Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
  • Email

    Drawings, questions and quote requests from Puerto Rico, read by our sales and engineering team.

    dang.victor@worldsteelgroup.com
  • Phone & WhatsApp

    International calls reach our head office in Vietnam. Ask for a call at an hour that suits San Juan.

    +84 902 881 833 WhatsApp +84 902 881 833
  • Video call

    Walk through your Puerto Rico drawings with an engineer on Zoom or Microsoft Teams, or watch an inspection live at the plant.

    Ask for a call
  • Puerto Rican contractors

    You win the job and build it; we design, detail and fabricate the steel and ship it to San Juan.

    Contractor partnership

Send us a message from Puerto Rico

Tell us about your Puerto Rico project

A few lines are enough to start: the municipality and the nearest town, what you are building and a rough size. You get a reference number by email straight away, and a member of our team replies with questions or a written scope of supply.

Contractor partnership · Puerto Rico

Puerto Rican contractors: you win the job, we fabricate the steel

Pharmaceutical and medical-device plants on the north coast and in the eastern valleys, hospitals and schools being rebuilt, hotels in San Juan and on the beaches, and warehouses on the expressways: Puerto Rico has some of the largest steel packages in the Caribbean. You win the job and run the site. We design, detail and fabricate the steel in our own plant, ship it to San Juan and back your bid with drawings and live tracking.

  • Pharmaceutical and industrial plants
  • Hospitals, schools and public buildings
  • Warehouses and distribution centres
  • Shop and erection drawings included

Who reads your message

The team that answers Puerto Rico

The same sales team answers contractors, owners and engineers in Puerto Rico. Write through the form above or on WhatsApp and the right person picks up your message.

Meet the full team

One team, two shores

Your site in Puerto Rico, our plant in Vietnam

You talk to World Steel by WhatsApp, email or video. Your steel is engineered, fabricated, inspected and packed by the same company in Vietnam, shipped to San Juan, and you follow every step in real time in PEB Studio.

  • Puerto Rico

    Your project

    Shipped to San Juan, Ponce

    The contractor, our customer, erects the steel; the Puerto Rican engineer of record approves the drawings and files them. We have no office or crew in Puerto Rico.

    Structural steel for Puerto Rico
  • Vietnam

    Head office & engineering

    55 Le Thuc Hoach Street, Phu Tho Hoa Ward, Ho Chi Minh City, Vietnam

    Design to the Puerto Rico Building Code in SAP2000 and Tekla Structures, project management and PEB Studio. Our US office in Westminster, California, handles coordination.

    +84 902 881 833
  • Vietnam

    Plant, IAS AC472 accredited

    Lot Q9-10-15-16, Street No. 7, Hai Son Industrial Park (Phase 3+4), Duc Hoa, Tay Ninh Province (formerly Long An), Vietnam

    Fabrication, QC, painting and export packing for Puerto Rico. Visits and witnessed inspections by arrangement.

    Tour the plant

Getting here

Flying in from Puerto Rico?

Two short drives take you from the runway to the shop floor. Step-by-step directions with photos of each stop.

Book a plant visit

Puerto Rico Q&A

Questions contractors in Puerto Rico ask first

San Juan, Ponce or Mayagüez?

San Juan suits the north and the metro area, Ponce the south, Mayagüez the west. Tell us the municipality and we suggest the port.

Can you supply steel for a pharma or manufacturing plant?

Yes. Process buildings, pipe racks, platforms and crane bays are frames we design and fabricate in our own plant, with mill certificates traced by heat.

Does World Steel have an office in Puerto Rico?

No. We answer Puerto Rico projects from our head office and plant in Vietnam and our US office in Westminster, California, by WhatsApp, email and video call. We work through contractors in Puerto Rico: they win the job and build it, we design, detail and fabricate the steel and ship it to San Juan.

Who erects the steel and who files the permit in Puerto Rico?

The contractor, our customer, erects the steel and runs the site. The Puerto Rican engineer or architect of record approves the drawings and files them for the permit. We design to the Puerto Rico Building Code with the loads they set and give them calculations, shop drawings and erection drawings to work from.

What should I send with my first message?

Tell us the municipality and the nearest town, what the building is for and a rough size in meters or feet, and attach any drawings you have. Files up to 50 MB each can go with the form. We do not publish prices: every quote is written for its project, with the scope of supply and the price FOB Vietnam or CIF to San Juan.

Working in another country? Contact pages for all 26 Caribbean countries.

Made in Vietnam. Shipped to San Juan.

Send the drawings or the municipality, size and use. We set the design basis with your engineer of record, design or detail the steel to the Puerto Rico Building Code, and quote it made in our plant in Vietnam, packed in erection order and shipped to San Juan.