Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Dominican Republic · Solutions and products

Steel solutions and products for the Dominican Republic

Free-zone plants, logistics around Caucedo and Haina, hotels in Punta Cana and power plants: here is every steel product and solution we supply for the Dominican Republic.

Dominican contractors and developers, the largest market in the Caribbean deserves a full range. Here it is.

Capacity for the Dominican Republic

Large Dominican Republic projects need a large plant. Ours fabricates 2,500 t a month.

These are single jobs from our own plant in Vietnam, released area by area. Whatever the Dominican Republic is building, the steel comes from the same line.

Shipping to the Dominican Republic

From our plant to Caucedo, FOB or CIF

Members leave Vietnam piece-marked and bundled in erection order. The voyage from the Vietnamese port to Caucedo takes about 45 days; your contractor clears the cargo and takes it to site.

FOBVietnamYou or your forwarder book the ship from our port.
CIFCaucedoWe book sea freight and insurance to your port.

For Dominican contractors

Why Dominican contractors work with World Steel

One supplier for the whole steel package, made in one accredited plant and shipped to Caucedo, with you in charge of the site.

  • Our own plant, 2,500 t a month

    One plant in Vietnam fabricates 2,500 metric tons of structural steel a month, so a large Dominican Republic package gets a production slot, not a place in a queue.

  • IAS AC472 accredited

    The first and only fabricator in Vietnam accredited under IAS AC472, audited twice a year since 2019. Your inspector is welcome at every hold point.

  • One desk, one project manager

    Design, drawings, steel, coating, inspection, packing and shipping under one contract, with one English-speaking project manager for your Dominican Republic job.

  • Live in PEB Studio

    Follow every member from cutting to the ship in real time, from your office in Santo Domingo, and book cranes and crews on facts.

  • Shop drawings included

    Tekla shop and erection drawings come with every project at no extra cost, ready for your engineer of record to approve.

  • FOB Vietnam or CIF Caucedo

    Two clear terms: take the steel at our port in Vietnam, or let us arrange sea freight and insurance through to Caucedo.

  • About 45 days at sea

    From the Vietnamese port to the Caribbean port takes about 45 days, with packing lists and shipping documents ready for your customs broker.

  • We never compete with you

    We supply the steel structure only. Dominican contractors win and build the job; we back the bid with drawings, calculations and live tracking.

Designed for the Dominican Republic

Built for the wind, salt and ground of the Dominican Republic

We design to the Dominican building regulations with the values your engineer of record sets, state them on sheet one and coat the steel for the exposure of your site.

The whole shelf

Every product and solution, available for the Dominican Republic

Anything in our catalog can ship to Caucedo: structural steel and members, complete buildings, engineered solutions, and the coatings and quality records that go with them.

Structural steel and members

Frames, built-up members and multi-storey steel for buildings of any size.

Complete building packages

Whole buildings, frame to roof and wall cladding, packed as one shipment.

Solutions for island loads

Engineering groups written for hurricanes, earthquakes, salt air and remote sites.

Coating, quality and documents

What protects the steel and proves it: coatings, inspection, accreditation and sample files.

An invitation to Dominican contractors

You win the job and build it. We fabricate the steel.

Large Dominican projects need a large plant. Ours fabricates 2,500 t a month and releases big packages area by area. You win the free-zone plant or the resort and build it; we design, detail and fabricate the steel.

  • You, the Dominican contractorWin the job, clear the cargo, erect the steel and run the site.
  • World SteelDesign, drawings, fabrication, coating, inspection, packing and shipping.
  • Your engineer of recordSets the loads, approves the drawings and seals them as local rules require.

Questions from Dominican contractors

Buying steel for the Dominican Republic: the questions we hear

Which port should steel for the Dominican Republic go to?

Caucedo or Río Haina for Santo Domingo and the south, Puerto Plata for the north coast. CIF terms name the port you choose.

Do you work in Spanish?

Our team works in English. Drawings and documents are in English with metric units first, and your team can bring a Spanish-speaking colleague to any call.

What does World Steel supply for a project in the Dominican Republic?

The steel structure: design or a design check to the Dominican building regulations with the loads your engineer of record sets, shop and erection drawings, fabricated and coated steel and bolts. Complete building packages add roof and wall cladding, doors and accessories, and overhead cranes can come with the building on request. The contractor, our customer, erects it.

How are price and delivery agreed for the Dominican Republic?

Every quote is written for its project; we do not publish prices. You choose FOB Vietnam or CIF to Caucedo. The voyage from the Vietnamese port to the Caribbean takes about 45 days, and the production slot is named in the quote.

How we work in the Dominican Republic. World Steel designs and fabricates to the Dominican building regulations and the standards it references, in our own plant in Vietnam. We hold no Dominican approval, licence or registration and have no office or crew in the Dominican Republic. The contractor, our customer, erects the steel and runs the site; the engineer or architect of record approves the drawings and seals and files them as local rules require.

More for the Dominican Republic

Contact World Steel · Dominican Republic

Talk to us about steel for the Dominican Republic

WhatsApp, email or a video call with our engineers, booked at an hour that suits Santo Domingo. Our contact page for the Dominican Republic has the ports, the local time and the form.