Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Montserrat · Contact World Steel

Contact World Steel about structural steel for Montserrat

Public buildings and new works in the north around Little Bay and Brades: talk to the team that designs steel for volcanic ash, earthquakes and hurricanes, fabricates it in our own plant in Vietnam and ships it to Port Little Bay.

Brades, Montserrat

Plant & engineering, Vietnam

Vietnam is 11 hours ahead of Brades. Tell us when you are free and we book calls inside your working day.

Steel shipped to

Montserrat

Simulate the voyage from our plant to Little Bay All solutions and products for Montserrat

2,500 t of structural steel a month from our own IAS AC472 plant in Vietnam

  • Email

    Drawings, questions and quote requests from Montserrat, read by our sales and engineering team.

    dang.victor@worldsteelgroup.com
  • Phone & WhatsApp

    International calls reach our head office in Vietnam. Ask for a call at an hour that suits Brades.

    +84 902 881 833 WhatsApp +84 902 881 833
  • Video call

    Walk through your Montserrat drawings with an engineer on Zoom or Microsoft Teams, or watch an inspection live at the plant.

    Ask for a call
  • Montserratian contractors

    You win the job and build it; we design, detail and fabricate the steel and ship it to Little Bay.

    Contractor partnership

Send us a message from Montserrat

Tell us about your Montserrat project

A few lines are enough to start: the parish and the nearest village in the north, what you are building and a rough size. You get a reference number by email straight away, and a member of our team replies with questions or a written scope of supply.

Contractor partnership · Montserrat

Montserratian contractors: you win the job, we fabricate the steel

The new town and port at Little Bay, government offices, the hospital, schools, housing, the airport and energy projects are big steel packages for a small island. You win the job and run the site. We design, detail and fabricate the steel in our own plant, ship it to Little Bay and back your bid with drawings and live tracking.

  • Little Bay town and port buildings
  • Hospital, schools and public buildings
  • Housing in the north
  • Shop and erection drawings included

Who reads your message

The team that answers Montserrat

The same sales team answers contractors, owners and engineers in Montserrat. Write through the form above or on WhatsApp and the right person picks up your message.

Meet the full team

One team, two shores

Your site in Montserrat, our plant in Vietnam

You talk to World Steel by WhatsApp, email or video. Your steel is engineered, fabricated, inspected and packed by the same company in Vietnam, shipped to Little Bay, and you follow every step in real time in PEB Studio.

  • Montserrat

    Your project

    Shipped to Little Bay

    The contractor, our customer, erects the steel; the Montserratian engineer of record approves the drawings and files them. We have no office or crew in Montserrat.

    Structural steel for Montserrat
  • Vietnam

    Head office & engineering

    55 Le Thuc Hoach Street, Phu Tho Hoa Ward, Ho Chi Minh City, Vietnam

    Design to the Montserrat building code in SAP2000 and Tekla Structures, project management and PEB Studio. Our US office in Westminster, California, handles coordination.

    +84 902 881 833
  • Vietnam

    Plant, IAS AC472 accredited

    Lot Q9-10-15-16, Street No. 7, Hai Son Industrial Park (Phase 3+4), Duc Hoa, Tay Ninh Province (formerly Long An), Vietnam

    Fabrication, QC, painting and export packing for Montserrat. Visits and witnessed inspections by arrangement.

    Tour the plant

Getting here

Flying in from Montserrat?

Two short drives take you from the runway to the shop floor. Step-by-step directions with photos of each stop.

Book a plant visit

Before you write

Read up on steel for Montserrat

Six guides and a page for every parish, written for Montserrat: the code basis, the loads, the coatings and the road from Little Bay.

Montserrat Q&A

Questions contractors in Montserrat ask first

Where can you supply steel on Montserrat?

For sites in the safe north of the island, around Little Bay, Brades and St Peter’s. We do not suggest building in the exclusion zone of St Anthony.

Can a roof be designed for ashfall?

Yes, when your engineer of record sets an ash load. We add it to the roof design with the wind and seismic values.

Does World Steel have an office in Montserrat?

No. We answer Montserrat projects from our head office and plant in Vietnam and our US office in Westminster, California, by WhatsApp, email and video call. We work through contractors in Montserrat: they win the job and build it, we design, detail and fabricate the steel and ship it to Little Bay.

Who erects the steel and who files the permit in Montserrat?

The contractor, our customer, erects the steel and runs the site. The Montserratian engineer or architect of record approves the drawings and files them for the permit. We design to the Montserrat building code with the loads they set and give them calculations, shop drawings and erection drawings to work from.

What should I send with my first message?

Tell us the parish and the nearest village in the north, what the building is for and a rough size in meters or feet, and attach any drawings you have. Files up to 50 MB each can go with the form. We do not publish prices: every quote is written for its project, with the scope of supply and the price FOB Vietnam or CIF to Little Bay.

Working in another country? Contact pages for all 26 Caribbean countries.

Made in Vietnam. Shipped to Little Bay.

Send the drawings or the parish, size and use. We set the design basis with your engineer of record, design or detail the steel to the Montserrat building code, and quote it made in our plant in Vietnam, packed in erection order and shipped to Little Bay.