Which industrial estates in Guyana do you cover?
+
Eccles and Coldingen near Georgetown, the Houston and Vreed-en-Hoop shore bases on the Demerara River, the new zones at Enmore and Foulis and at Wales, Belvedere on the Corentyne and Lethem on the Brazil border. We supply steel to any other plot in Guyana too.
Do you lease plots or run any Guyana estate?
+
No. Plots are leased from the estate’s manager, such as the ministry responsible for industry or the shore base company. We design and fabricate the steel building for the plot you hold and ship it to Georgetown.
Which code will my estate building be designed to?
+
The code your engineer of record names, usually the Guyana National Building Code with international references such as the International Building Code and AISC 360. We state the basis, loads and materials on the first calculation sheet.
How long does shipping to Georgetown take?
+
About 45 days from the Vietnamese port to Georgetown on a typical sailing, confirmed at booking. Our plant is about two hours by road from the port. Most Demerara estates are then a short truck ride from the wharves.
On what terms do you supply steel to Guyana?
+
Two Incoterms: FOB at the Vietnamese port, where your own forwarder takes over, or CIF Georgetown, where we book the sailing and insure the cargo to the Georgetown port. Import duties, clearance and the truck to your estate are arranged on the Guyana side.
Who erects the building on the estate?
+
Your contractor. World Steel supplies the steel structure only. We send erection drawings, piece marks and bolt lists, and our engineers answer your crew’s questions while they erect.
Has World Steel shipped steel to Guyana before?
+
Yes: 18 pedestrian bridges, 6 warehouses, 2 large maintenance workshops, an office building and a mosque in Georgetown, all designed and fabricated in our plant in Vietnam.
How large a package can you take for one estate?
+
Our plant fabricates 2,500 metric tons of structural steel a month. Our largest jobs include Sunpro Steel at 5,000 t, CPV Food at 2,500 t and the Long Son petrochemical complex at 2,000 t.
Can my inspector check the steel before it ships?
+
Yes. Inspection items and rates are agreed in the inspection plan before cutting. Your inspector can visit the plant, join checks live online or review the records we upload for every piece.