Capacity for Trinidad and Tobago
Large Trinidad and Tobago projects need a large plant. Ours fabricates 2,500 t a month.
These are single jobs from our own plant in Vietnam, released area by area. Whatever Trinidad and Tobago is building, the steel comes from the same line.
Already in the Caribbean
Steel from our plant stands in Guyana today:
- 18 pedestrian bridges
- 6 warehouses
- 2 maintenance workshops
- 1 office building
- 1 mosque
Matched to Trinidad and Tobago
What Trinidad and Tobago builds, and the steel we supply for it
Energy and petrochemical plants at Point Lisas and Point Fortin, port logistics, offices and towers in Port of Spain, and hotels on Tobago.
Oil, gas and petrochemical steel
Pipe racks, shore-base warehouses, process buildings and modules for oil and gas.
See the steel →Heavy industrial plants
Process buildings, conveyor galleries, pipe racks and maintenance shops for heavy industry.
See the steel →Crane-supporting structures
Crane runway girders and crane-bay columns, with overhead cranes supplied with the building on request.
See the steel →Warehouses and distribution
Clear-span distribution buildings with dock doors, mezzanines and racking loads, sized for the ports and estates of Trinidad and Tobago.
See the steel →Multi-storey hotels and offices
Multi-storey steel frames with composite deck for hotels, offices, apartments and hospitals.
See the steel →Energy and utility structures
Power plant buildings, substations and utility structures.
See the steel →Sports halls and arenas
Sports halls, stadium stands and covered courts under long-span roofs.
See the steel →Long-span structures
Long-span trusses and frames for terminals, arenas and hangars.
See the steel →
Shipping to Trinidad and Tobago
From our plant to Port of Spain, FOB or CIF
Members leave Vietnam piece-marked and bundled in erection order. The voyage from the Vietnamese port to Port of Spain takes about 45 days; your contractor clears the cargo and takes it to site.
Ports in Trinidad and Tobago
For Trinbagonian contractors
Why Trinbagonian contractors work with World Steel
One supplier for the whole steel package, made in one accredited plant and shipped to Port of Spain, with you in charge of the site.
Our own plant, 2,500 t a month
One plant in Vietnam fabricates 2,500 metric tons of structural steel a month, so a large Trinidad and Tobago package gets a production slot, not a place in a queue.
IAS AC472 accredited
The first and only fabricator in Vietnam accredited under IAS AC472, audited twice a year since 2019. Your inspector is welcome at every hold point.
One desk, one project manager
Design, drawings, steel, coating, inspection, packing and shipping under one contract, with one English-speaking project manager for your Trinidad and Tobago job.
Live in PEB Studio
Follow every member from cutting to the ship in real time, from your office in Port of Spain, and book cranes and crews on facts.
Shop drawings included
Tekla shop and erection drawings come with every project at no extra cost, ready for your engineer of record to approve.
FOB Vietnam or CIF Port of Spain
Two clear terms: take the steel at our port in Vietnam, or let us arrange sea freight and insurance through to Port of Spain.
About 45 days at sea
From the Vietnamese port to the Caribbean port takes about 45 days, with packing lists and shipping documents ready for your customs broker.
We never compete with you
We supply the steel structure only. Trinbagonian contractors win and build the job; we back the bid with drawings, calculations and live tracking.
Designed for Trinidad and Tobago
Built for the wind, salt and ground of Trinidad and Tobago
We design to the code basis set in Trinidad and Tobago with the values your engineer of record sets, state them on sheet one and coat the steel for the exposure of your site.
Hurricane wind
ModerateSalt air
Very highEarthquake
Very high
Caribbean hurricane and marine guides
The whole shelf
Every product and solution, available for Trinidad and Tobago
Anything in our catalog can ship to Port of Spain: structural steel and members, complete buildings, engineered solutions, and the coatings and quality records that go with them.
Structural steel and members
Frames, built-up members and multi-storey steel for buildings of any size.
Complete building packages
Whole buildings, frame to roof and wall cladding, packed as one shipment.
Solutions for island loads
Engineering groups written for hurricanes, earthquakes, salt air and remote sites.
Coating, quality and documents
What protects the steel and proves it: coatings, inspection, accreditation and sample files.
An invitation to Trinbagonian contractors
You win the job and build it. We fabricate the steel.
You have the energy sector’s safety culture and its standards. We have the plant and the paperwork to meet them: mill certificates by heat, an inspection plan agreed with you, and live tracking. You build; we fabricate.
- You, the Trinbagonian contractorWin the job, clear the cargo, erect the steel and run the site.
- World SteelDesign, drawings, fabrication, coating, inspection, packing and shipping.
- Your engineer of recordSets the loads, approves the drawings and seals them as local rules require.
- Start todayContact page for Trinidad and Tobago
Questions from Trinbagonian contractors
Buying steel for Trinidad and Tobago: the questions we hear
Can you supply steel for a Point Lisas energy plant?
Yes. Pipe racks, process buildings, platforms, crane bays and shelters, fabricated to the project specification, with EN 10204 3.1 mill certificates and an inspection and test plan agreed with your team.
Which port do you ship to for Tobago?
Scarborough for Tobago sites, or Port of Spain with the inter-island ferry for smaller loads. Your contractor plans the last leg; we pack for it.
What does World Steel supply for a project in Trinidad and Tobago?
The steel structure: design or a design check to the code basis set in Trinidad and Tobago with the loads your engineer of record sets, shop and erection drawings, fabricated and coated steel and bolts. Complete building packages add roof and wall cladding, doors and accessories, and overhead cranes can come with the building on request. The contractor, our customer, erects it.
How are price and delivery agreed for Trinidad and Tobago?
Every quote is written for its project; we do not publish prices. You choose FOB Vietnam or CIF to Port of Spain. The voyage from the Vietnamese port to the Caribbean takes about 45 days, and the production slot is named in the quote.
How we work in Trinidad and Tobago. World Steel designs and fabricates to the code basis set in Trinidad and Tobago and the standards it references, in our own plant in Vietnam. We hold no Trinbagonian approval, licence or registration and have no office or crew in Trinidad and Tobago. The contractor, our customer, erects the steel and runs the site; the engineer or architect of record approves the drawings and seals and files them as local rules require.
More for Trinidad and Tobago
Contact World Steel · Trinidad and Tobago
Talk to us about steel for Trinidad and Tobago
WhatsApp, email or a video call with our engineers, booked at an hour that suits Port of Spain. Our contact page for Trinidad and Tobago has the ports, the local time and the form.