.

How we work in Guyana. World Steel designs and fabricates to the Guyana National Building Code and the standards it references, in our own plant in Vietnam. We hold no Guyanese approval, licence or registration and have no office or crew in Guyana. The contractor, our customer, erects the steel and runs the site; the engineer or architect of record approves the drawings and seals and files them as local rules require.

More for Guyana

Contact World Steel · Guyana

Talk to us about steel for Guyana

WhatsApp, email or a video call with our engineers, booked at an hour that suits Georgetown. Our contact page for Guyana has the ports, the local time and the form.