Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Barbados · Contact World Steel

Contact World Steel about structural steel for Barbados

Hotels on the west coast, warehouses near Bridgetown or public buildings in the parishes: talk to the team that designs steel for Barbados salt air and hurricane wind, fabricates it in our own plant in Vietnam and ships it to Bridgetown Port.

Bridgetown, Barbados

Plant & engineering, Vietnam

Vietnam is 11 hours ahead of Bridgetown. Tell us when you are free and we book calls inside your working day.

  • Email

    Drawings, questions and quote requests from Barbados, read by our sales and engineering team.

    dang.victor@worldsteelgroup.com
  • Phone & WhatsApp

    International calls reach our head office in Vietnam. Ask for a call at an hour that suits Bridgetown.

    +84 902 881 833 WhatsApp +84 902 881 833
  • Video call

    Walk through your Barbados drawings with an engineer on Zoom or Microsoft Teams, or watch an inspection live at the plant.

    Ask for a call
  • Barbadian contractors

    You win the job and build it; we design, detail and fabricate the steel and ship it to Bridgetown.

    Contractor partnership

Send us a message from Barbados

Tell us about your Barbados project

A few lines are enough to start: the parish and how close the site is to the sea, what you are building and a rough size. You get a reference number by email straight away, and a member of our team replies with questions or a written scope of supply.

Contractor partnership · Barbados

Barbadian contractors: you win the job, we fabricate the steel

Hotels on the west and south coasts, warehouses near the port, malls at Warrens and plants in the industrial parks are big steel packages. You win the job and run the site. We design, detail and fabricate the steel in our own plant, ship it to Bridgetown Port and back your bid with drawings and live tracking.

  • Hotels and villas on the west and south coasts
  • Logistics near Bridgetown Port
  • Commercial buildings at Warrens and Wildey
  • Shop and erection drawings included

Who reads your message

The team that answers Barbados

The same sales team answers contractors, owners and engineers in Barbados. Write through the form above or on WhatsApp and the right person picks up your message.

Meet the full team

One team, two shores

Your site in Barbados, our plant in Vietnam

You talk to World Steel by WhatsApp, email or video. Your steel is engineered, fabricated, inspected and packed by the same company in Vietnam, shipped to Bridgetown, and you follow every step in real time in PEB Studio.

  • Barbados

    Your project

    Shipped to Bridgetown

    The contractor, our customer, erects the steel; the Barbadian engineer of record approves the drawings and files them. We have no office or crew in Barbados.

    Structural steel for Barbados
  • Vietnam

    Head office & engineering

    55 Le Thuc Hoach Street, Phu Tho Hoa Ward, Ho Chi Minh City, Vietnam

    Design to the Barbados National Building Code in SAP2000 and Tekla Structures, project management and PEB Studio. Our US office in Westminster, California, handles coordination.

    +84 902 881 833
  • Vietnam

    Plant, IAS AC472 accredited

    Lot Q9-10-15-16, Street No. 7, Hai Son Industrial Park (Phase 3+4), Duc Hoa, Tay Ninh Province (formerly Long An), Vietnam

    Fabrication, QC, painting and export packing for Barbados. Visits and witnessed inspections by arrangement.

    Tour the plant

Getting here

Flying in from Barbados?

Two short drives take you from the runway to the shop floor. Step-by-step directions with photos of each stop.

Book a plant visit

Barbados Q&A

Questions contractors in Barbados ask first

How do you protect steel near the Barbados coast?

We choose the coating system for the exposure at your site, from Jotun, PPG, Carboline, Hempel, Nippon or International Paint, and add hot-dip galvanizing where the specification asks for it. Paint from these brands is sold in the region for touch-up.

Can you work with my architect’s drawings for a hotel?

Yes. Send the architectural set. We propose the steel frame, coordinate it with your engineer of record and detail every member in Tekla, with shop and erection drawings included at no extra cost.

Does World Steel have an office in Barbados?

No. We answer Barbados projects from our head office and plant in Vietnam and our US office in Westminster, California, by WhatsApp, email and video call. We work through contractors in Barbados: they win the job and build it, we design, detail and fabricate the steel and ship it to Bridgetown.

Who erects the steel and who files the permit in Barbados?

The contractor, our customer, erects the steel and runs the site. The Barbadian engineer or architect of record approves the drawings and files them for the permit. We design to the Barbados National Building Code with the loads they set and give them calculations, shop drawings and erection drawings to work from.

What should I send with my first message?

Tell us the parish and how close the site is to the sea, what the building is for and a rough size in meters or feet, and attach any drawings you have. Files up to 50 MB each can go with the form. We do not publish prices: every quote is written for its project, with the scope of supply and the price FOB Vietnam or CIF to Bridgetown.

Working in another country? Contact pages for all 26 Caribbean countries.

Made in Vietnam. Shipped to Bridgetown.

Send the drawings or the parish, size and use. We set the design basis with your engineer of record, design or detail the steel to the Barbados National Building Code, and quote it made in our plant in Vietnam, packed in erection order and shipped to Bridgetown.