Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Caribbean industrial estates · Puerto Rico

Steel buildings for Puerto Rico’s industrial parks and zones

Puerto Rico makes medicines, medical devices and aircraft parts for the world. The government’s industrial company PRIDCO runs more than 760 industrial lots, and San Juan’s industrial vacancy stood at 3.3% in late 2025, so new plants and warehouses mean new buildings. We design them to the code basis your engineer names, fabricate them in our IAS AC472 accredited plant in Vietnam at 2,500 t a month and ship them FOB Vietnam or CIF San Juan for the local contractor, our customer, to erect.

760+PRIDCO industrial lots
3.3%San Juan industrial vacancy (2H 2025)
2,500 ta month from our own plant
FOB · CIFthe two terms we offer
FTZ 7 Aguadilla Roosevelt Roads
Pins are approximate and placed by district.

Three industrial sites, one fabricator

Choose your site. Each one has its own steel guide.

Site facts come from public agencies and press reports, with the year. Land and buildings are leased or bought from each site’s owner; we supply the steel building for the lot you hold.

01

Island-wide, grantee PRIDCO

Foreign-Trade Zone 7 and PRIDCO parks

Puerto Rico’s oldest foreign-trade zone, run by PRIDCO since 1960, with sites across the island and pharmaceutical subzones.

  • 1960 · zone approved
  • 263.6 acres · activated, US ITA
  • 760+ · PRIDCO industrial lots
02

Rafael Hernández Airport, Aguadilla

Aguadilla aerospace cluster

The aerospace cluster at Aguadilla’s Rafael Hernández Airport, with the longest runway in the Caribbean and a Lufthansa Technik MRO base.

  • 11,702 ft · runway, longest in the Caribbean
  • 300+ · staff at Lufthansa Technik PR (2022)
  • 5 · MRO production lines
03

Ceiba, east coast

Roosevelt Roads, Ceiba

The former naval station at Ceiba, now being redeveloped with a pier, dry dock, air cargo plans and thousands of acres of land.

  • ≈3,300 acres · transferred from the Navy, public reports
  • 1943–2004 · years as a naval station
  • 2026–2028 · water, wastewater and power works

Sources: PRIDCO, US International Trade Administration (FTZ 7), JLL (2H 2025), InvestPR (2026), Aviation Week (2022), San Juan Daily Star (2026), Metro (2025), El Nuevo Día (2025).

Why Puerto Rican contractors trust the package

Standards you can submit, shipping you can plan, quality you can inspect

Standards you can submit

Every building is designed to the code basis your engineer of record names, with the basis printed on sheet one of the calculations.

  • Puerto Rico building code guide
  • AISC 360 and AWS D1.1 designed to
  • Mill certificates for every heat
  • Your engineer of record approves and seals

Shipping you can plan

About 45 days at sea from the Vietnamese port to San Juan on a typical sailing, confirmed at booking. Our plant is about two hours by road from the port.

  • FOB Vietnamese port or CIF San Juan
  • Packed in erection order
  • Bundle lists by building and area
  • Tracked live in PEB Studio

Quality you can inspect

Inspection items and rates are agreed with you before cutting, and your inspector can watch online or visit the plant.

  • Inspection and test plan agreed per job
  • AWS-qualified welders
  • Coating readings recorded
  • Materials tested at ILAC labs

From our plant to your estate gate

Five legs from Vietnam to a Puerto Rico site

Sailing time is the typical figure from the Vietnamese port and is confirmed at booking. Steel is packed in erection order, so the first bundles off the truck are the first members your crew needs.

  1. Our plantFabricated, coated and packed in erection order
  2. Vietnamese portAbout two hours by road from the plant
  3. At seaAbout 45 days to San Juan, typical sailing
  4. San JuanCleared by your broker on CIF terms
  5. Site gateBy road to Aguadilla, Ceiba or any PRIDCO park

From our plant

Where every Puerto Rico estate building is made

Real World Steel photos from our plant in Vietnam. None is shown as a site in Puerto Rico.

Every building is designed to the code basis your engineer of record names, made in an IAS AC472 accredited plant and checked to an inspection plan you agree.

Large-project capacity

Built for the biggest jobs on any Puerto Rico estate

Our own plant in Vietnam fabricates 2,500 t of structural steel a month. These are real World Steel jobs, plus the steel we have already shipped to the Caribbean, erected by the local contractor, our customer.

5,000 tSunpro Steel mill
2,500 tCPV Food plant
2,000 tLong Son oil and gas, 56,000+ m²
2,000 tM&D Warehouse, Thailand
20projects already shipped to Guyana

Questions

Questions on steel buildings for Puerto Rico industrial parks

Which Puerto Rico sites do you supply?

Foreign-Trade Zone 7 and PRIDCO parks, the Aguadilla aerospace cluster and the Roosevelt Roads redevelopment at Ceiba, plus any other lot you hold.

On what terms do you ship to Puerto Rico?

FOB at the Vietnamese port, where your forwarder takes over, or CIF San Juan, where we book and insure the sailing. Clearance is handled by your broker.

How long does steel take to reach San Juan?

About 45 days at sea from the Vietnamese port on a typical sailing, confirmed at booking. Our plant is about two hours by road from the port.

Which code are the buildings designed to?

To the code basis your engineer of record names, commonly the Puerto Rico Building Code with AISC 360 and AWS D1.1. Your engineer approves and seals the design.

Do you design for earthquakes and hurricanes?

Yes. Your engineer sets the seismic and wind basis; we design the frame, connections and cladding fixings to it.

Do you erect the buildings?

No. World Steel designs and fabricates the steel. The local contractor, our customer, erects it.

How much steel can you fabricate for one site?

Our own plant fabricates 2,500 t of structural steel a month, and we have delivered single jobs of up to 5,000 t.

Building in a Puerto Rico industrial park?

Send the lot, the use and your engineer’s code basis. We design the steel, fabricate it in our plant and ship it CIF San Juan.