Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Curaçao · Contact World Steel

Contact World Steel about structural steel for Curaçao

Harbour industry around the Schottegat, hotels and public buildings in Willemstad and Bandabou: talk to the team that designs and fabricates the steel in our own plant in Vietnam and ships it to the Port of Willemstad.

Willemstad, Curaçao

Plant & engineering, Vietnam

Vietnam is 11 hours ahead of Willemstad. Tell us when you are free and we book calls inside your working day.

Steel shipped to

Curaçao

Simulate the voyage from our plant to Willemstad All solutions and products for Curaçao

2,500 t of structural steel a month from our own IAS AC472 plant in Vietnam

  • Email

    Drawings, questions and quote requests from Curaçao, read by our sales and engineering team.

    dang.victor@worldsteelgroup.com
  • Phone & WhatsApp

    International calls reach our head office in Vietnam. Ask for a call at an hour that suits Willemstad.

    +84 902 881 833 WhatsApp +84 902 881 833
  • Video call

    Walk through your Curaçao drawings with an engineer on Zoom or Microsoft Teams, or watch an inspection live at the plant.

    Ask for a call
  • Curaçaoan contractors

    You win the job and build it; we design, detail and fabricate the steel and ship it to Willemstad.

    Contractor partnership

Send us a message from Curaçao

Tell us about your Curaçao project

A few lines are enough to start: the area and the nearest neighbourhood, what you are building and a rough size. You get a reference number by email straight away, and a member of our team replies with questions or a written scope of supply.

Contractor partnership · Curaçao

Curaçaoan contractors: you win the job, we fabricate the steel

Hotels and resorts on the south coast, the hospital, schools and offices in Willemstad, harbour and drydock works on the Schottegat, warehouses near the airport and energy and water buildings are large steel packages for an island. You win the job and run the site. We design, detail and fabricate the steel in our own plant, ship it to Willemstad and back your bid with drawings and live tracking.

  • Hotels and resorts
  • Harbour and industrial works
  • Offices, schools and public buildings
  • Shop and erection drawings included

Who reads your message

The team that answers Curaçao

The same sales team answers contractors, owners and engineers in Curaçao. Write through the form above or on WhatsApp and the right person picks up your message.

Meet the full team

One team, two shores

Your site in Curaçao, our plant in Vietnam

You talk to World Steel by WhatsApp, email or video. Your steel is engineered, fabricated, inspected and packed by the same company in Vietnam, shipped to Willemstad, and you follow every step in real time in PEB Studio.

  • Curaçao

    Your project

    Shipped to Willemstad

    The contractor, our customer, erects the steel; the Curaçaoan engineer of record approves the drawings and files them. We have no office or crew in Curaçao.

    Structural steel for Curaçao
  • Vietnam

    Head office & engineering

    55 Le Thuc Hoach Street, Phu Tho Hoa Ward, Ho Chi Minh City, Vietnam

    Design to the code basis agreed for Curaçao in SAP2000 and Tekla Structures, project management and PEB Studio. Our US office in Westminster, California, handles coordination.

    +84 902 881 833
  • Vietnam

    Plant, IAS AC472 accredited

    Lot Q9-10-15-16, Street No. 7, Hai Son Industrial Park (Phase 3+4), Duc Hoa, Tay Ninh Province (formerly Long An), Vietnam

    Fabrication, QC, painting and export packing for Curaçao. Visits and witnessed inspections by arrangement.

    Tour the plant

Getting here

Flying in from Curaçao?

Two short drives take you from the runway to the shop floor. Step-by-step directions with photos of each stop.

Book a plant visit

Curaçao Q&A

Questions contractors in Curaçao ask first

Can you supply harbour and industrial buildings?

Yes. Warehouses, workshops, pipe racks and crane bays are frames we design and fabricate in our own plant, coated for the harbour exposure.

Can I send drawings with notes in Dutch or Papiamentu?

Yes, send them as they are. Tell us which sheets carry the key requirements and our engineers come back with their questions in English.

Does World Steel have an office in Curaçao?

No. We answer Curaçao projects from our head office and plant in Vietnam and our US office in Westminster, California, by WhatsApp, email and video call. We work through contractors in Curaçao: they win the job and build it, we design, detail and fabricate the steel and ship it to Willemstad.

Who erects the steel and who files the permit in Curaçao?

The contractor, our customer, erects the steel and runs the site. The Curaçaoan engineer or architect of record approves the drawings and files them for the permit. We design to the code basis agreed for Curaçao with the loads they set and give them calculations, shop drawings and erection drawings to work from.

What should I send with my first message?

Tell us the area and the nearest neighbourhood, what the building is for and a rough size in meters or feet, and attach any drawings you have. Files up to 50 MB each can go with the form. We do not publish prices: every quote is written for its project, with the scope of supply and the price FOB Vietnam or CIF to Willemstad.

Working in another country? Contact pages for all 26 Caribbean countries.

Made in Vietnam. Shipped to Willemstad.

Send the drawings or the area, size and use. We set the design basis with your engineer of record, design or detail the steel to the code basis agreed for Curaçao, and quote it made in our plant in Vietnam, packed in erection order and shipped to Willemstad.