-
Email
Drawings, questions and quote requests from the Cayman Islands, read by our sales and engineering team.
dang.victor@worldsteelgroup.com -
Phone & WhatsApp
International calls reach our head office in Vietnam. Ask for a call at an hour that suits George Town.
+84 902 881 833 WhatsApp +84 902 881 833 -
Video call
Walk through your Cayman Islands drawings with an engineer on Zoom or Microsoft Teams, or watch an inspection live at the plant.
Ask for a call -
Caymanian contractors
You win the job and build it; we design, detail and fabricate the steel and ship it to George Town.
Contractor partnership
Send us a message from the Cayman Islands
Tell us about your Cayman Islands project
A few lines are enough to start: the district and the island, what you are building and a rough size. You get a reference number by email straight away, and a member of our team replies with questions or a written scope of supply.
Contractor partnership · Cayman Islands
Caymanian contractors: you win the job, we fabricate the steel
Office buildings in George Town and Camana Bay, hotels and condominiums on Seven Mile Beach, the airport, schools, healthcare and warehouses are big steel packages. You win the job and run the site. We design, detail and fabricate the steel in our own plant, ship it to George Town and back your bid with drawings and live tracking.
- Offices and mixed-use buildings
- Hotels and condominiums
- Schools and healthcare
- Shop and erection drawings included
Who reads your message
The team that answers the Cayman Islands
The same sales team answers contractors, owners and engineers in the Cayman Islands. Write through the form above or on WhatsApp and the right person picks up your message.
One team, two shores
Your site in the Cayman Islands, our plant in Vietnam
You talk to World Steel by WhatsApp, email or video. Your steel is engineered, fabricated, inspected and packed by the same company in Vietnam, shipped to George Town, and you follow every step in real time in PEB Studio.
-
Cayman Islands
Your project
Shipped to George Town
The contractor, our customer, erects the steel; the Caymanian engineer of record approves the drawings and files them. We have no office or crew in the Cayman Islands.
Structural steel for the Cayman Islands -
Vietnam
Head office & engineering
55 Le Thuc Hoach Street, Phu Tho Hoa Ward, Ho Chi Minh City, Vietnam
Design to the Cayman Islands Building Code in SAP2000 and Tekla Structures, project management and PEB Studio. Our US office in Westminster, California, handles coordination.
+84 902 881 833 -
Vietnam
Plant, IAS AC472 accredited
Lot Q9-10-15-16, Street No. 7, Hai Son Industrial Park (Phase 3+4), Duc Hoa, Tay Ninh Province (formerly Long An), Vietnam
Fabrication, QC, painting and export packing for the Cayman Islands. Visits and witnessed inspections by arrangement.
Tour the plant
Getting here
Flying in from the Cayman Islands?
Two short drives take you from the runway to the shop floor. Step-by-step directions with photos of each stop.
- Tan Son Nhat Airport (SGN) Head officeDirections
- Head office Plant, Hai Son Industrial ParkDirections
Before you write
Read up on steel for the Cayman Islands
Six guides and a page for every district, written for the Cayman Islands: the code basis, the loads, the coatings and the road from George Town.
Cayman Islands Q&A
Questions contractors in the Cayman Islands ask first
Can you supply Cayman Brac or Little Cayman?
Yes. The steel lands at George Town and goes on by the inter-island cargo service the contractor books. We size bundles for it.
Can you supply a multi-storey office or hotel frame?
Yes. Steel frames with composite deck for offices, hotels and apartments are part of what our plant fabricates. Send the architectural set and we propose the frame.
Does World Steel have an office in the Cayman Islands?
No. We answer Cayman Islands projects from our head office and plant in Vietnam and our US office in Westminster, California, by WhatsApp, email and video call. We work through contractors in the Cayman Islands: they win the job and build it, we design, detail and fabricate the steel and ship it to George Town.
Who erects the steel and who files the permit in the Cayman Islands?
The contractor, our customer, erects the steel and runs the site. The Caymanian engineer or architect of record approves the drawings and files them for the permit. We design to the Cayman Islands Building Code with the loads they set and give them calculations, shop drawings and erection drawings to work from.
What should I send with my first message?
Tell us the district and the island, what the building is for and a rough size in meters or feet, and attach any drawings you have. Files up to 50 MB each can go with the form. We do not publish prices: every quote is written for its project, with the scope of supply and the price FOB Vietnam or CIF to George Town.
Working in another country? Contact pages for all 26 Caribbean countries.
Made in Vietnam. Shipped to George Town.
Send the drawings or the district, size and use. We set the design basis with your engineer of record, design or detail the steel to the Cayman Islands Building Code, and quote it made in our plant in Vietnam, packed in erection order and shipped to George Town.