Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Corrosion protection · Hot-dip galvanizing

Zinc on every face, edge and inside corner

Hot-dip galvanizing dips the fabricated steel in molten zinc, so the coating reaches places a spray gun never does: inside corners, the backs of plates, the inside of hollow sections. For coastal, agricultural and industrial sites, it is the first line of defense for the frame.

Full coverageInside and outFor harsh sitesCoastal, farm, industrialASTM A123Thickness measured

Inside the coating

Topcoat (duplex option)Paint over the zinc for color and extra life in C4 and C5
Zinc layerPure zinc outer layer that weathers to a protective patina
Zinc-iron alloy layersHard alloy layers bonded to the steel itself
Structural steelBlasted or pickled clean before dipping
IllustrationNot to scale. Thickness follows ASTM A123 for the steel thickness.

Match the site

How harsh is your site?

ISO 12944 corrosivity categories. Galvanizing earns its place from C3 upward, and duplex systems where the exposure is highest.

C4: Galvanize, or duplex on exposed faces.

Why it lasts

Protection that goes where paint cannot

  • Coverage paint cannot reachMolten zinc coats inside corners, plate backs and hollow sections.
  • Tough in transitThe alloy layers resist the knocks of an ocean voyage and erection.
  • Less maintenanceZinc protects scratched areas next to it, so small damage does not spread rust.
  • Measured, not assumedCoating thickness is recorded and goes into your submittals.

Before the kettle

Steel detailed and checked for dipping

  1. Vent and drain holesSet in the shop drawings so cleaning solutions and molten zinc flow into every hollow and drain out again.
  2. Hanging pointsLifting and hanging holes placed so long members can be dipped at an angle and drain cleanly.
  3. Bare steel onlyNo paint, glue, hard-to-clean chemicals or old galvanizing. Steel that arrives with them is reported back before dipping.
  4. Thin plate handled with carePlate 2 mm (about 5/64 in) and thinner is dipped quickly and air-cooled first so it does not distort.

Our galvanizing procedure

Ten stages from bare steel to measured zinc

Every galvanized order runs through World Steel's written hot-dip galvanizing procedure: ten stages, each with its own chemistry, temperature and time, and a quality gate before the steel moves on.

ASTM A123/A123MASTM A153ASTM A385ASTM A780ISO 1461AS/NZS 4680JIS H8641
  1. Receiving
    Check and hang

    Each lot is counted against the order and tagged. QC checks the vent, drain and hanging holes, then the steel is wired to the dipping beam.

    Long members:
    2,200 mm (7 ft 3 in) and up hung at 25 to 35°
    Spacing:
    At least 10 mm (3/8 in) between rows
    Grouping:
    Similar thickness and requirements on one beam
  2. Cleaning
    Degrease

    An alkaline bath lifts the oil and grease left from fabrication and storage, so the zinc does not flake or fail to bond.

    Solution:
    Hydronet Base, 10%
    Temperature:
    30 to 35 °C (86 to 95 °F)
    Check:
    Every 3 to 5 minutes until clean
  3. Cleaning
    Pickle

    Hydrochloric acid strips rust and mill scale down to bare steel. The steel is lifted and checked so it never sits long enough to pit.

    Solution:
    HCl, 8 to 14%
    Temperature:
    25 to 30 °C (77 to 86 °F)
    Check:
    Every 10 minutes, typically 30 to 120 minutes in all
  4. Quality gate
    Rinse

    Clean water washes off the acid and loose dirt. Anything still showing grease, dirt or rust goes back to the start.

    Water:
    pH 6.5 to 7
    Time:
    1 to 2 minutes
    Extra:
    Pressure spray into hollows where needed
  5. Preparation
    Flux

    A zinc ammonium chloride flux takes off the last oxide film, protects the bare steel from rusting again and helps the molten zinc wet the surface.

    Solution:
    ZnCl₂ + NH₄Cl, 20 to 25%, 16 to 20 °Bé
    Temperature:
    60 to 80 °C (140 to 176 °F)
    Time:
    3 to 6 minutes
  6. Preparation
    Dry

    The fluxed steel dries and warms before the kettle, so no moisture reaches the molten zinc and causes splashing.

    Temperature:
    37 to 65 °C (99 to 149 °F)
    Time:
    5 to 10 minutes
  7. Galvanizing
    Dip in molten zinc

    The crane lowers the beam slowly into the kettle until the zinc-iron alloy layers form, the dross is skimmed off, and the steel is lifted out slowly and shaken so excess zinc drains.

    Zinc:
    99.99% pure, imported from Australia and Korea
    Temperature:
    440 to 450 °C ±5 (824 to 842 °F ±9)
    Time:
    3 to 5 minutes, by steel thickness
  8. Finishing
    Cool and passivate

    A chromate quench cools the steel and passivates the fresh zinc against white rust. Steel that will be painted (duplex) is cooled in water or air instead.

    Passivation:
    Chromate, 1.2 to 1.8‰
    For paint:
    Water or air cooling, no passivation
  9. Quality gate
    Inspect and measure

    QC counts the lot, checks every piece visually and reads coating thickness with an Elcometer 456 magnetic-induction gauge. Steel that fails is stripped in the acid and dipped again.

    Visual:
    No bare spots, burns, drips, inclusions or white rust
    Thickness:
    To ASTM A123, recorded per lot
  10. Release
    Clean, tag and release

    Hanging wires are cut, zinc drips are filed or ground smooth and touched up, and each bundle is tagged before final QC releases it.

    Tag:
    Customer, product, quantity, item code, date
    Release:
    Final QC check before dispatch

Quality gate: steel that fails goes back a stage before it can move on.

Bath control

Every tank kept in spec

  • Molten zincSampled once a month and analyzed by TÜV Rheinland (acid digestion, ICP-OES and ICP-MS). Every zinc shipment arrives with its own composition analysis. Temperature watched continuously, zinc level kept about 100 mm (4 in) below the rim.
  • Flux and passivation tanksAnalyzed every week by QUATEST 3, the Vietnamese government quality testing center.
  • Acid tanksComponent analysis every day, density checked with a Baumé hydrometer every three days.
  • Degreasing tankChecked every three days and topped up when the strength drops below 10%.

Records

Paperwork that follows the steel

  • Process tracking sheetTravels with every dipping beam and logs the time in each tank, the hanging QC sign-off, and the pieces accepted or rejected after cleaning and after galvanizing.
  • Thickness inspection sheetElcometer readings per lot, ready for your submittal package.
  • Nonconformance reportEvery defect, minor or major, logged daily and held aside until it is dispositioned.

Repair or redip

Clear limits, no guesswork

  • Touched upSmall bare or damaged spots: no more than 0.5% of the surface and 250 cm² (about 39 in²) in total, and no single spot over 40 cm² (about 6 in²). Repaired with zinc-rich coating to ASTM A780.
  • Stripped and redippedAnything beyond those limits, or outside ASTM A123, goes back through the acid and the kettle.

Galvanized steel, straight from the kettle

Welded frames, tower ladder cages and tubes after dipping: one continuous zinc coat, inside and out, ready to inspect and pack.

Hot-dip galvanized welded steel frames laid on trestles in a fabrication shopPhoto
Galvanized welded frames back from the kettle, laid out on trestles in the shop, Vietnam.
Galvanized steel frames with punched bolt plates at the corners on shop trestlesPhoto
Galvanized frames with their bolt holes open and clean after dipping, Vietnam.
Looking through the mesh of a galvanized tower ladder cage at its internal bracingPhoto
Mesh, rings and inner bracing of a galvanized ladder cage, all dipped as one piece.
Galvanized ladder cage section with mesh rings and rebar rungs under blue skyPhoto
Galvanized ladder cage section for a 50 m (164 ft) tower job, Vietnam.
Long galvanized ladder cage lying in a yard with its rungs and side railsPhoto
Full-length galvanized ladder cage with side rails and rungs, ready to pack.
Galvanized tower tubes with plastic-wrapped flanges stacked in an open yardPhoto
Galvanized tower tubes with their flanges wrapped to protect the zinc in transit.

Specification

Hot-Dip Galvanizing, line by line

Standard
ASTM A123 for structural members, ASTM A153 for bolts and hardware
Preparation
Cleaned and pickled before dipping; venting and drain holes detailed in the shop drawings
Coating thickness
To the A123 table for the steel thickness, measured and recorded
Duplex
Paint over galvanizing for color or the most aggressive exposures
Fasteners
Galvanized bolts and nuts so the joint matches the members
Field touch-up
Zinc-rich repair to ASTM A780 by your erector after erection
Long hot-dip galvanized ladder cages lying in a yardPhoto
Hot-dip galvanized ladder cages for a 50 m (164 ft) tower job, Vietnam.
Galvanized poles and channels with wrapped flanges stacked in a yardPhoto
Galvanized tower members with their flanges wrapped for shipping, Vietnam.

Questions

Galvanizing questions US buyers ask

When should we galvanize instead of paint?

When the site is coastal, agricultural, industrial or exposed to de-icing salt, roughly ISO 12944 C3 and above, or when the owner wants the least maintenance. In heated, dry interiors a shop paint system is usually enough.

Who does the galvanizing?

World Steel arranges it in Vietnam with a galvanizer named for your job, and the coating records go into your submittals with the rest of the steel.

What is a duplex system?

Paint applied over galvanizing. It adds color and extends protection in the most aggressive exposures, and the two layers protect each other.

What zinc goes into the kettle?

Zinc of 99.99% purity imported from Australia and Korea, each shipment with its composition analysis. The molten bath is sampled every month and analyzed by TÜV Rheinland.

How is coating thickness checked?

QC reads every lot with an Elcometer 456 magnetic-induction gauge against the ASTM A123 table for the steel thickness, and the readings go on a thickness inspection sheet you can put in your submittals.

What happens to a piece that fails inspection?

Small bare spots inside the repair limits are touched up with zinc-rich coating to ASTM A780. Anything larger is stripped in the acid and dipped again.

What do you need from our drawings for galvanizing?

Nothing extra: our detailers add the vent, drain and hanging holes to the shop drawings following ASTM A385 practice, and you see them when you approve the drawings.

How are scratches repaired on site?

Your erector touches up damaged areas and field bolt areas with a zinc-rich repair to ASTM A780. We list the repair product in the submittals.

More corrosion protection: Zinc-Rich Primer · Epoxy Coatings · Polyurethane Coatings · Duplex Systems · Corrosion-Resistant Fasteners · Protective Connection Detailing · Coating Inspection · Maintenance Planning

Painting over the zinc? Galvanized steel is sweep blasted to SSPC-SP 16 before a duplex system, and checked under AMPP coating inspection practice.

Next step

Price it, or build with us for the long run

Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.

Request a quote for Hot-Dip Galvanizing

Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.

Become our partner in the US

Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.

Drawn illustration of corrosion protection, standing in for a photo of this product Illustration

Catalog record Verified

Sized by our engineers for your loads and code, then listed line by line in your quote.