Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Grenada · Solutions and products

Steel solutions and products for Grenada

Grand Anse resorts, the university campus, warehouses and public buildings on three islands: here is every steel product and solution we supply for Grenada, shipped to St George’s.

Grenadian contractors, on the Spice Isle or on Carriacou, everything we make for you is listed on this page.

Design loads for

Grenada

  • Hurricane windVery high
  • Salt airVery high
  • EarthquakeHigh

Values set by your engineer of record, stated on sheet one.

Capacity for Grenada

Large Grenada projects need a large plant. Ours fabricates 2,500 t a month.

These are single jobs from our own plant in Vietnam, released area by area. Whatever Grenada is building, the steel comes from the same line.

For Grenadian contractors

Why Grenadian contractors work with World Steel

One supplier for the whole steel package, made in one accredited plant and shipped to St George’s, with you in charge of the site.

  • Our own plant, 2,500 t a month

    One plant in Vietnam fabricates 2,500 metric tons of structural steel a month, so a large Grenada package gets a production slot, not a place in a queue.

  • IAS AC472 accredited

    The first and only fabricator in Vietnam accredited under IAS AC472, audited twice a year since 2019. Your inspector is welcome at every hold point.

  • One desk, one project manager

    Design, drawings, steel, coating, inspection, packing and shipping under one contract, with one English-speaking project manager for your Grenada job.

  • Live in PEB Studio

    Follow every member from cutting to the ship in real time, from your office in St George’s, and book cranes and crews on facts.

  • Shop drawings included

    Tekla shop and erection drawings come with every project at no extra cost, ready for your engineer of record to approve.

  • FOB Vietnam or CIF St George’s

    Two clear terms: take the steel at our port in Vietnam, or let us arrange sea freight and insurance through to St George’s.

  • About 45 days at sea

    From the Vietnamese port to the Caribbean port takes about 45 days, with packing lists and shipping documents ready for your customs broker.

  • We never compete with you

    We supply the steel structure only. Grenadian contractors win and build the job; we back the bid with drawings, calculations and live tracking.

Designed for Grenada

Built for the wind, salt and ground of Grenada

We design to the Grenada Building Code with the values your engineer of record sets, state them on sheet one and coat the steel for the exposure of your site.

The whole shelf

Every product and solution, available for Grenada

Anything in our catalog can ship to St George’s: structural steel and members, complete buildings, engineered solutions, and the coatings and quality records that go with them.

Structural steel and members

Frames, built-up members and multi-storey steel for buildings of any size.

Complete building packages

Whole buildings, frame to roof and wall cladding, packed as one shipment.

Solutions for island loads

Engineering groups written for hurricanes, earthquakes, salt air and remote sites.

Coating, quality and documents

What protects the steel and proves it: coatings, inspection, accreditation and sample files.

Shipping to Grenada

From our plant to St George’s, FOB or CIF

Members leave Vietnam piece-marked and bundled in erection order. The voyage from the Vietnamese port to St George’s takes about 45 days; your contractor clears the cargo and takes it to site.

FOBVietnamYou or your forwarder book the ship from our port.
CIFSt George’sWe book sea freight and insurance to your port.

An invitation to Grenadian contractors

You win the job and build it. We fabricate the steel.

Grenada knows what a hurricane can do. Build back with steel designed for the wind your engineer sets, shipped to St George’s and packed for the trip to Carriacou. You win the work and build it; we make the steel.

  • You, the Grenadian contractorWin the job, clear the cargo, erect the steel and run the site.
  • World SteelDesign, drawings, fabrication, coating, inspection, packing and shipping.
  • Your engineer of recordSets the loads, approves the drawings and seals them as local rules require.

Questions from Grenadian contractors

Buying steel for Grenada: the questions we hear

Can you supply steel for Carriacou?

Yes. We ship to St George’s and size bundles and members for the onward trip by sea to Carriacou or Petite Martinique, every piece marked for your crew.

What do you supply for campus and school buildings?

Classroom blocks, lecture halls, sports halls and multi-storey frames, designed to the loads your engineer of record sets and repeated across buildings where the program allows.

What does World Steel supply for a project in Grenada?

The steel structure: design or a design check to the Grenada Building Code with the loads your engineer of record sets, shop and erection drawings, fabricated and coated steel and bolts. Complete building packages add roof and wall cladding, doors and accessories, and overhead cranes can come with the building on request. The contractor, our customer, erects it.

How are price and delivery agreed for Grenada?

Every quote is written for its project; we do not publish prices. You choose FOB Vietnam or CIF to St George’s. The voyage from the Vietnamese port to the Caribbean takes about 45 days, and the production slot is named in the quote.

How we work in Grenada. World Steel designs and fabricates to the Grenada Building Code and the standards it references, in our own plant in Vietnam. We hold no Grenadian approval, licence or registration and have no office or crew in Grenada. The contractor, our customer, erects the steel and runs the site; the engineer or architect of record approves the drawings and seals and files them as local rules require.

More for Grenada

Contact World Steel · Grenada

Talk to us about steel for Grenada

WhatsApp, email or a video call with our engineers, booked at an hour that suits St George’s. Our contact page for Grenada has the ports, the local time and the form.