-
Email
Drawings, questions and quote requests from Grenada, read by our sales and engineering team.
dang.victor@worldsteelgroup.com -
Phone & WhatsApp
International calls reach our head office in Vietnam. Ask for a call at an hour that suits St George’s.
+84 902 881 833 WhatsApp +84 902 881 833 -
Video call
Walk through your Grenada drawings with an engineer on Zoom or Microsoft Teams, or watch an inspection live at the plant.
Ask for a call -
Grenadian contractors
You win the job and build it; we design, detail and fabricate the steel and ship it to St George’s.
Contractor partnership
Send us a message from Grenada
Tell us about your Grenada project
A few lines are enough to start: the parish, or Carriacou or Petite Martinique, what you are building and a rough size. You get a reference number by email straight away, and a member of our team replies with questions or a written scope of supply.
Contractor partnership · Grenada
Grenadian contractors: you win the job, we fabricate the steel
Resorts on Grand Anse and the south coast, campus and public buildings, warehouses in St George, and the rebuilding of Carriacou and Petite Martinique after Hurricane Beryl are big steel packages. You win the job and run the site. We design, detail and fabricate the steel in our own plant, ship it to St George’s and back your bid with drawings and live tracking.
- Resorts on Grand Anse and the south coast
- Campus, schools and public buildings
- Rebuilding on Carriacou and Petite Martinique
- Shop and erection drawings included
Who reads your message
The team that answers Grenada
The same sales team answers contractors, owners and engineers in Grenada. Write through the form above or on WhatsApp and the right person picks up your message.
One team, two shores
Your site in Grenada, our plant in Vietnam
You talk to World Steel by WhatsApp, email or video. Your steel is engineered, fabricated, inspected and packed by the same company in Vietnam, shipped to St George’s, and you follow every step in real time in PEB Studio.
-
Grenada
Your project
Shipped to St George’s
The contractor, our customer, erects the steel; the Grenadian engineer of record approves the drawings and files them. We have no office or crew in Grenada.
Structural steel for Grenada -
Vietnam
Head office & engineering
55 Le Thuc Hoach Street, Phu Tho Hoa Ward, Ho Chi Minh City, Vietnam
Design to the Grenada Building Code in SAP2000 and Tekla Structures, project management and PEB Studio. Our US office in Westminster, California, handles coordination.
+84 902 881 833 -
Vietnam
Plant, IAS AC472 accredited
Lot Q9-10-15-16, Street No. 7, Hai Son Industrial Park (Phase 3+4), Duc Hoa, Tay Ninh Province (formerly Long An), Vietnam
Fabrication, QC, painting and export packing for Grenada. Visits and witnessed inspections by arrangement.
Tour the plant
Getting here
Flying in from Grenada?
Two short drives take you from the runway to the shop floor. Step-by-step directions with photos of each stop.
- Tan Son Nhat Airport (SGN) Head officeDirections
- Head office Plant, Hai Son Industrial ParkDirections
Before you write
Read up on steel for Grenada
Six guides and a page for every parish, written for Grenada: the code basis, the loads, the coatings and the road from St George’s.
Grenada Q&A
Questions contractors in Grenada ask first
Can you supply a job on Carriacou?
Yes. The steel lands at St George’s and the contractor takes it on by inter-island boat. We keep bundles within what the boat and the site equipment can lift.
Can you supply a campus or school building?
Yes. Classroom blocks, halls and sports buildings are frames we design and fabricate often. Send the architect’s drawings and we propose the steel.
Does World Steel have an office in Grenada?
No. We answer Grenada projects from our head office and plant in Vietnam and our US office in Westminster, California, by WhatsApp, email and video call. We work through contractors in Grenada: they win the job and build it, we design, detail and fabricate the steel and ship it to St George’s.
Who erects the steel and who files the permit in Grenada?
The contractor, our customer, erects the steel and runs the site. The Grenadian engineer or architect of record approves the drawings and files them for the permit. We design to the Grenada Building Code with the loads they set and give them calculations, shop drawings and erection drawings to work from.
What should I send with my first message?
Tell us the parish, or Carriacou or Petite Martinique, what the building is for and a rough size in meters or feet, and attach any drawings you have. Files up to 50 MB each can go with the form. We do not publish prices: every quote is written for its project, with the scope of supply and the price FOB Vietnam or CIF to St George’s.
Working in another country? Contact pages for all 26 Caribbean countries.
Made in Vietnam. Shipped to St George’s.
Send the drawings or the parish, size and use. We set the design basis with your engineer of record, design or detail the steel to the Grenada Building Code, and quote it made in our plant in Vietnam, packed in erection order and shipped to St George’s.