Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Guyana · Contact World Steel

Contact World Steel about structural steel for Guyana

Building on the coast, up the Demerara or out in the oil and gas supply base? Talk to the team that designs steel for soft clay and heavy rain, fabricates it in our own plant in Vietnam and ships it to Georgetown.

Georgetown, Guyana

Plant & engineering, Vietnam

Vietnam is 11 hours ahead of Georgetown. Tell us when you are free and we book calls inside your working day.

  • Email

    Drawings, questions and quote requests from Guyana, read by our sales and engineering team.

    dang.victor@worldsteelgroup.com
  • Phone & WhatsApp

    International calls reach our head office in Vietnam. Ask for a call at an hour that suits Georgetown.

    +84 902 881 833 WhatsApp +84 902 881 833
  • Video call

    Walk through your Guyana drawings with an engineer on Zoom or Microsoft Teams, or watch an inspection live at the plant.

    Ask for a call
  • Guyanese contractors

    You win the job and build it; we design, detail and fabricate the steel and ship it to Georgetown.

    Contractor partnership

Send us a message from Guyana

Tell us about your Guyana project

A few lines are enough to start: the region and the nearest town or river landing, what you are building and a rough size. You get a reference number by email straight away, and a member of our team replies with questions or a written scope of supply.

Contractor partnership · Guyana

Guyanese contractors: you build the boom, we fabricate the steel

Shore bases, warehouses, plants, hotels, bridges and public buildings are going up from Georgetown to Linden and Berbice. You win the job and run the site. We design, detail and fabricate the steel in our own plant, ship it to Georgetown and back your bid with drawings and live tracking, as we did for 18 footbridges in Guyana.

  • Shore bases and warehouses on the Demerara
  • Bridges and public works across the regions
  • Mining, rice and agro-processing plants
  • Shop and erection drawings included

Who reads your message

The team that answers Guyana

The same sales team answers contractors, owners and engineers in Guyana. Write through the form above or on WhatsApp and the right person picks up your message.

Meet the full team

One team, two shores

Your site in Guyana, our plant in Vietnam

You talk to World Steel by WhatsApp, email or video. Your steel is engineered, fabricated, inspected and packed by the same company in Vietnam, shipped to Georgetown, and you follow every step in real time in PEB Studio.

  • Guyana

    Your project

    Shipped to Georgetown

    The contractor, our customer, erects the steel; the Guyanese engineer of record approves the drawings and files them. We have no office or crew in Guyana.

    Structural steel for Guyana
  • Vietnam

    Head office & engineering

    55 Le Thuc Hoach Street, Phu Tho Hoa Ward, Ho Chi Minh City, Vietnam

    Design to the Guyana National Building Code in SAP2000 and Tekla Structures, project management and PEB Studio. Our US office in Westminster, California, handles coordination.

    +84 902 881 833
  • Vietnam

    Plant, IAS AC472 accredited

    Lot Q9-10-15-16, Street No. 7, Hai Son Industrial Park (Phase 3+4), Duc Hoa, Tay Ninh Province (formerly Long An), Vietnam

    Fabrication, QC, painting and export packing for Guyana. Visits and witnessed inspections by arrangement.

    Tour the plant

Getting here

Flying in from Guyana?

Two short drives take you from the runway to the shop floor. Step-by-step directions with photos of each stop.

Book a plant visit

Guyana Q&A

Questions contractors in Guyana ask first

Have you already supplied steel in Guyana?

Yes. Our shop fabricated the steel for 18 pedestrian bridges and a warehouse for Guyana, and our team fabricated the Guyana Mosque steel. Ask us for the photos and drawings we can share for a project like yours.

Can you ship past Georgetown to New Amsterdam or Linden?

Ocean freight lands at Georgetown. From there the contractor or a local haulier takes the bundles on by road or river barge. We pack and mark every bundle so it can be split for the last leg, and we size bundles to the barge or truck you plan to use.

Does World Steel have an office in Guyana?

No. We answer Guyana projects from our head office and plant in Vietnam and our US office in Westminster, California, by WhatsApp, email and video call. We work through contractors in Guyana: they win the job and build it, we design, detail and fabricate the steel and ship it to Georgetown.

Who erects the steel and who files the permit in Guyana?

The contractor, our customer, erects the steel and runs the site. The Guyanese engineer or architect of record approves the drawings and files them for the permit. We design to the Guyana National Building Code with the loads they set and give them calculations, shop drawings and erection drawings to work from.

What should I send with my first message?

Tell us the region and the nearest town or river landing, what the building is for and a rough size in meters or feet, and attach any drawings you have. Files up to 50 MB each can go with the form. We do not publish prices: every quote is written for its project, with the scope of supply and the price FOB Vietnam or CIF to Georgetown.

Working in another country? Contact pages for all 26 Caribbean countries.

Made in Vietnam. Shipped to Georgetown.

Send the drawings or the region, size and use. We set the design basis with your engineer of record, design or detail the steel to the Guyana National Building Code, and quote it made in our plant in Vietnam, packed in erection order and shipped to Georgetown.