-
Email
Drawings, questions and quote requests from Anguilla, read by our sales and engineering team.
dang.victor@worldsteelgroup.com -
Phone & WhatsApp
International calls reach our head office in Vietnam. Ask for a call at an hour that suits The Valley.
+84 902 881 833 WhatsApp +84 902 881 833 -
Video call
Walk through your Anguilla drawings with an engineer on Zoom or Microsoft Teams, or watch an inspection live at the plant.
Ask for a call -
Anguillian contractors
You win the job and build it; we design, detail and fabricate the steel and ship it to Road Bay.
Contractor partnership
Send us a message from Anguilla
Tell us about your Anguilla project
A few lines are enough to start: the district and how close the site is to the sea, what you are building and a rough size. You get a reference number by email straight away, and a member of our team replies with questions or a written scope of supply.
Contractor partnership · Anguilla
Anguillian contractors: you win the job, we fabricate the steel
Resorts and villas on Meads Bay, Rendezvous Bay and Shoal Bay, the airport, schools, clinics, government buildings in The Valley and warehouses near Road Bay are big steel packages for a small island. You win the job and run the site. We design, detail and fabricate the steel in our own plant, ship it to Road Bay and back your bid with drawings and live tracking.
- Resorts and villas
- Schools, clinics and government buildings
- Warehouses near Road Bay
- Shop and erection drawings included
Who reads your message
The team that answers Anguilla
The same sales team answers contractors, owners and engineers in Anguilla. Write through the form above or on WhatsApp and the right person picks up your message.
One team, two shores
Your site in Anguilla, our plant in Vietnam
You talk to World Steel by WhatsApp, email or video. Your steel is engineered, fabricated, inspected and packed by the same company in Vietnam, shipped to Road Bay, and you follow every step in real time in PEB Studio.
-
Anguilla
Your project
Shipped to Road Bay
The contractor, our customer, erects the steel; the Anguillian engineer of record approves the drawings and files them. We have no office or crew in Anguilla.
Structural steel for Anguilla -
Vietnam
Head office & engineering
55 Le Thuc Hoach Street, Phu Tho Hoa Ward, Ho Chi Minh City, Vietnam
Design to the code basis agreed for Anguilla in SAP2000 and Tekla Structures, project management and PEB Studio. Our US office in Westminster, California, handles coordination.
+84 902 881 833 -
Vietnam
Plant, IAS AC472 accredited
Lot Q9-10-15-16, Street No. 7, Hai Son Industrial Park (Phase 3+4), Duc Hoa, Tay Ninh Province (formerly Long An), Vietnam
Fabrication, QC, painting and export packing for Anguilla. Visits and witnessed inspections by arrangement.
Tour the plant
Getting here
Flying in from Anguilla?
Two short drives take you from the runway to the shop floor. Step-by-step directions with photos of each stop.
- Tan Son Nhat Airport (SGN) Head officeDirections
- Head office Plant, Hai Son Industrial ParkDirections
Before you write
Read up on steel for Anguilla
Six guides and a page for every district, written for Anguilla: the code basis, the loads, the coatings and the road from Road Bay.
Anguilla Q&A
Questions contractors in Anguilla ask first
Road Bay or Blowing Point?
Cargo for Anguilla lands at Road Bay in Sandy Ground. Blowing Point is the ferry port. Tell us the district and we plan the bundles for the road from Road Bay.
Can you supply a resort in phases?
Yes. We release steel building by building, in the order your contractor erects it, and you follow each release in PEB Studio.
Does World Steel have an office in Anguilla?
No. We answer Anguilla projects from our head office and plant in Vietnam and our US office in Westminster, California, by WhatsApp, email and video call. We work through contractors in Anguilla: they win the job and build it, we design, detail and fabricate the steel and ship it to Road Bay.
Who erects the steel and who files the permit in Anguilla?
The contractor, our customer, erects the steel and runs the site. The Anguillian engineer or architect of record approves the drawings and files them for the permit. We design to the code basis agreed for Anguilla with the loads they set and give them calculations, shop drawings and erection drawings to work from.
What should I send with my first message?
Tell us the district and how close the site is to the sea, what the building is for and a rough size in meters or feet, and attach any drawings you have. Files up to 50 MB each can go with the form. We do not publish prices: every quote is written for its project, with the scope of supply and the price FOB Vietnam or CIF to Road Bay.
Working in another country? Contact pages for all 26 Caribbean countries.
Made in Vietnam. Shipped to Road Bay.
Send the drawings or the district, size and use. We set the design basis with your engineer of record, design or detail the steel to the code basis agreed for Anguilla, and quote it made in our plant in Vietnam, packed in erection order and shipped to Road Bay.