Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Caribbean industrial estates · Curaçao

Steel buildings for Curaçao’s economic zones and industrial parks

Curinde runs Curaçao’s harbour and airport economic zones and the Brievengat industrial park. Brievengat is full, so part of the Nieuwe Haven zone on Willemstad harbour is being opened as an industrial area, and the 25,000 m² Dokweg park there filled within a year. New tenants need workshops, warehouses and business units. We design them for your lot, fabricate them in our IAS AC472 accredited plant in Vietnam at 2,500 t a month and ship them FOB Vietnam or CIF Willemstad for the local contractor, our customer, to erect.

4zones and parks in this guide
25,000 m²Dokweg park, full in 2024
2,500 ta month from our own plant
FOB · CIFthe two terms we offer
Dokweg Harbour zone Airport zone Brievengat
Pins are approximate and placed by district.

Four Curinde sites, one fabricator

Choose your site. Nieuwe Haven has its own steel guide.

Facts come from Curaçao press and business reports, with the year. Space is let by Curinde; we supply the steel building for the lot you hold.

01

Nieuwe Haven, Willemstad harbour

Nieuwe Haven and Parke Industrial Dokweg

The Nieuwe Haven economic zone on Willemstad’s harbour, where a third is becoming an industrial area and the 25,000 m² Dokweg park filled within a year.

  • 25,000 m² · Dokweg park, fully let (2024)
  • ≈35 · businesses at Dokweg
  • 60+ · companies planned for Nieuwe Haven (2023)
02

Willemstad harbour

Harbour Free Economic Zone

Curinde’s harbour-side economic zone for export trade, being turned into a special economic zone under 2025 plans.

  • 75%+ · of turnover from exports
  • 2025 · SEZ plan announced
03

By Curaçao International Airport

Airport Free Economic Zone

Curinde’s economic zone by the airport, for export trade by air.

  • Curinde · zone manager
  • Air · export trade
04

Brievengat, east of Willemstad

Industrial Park Brievengat

Curinde’s industrial park east of the city, reported full in 2022 and 2023, which is why Nieuwe Haven is being opened up.

  • Full · public reports 2022–2023
  • Curinde · park manager

Sources: Curaçao Chronicle (2022, 2023, 2024, 2025), CFI.co (2021). Check lots and leases with Curinde.

Why Curaçaoan contractors trust the package

Standards you can submit, shipping you can plan, quality you can inspect

Standards you can submit

Every building is designed to the code basis your engineer of record names, with the basis on sheet one of the calculations for the building permit.

  • Curaçao permits and codes guide
  • AISC 360 and AWS D1.1 designed to
  • Mill certificates for every heat
  • Your engineer of record approves and seals

Shipping you can plan

About 45 days at sea from the Vietnamese port to Willemstad on a typical sailing, confirmed at booking. Our plant is about two hours by road from the port.

  • FOB Vietnamese port or CIF Willemstad
  • Packed in erection order
  • Bundle lists by building and area
  • Tracked live in PEB Studio

Quality you can inspect

Inspection items and rates are agreed with you before cutting, and your inspector can watch online or visit the plant.

  • Inspection and test plan agreed per job
  • AWS-qualified welders
  • Coating readings recorded
  • Materials tested at ILAC labs

From our plant to your estate gate

Five legs from Vietnam to a Curaçao zone

Sailing time is the typical figure from the Vietnamese port and is confirmed at booking. Steel is packed in erection order, so the first bundles off the truck are the first members your crew needs.

  1. Our plantFabricated, coated and packed in erection order
  2. Vietnamese portAbout two hours by road from the plant
  3. At seaAbout 45 days to Willemstad, typical sailing
  4. WillemstadCleared by your broker on CIF terms
  5. Zone gateBy road to Nieuwe Haven, the airport or Brievengat

From our plant

Where every Curaçao estate building is made

Real World Steel photos from our plant in Vietnam. None is shown as a site in Curaçao.

Every building is designed to the code basis your engineer of record names, made in an IAS AC472 accredited plant and checked to an inspection plan you agree.

Large-project capacity

Built for the biggest jobs on any Curaçao estate

Our own plant in Vietnam fabricates 2,500 t of structural steel a month. These are real World Steel jobs, plus the steel we have already shipped to the Caribbean, erected by the local contractor, our customer.

5,000 tSunpro Steel mill
2,500 tCPV Food plant
2,000 tLong Son oil and gas, 56,000+ m²
2,000 tM&D Warehouse, Thailand
20projects already shipped to Guyana

Questions

Questions on steel buildings for Curaçao’s zones

Which Curaçao sites do you supply?

Nieuwe Haven and the Dokweg park, the Harbour and Airport Free Economic Zones, Brievengat and any other lot you hold on the island. We supply the steel building; Curinde handles the lease.

On what terms do you ship to Curaçao?

FOB at the Vietnamese port, where your forwarder takes over, or CIF Willemstad, where we book and insure the sailing. Clearance is handled by your broker.

How long does steel take to reach Willemstad?

About 45 days at sea from the Vietnamese port on a typical sailing, confirmed at booking. Our plant is about two hours by road from the port.

Which code are the buildings designed to?

To the code basis your engineer of record names for Curaçao, commonly with AISC 360 and AWS D1.1. Your engineer approves and seals the design.

Do you design for wind and salt air?

Yes. Your engineer sets the wind basis; we design the frame and cladding fixings to it and pick coatings for the salty island air.

Do you erect the buildings?

No. World Steel designs and fabricates the steel. The local contractor, our customer, erects it.

How much steel can you fabricate for one zone job?

Our own plant fabricates 2,500 t of structural steel a month, and we have delivered single jobs of up to 5,000 t.

Building in a Curaçao zone?

Send the lot, the use and your engineer’s code basis. We design the steel, fabricate it in our plant and ship it CIF Willemstad.