-
Email
Drawings, questions and quote requests from Saint Lucia, read by our sales and engineering team.
dang.victor@worldsteelgroup.com -
Phone & WhatsApp
International calls reach our head office in Vietnam. Ask for a call at an hour that suits Castries.
+84 902 881 833 WhatsApp +84 902 881 833 -
Video call
Walk through your Saint Lucia drawings with an engineer on Zoom or Microsoft Teams, or watch an inspection live at the plant.
Ask for a call -
Saint Lucian contractors
You win the job and build it; we design, detail and fabricate the steel and ship it to Castries.
Contractor partnership
Send us a message from Saint Lucia
Tell us about your Saint Lucia project
A few lines are enough to start: the quarter and how steep the site is, what you are building and a rough size. You get a reference number by email straight away, and a member of our team replies with questions or a written scope of supply.
Contractor partnership · Saint Lucia
Saint Lucian contractors: you win the job, we fabricate the steel
Resorts from Rodney Bay to Soufrière, warehouses around Castries and Vieux Fort, offices, clinics and schools are big steel packages for an island this size. You win the job and run the site. We design, detail and fabricate the steel in our own plant, ship it to Castries or Vieux Fort and back your bid with drawings and live tracking.
- Resorts and villas on the west coast
- Logistics at Castries and Vieux Fort
- Schools and shelters in every quarter
- Shop and erection drawings included
Who reads your message
The team that answers Saint Lucia
The same sales team answers contractors, owners and engineers in Saint Lucia. Write through the form above or on WhatsApp and the right person picks up your message.
One team, two shores
Your site in Saint Lucia, our plant in Vietnam
You talk to World Steel by WhatsApp, email or video. Your steel is engineered, fabricated, inspected and packed by the same company in Vietnam, shipped to Castries, and you follow every step in real time in PEB Studio.
-
Saint Lucia
Your project
Shipped to Castries, Vieux Fort
The contractor, our customer, erects the steel; the Saint Lucian engineer of record approves the drawings and files them. We have no office or crew in Saint Lucia.
Structural steel for Saint Lucia -
Vietnam
Head office & engineering
55 Le Thuc Hoach Street, Phu Tho Hoa Ward, Ho Chi Minh City, Vietnam
Design to the Saint Lucia Building Code in SAP2000 and Tekla Structures, project management and PEB Studio. Our US office in Westminster, California, handles coordination.
+84 902 881 833 -
Vietnam
Plant, IAS AC472 accredited
Lot Q9-10-15-16, Street No. 7, Hai Son Industrial Park (Phase 3+4), Duc Hoa, Tay Ninh Province (formerly Long An), Vietnam
Fabrication, QC, painting and export packing for Saint Lucia. Visits and witnessed inspections by arrangement.
Tour the plant
Getting here
Flying in from Saint Lucia?
Two short drives take you from the runway to the shop floor. Step-by-step directions with photos of each stop.
- Tan Son Nhat Airport (SGN) Head officeDirections
- Head office Plant, Hai Son Industrial ParkDirections
Before you write
Read up on steel for Saint Lucia
Six guides and a page for every quarter, written for Saint Lucia: the code basis, the loads, the coatings and the road from Castries.
Structural steel for Saint Lucia→
- Building code and approvals→
- Hurricane steel design→
- Volcanic ground and earthquakes→
- Salt air, rain and coatings→
- Port delivery: Castries and Vieux Fort→
- Resorts and public projects→
- 9 quarters, one page each→
Saint Lucia Q&A
Questions contractors in Saint Lucia ask first
Castries or Vieux Fort?
Port Castries suits the north and the west coast, Port Vieux Fort the south. Tell us the quarter and we suggest the port and the bundle lengths that suit the roads from there.
Can you build on a steep hillside site?
The steel frame can be stepped to the slope. Send the survey and the geotechnical report and we design the frame with your engineer of record to suit the foundations they set.
Does World Steel have an office in Saint Lucia?
No. We answer Saint Lucia projects from our head office and plant in Vietnam and our US office in Westminster, California, by WhatsApp, email and video call. We work through contractors in Saint Lucia: they win the job and build it, we design, detail and fabricate the steel and ship it to Castries.
Who erects the steel and who files the permit in Saint Lucia?
The contractor, our customer, erects the steel and runs the site. The Saint Lucian engineer or architect of record approves the drawings and files them for the permit. We design to the Saint Lucia Building Code with the loads they set and give them calculations, shop drawings and erection drawings to work from.
What should I send with my first message?
Tell us the quarter and how steep the site is, what the building is for and a rough size in meters or feet, and attach any drawings you have. Files up to 50 MB each can go with the form. We do not publish prices: every quote is written for its project, with the scope of supply and the price FOB Vietnam or CIF to Castries.
Working in another country? Contact pages for all 26 Caribbean countries.
Made in Vietnam. Shipped to Castries.
Send the drawings or the quarter, size and use. We set the design basis with your engineer of record, design or detail the steel to the Saint Lucia Building Code, and quote it made in our plant in Vietnam, packed in erection order and shipped to Castries.