Capacity for St Kitts and Nevis
Large St Kitts and Nevis projects need a large plant. Ours fabricates 2,500 t a month.
These are single jobs from our own plant in Vietnam, released area by area. Whatever St Kitts and Nevis is building, the steel comes from the same line.
Already in the Caribbean
Steel from our plant stands in Guyana today:
- 18 pedestrian bridges
- 6 warehouses
- 2 maintenance workshops
- 1 office building
- 1 mosque
Matched to St Kitts and Nevis
What St Kitts and Nevis builds, and the steel we supply for it
Resorts on Frigate Bay and Nevis, medical and university campuses, light industry and warehouses near Basseterre, and sports grounds.
Multi-storey hotels and offices
Multi-storey steel frames with composite deck for hotels, offices, apartments and hospitals.
See the steel →Schools and community halls
Schools, classrooms and community halls, designed to the loads your engineer of record sets.
See the steel →Plants with crane bays
Portal frames with crane bays for processing, packaging and manufacturing plants.
See the steel →Sports halls and arenas
Sports halls, stadium stands and covered courts under long-span roofs.
See the steel →Warehouses and distribution
Clear-span distribution buildings with dock doors, mezzanines and racking loads, sized for the ports and estates of St Kitts and Nevis.
See the steel →Solar and EV canopies
Solar carports and EV charging canopies built for St Kitts and Nevis sun and storms.
See the steel →Commercial buildings
Shops, showrooms, offices and mixed-use blocks on light, fast steel frames.
See the steel →Churches and assembly halls
Churches, mosques and assembly halls with wide interiors free of columns.
See the steel →
For Kittitian and Nevisian contractors
Why Kittitian and Nevisian contractors work with World Steel
One supplier for the whole steel package, made in one accredited plant and shipped to Basseterre, with you in charge of the site.
Our own plant, 2,500 t a month
One plant in Vietnam fabricates 2,500 metric tons of structural steel a month, so a large St Kitts and Nevis package gets a production slot, not a place in a queue.
IAS AC472 accredited
The first and only fabricator in Vietnam accredited under IAS AC472, audited twice a year since 2019. Your inspector is welcome at every hold point.
One desk, one project manager
Design, drawings, steel, coating, inspection, packing and shipping under one contract, with one English-speaking project manager for your St Kitts and Nevis job.
Live in PEB Studio
Follow every member from cutting to the ship in real time, from your office in Basseterre, and book cranes and crews on facts.
Shop drawings included
Tekla shop and erection drawings come with every project at no extra cost, ready for your engineer of record to approve.
FOB Vietnam or CIF Basseterre
Two clear terms: take the steel at our port in Vietnam, or let us arrange sea freight and insurance through to Basseterre.
About 45 days at sea
From the Vietnamese port to the Caribbean port takes about 45 days, with packing lists and shipping documents ready for your customs broker.
We never compete with you
We supply the steel structure only. Kittitian and Nevisian contractors win and build the job; we back the bid with drawings, calculations and live tracking.
Designed for St Kitts and Nevis
Built for the wind, salt and ground of St Kitts and Nevis
We design to the St Kitts and Nevis building code with the values your engineer of record sets, state them on sheet one and coat the steel for the exposure of your site.
Hurricane wind
Very highSalt air
Very highEarthquake
High
Caribbean hurricane and marine guides
The whole shelf
Every product and solution, available for St Kitts and Nevis
Anything in our catalog can ship to Basseterre: structural steel and members, complete buildings, engineered solutions, and the coatings and quality records that go with them.
Structural steel and members
Frames, built-up members and multi-storey steel for buildings of any size.
Complete building packages
Whole buildings, frame to roof and wall cladding, packed as one shipment.
Solutions for island loads
Engineering groups written for hurricanes, earthquakes, salt air and remote sites.
Coating, quality and documents
What protects the steel and proves it: coatings, inspection, accreditation and sample files.
Shipping to St Kitts and Nevis
From our plant to Basseterre, FOB or CIF
Members leave Vietnam piece-marked and bundled in erection order. The voyage from the Vietnamese port to Basseterre takes about 45 days; your contractor clears the cargo and takes it to site.
An invitation to Kittitian and Nevisian contractors
You win the job and build it. We fabricate the steel.
Two islands, one Federation, and contractors who know both. Let us carry the steel: designed with your engineer, made in one accredited plant and shipped to Basseterre, packed for Nevis where needed. You build; we fabricate.
- You, the Kittitian and Nevisian contractorWin the job, clear the cargo, erect the steel and run the site.
- World SteelDesign, drawings, fabrication, coating, inspection, packing and shipping.
- Your engineer of recordSets the loads, approves the drawings and seals them as local rules require.
- Start todayContact page for St Kitts and Nevis
Questions from Kittitian and Nevisian contractors
Buying steel for St Kitts and Nevis: the questions we hear
Can you supply steel for a project on Nevis?
Yes. We ship to Basseterre and pack bundles for the crossing to Charlestown, with lengths and weights your contractor can handle.
Do you supply campus buildings?
Yes. Classrooms, lecture halls, labs and residences on steel frames, designed to the loads your engineer of record sets.
What does World Steel supply for a project in St Kitts and Nevis?
The steel structure: design or a design check to the St Kitts and Nevis building code with the loads your engineer of record sets, shop and erection drawings, fabricated and coated steel and bolts. Complete building packages add roof and wall cladding, doors and accessories, and overhead cranes can come with the building on request. The contractor, our customer, erects it.
How are price and delivery agreed for St Kitts and Nevis?
Every quote is written for its project; we do not publish prices. You choose FOB Vietnam or CIF to Basseterre. The voyage from the Vietnamese port to the Caribbean takes about 45 days, and the production slot is named in the quote.
How we work in St Kitts and Nevis. World Steel designs and fabricates to the St Kitts and Nevis building code and the standards it references, in our own plant in Vietnam. We hold no Kittitian and Nevisian approval, licence or registration and have no office or crew in St Kitts and Nevis. The contractor, our customer, erects the steel and runs the site; the engineer or architect of record approves the drawings and seals and files them as local rules require.
More for St Kitts and Nevis
Contact World Steel · St Kitts and Nevis
Talk to us about steel for St Kitts and Nevis
WhatsApp, email or a video call with our engineers, booked at an hour that suits Basseterre. Our contact page for St Kitts and Nevis has the ports, the local time and the form.