Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Turks and Caicos · Contact World Steel

Contact World Steel about structural steel for Turks and Caicos

Resorts on Providenciales, public works on Grand Turk or buildings on the Caicos islands: talk to the team that designs steel for hurricanes, storm surge and sandy ground, fabricates it in our own plant in Vietnam and ships it to Providenciales or Grand Turk.

Cockburn Town, Turks and Caicos

Plant & engineering, Vietnam

Vietnam is 11 or 12 hours ahead of Cockburn Town, depending on daylight saving time. Tell us when you are free and we book calls inside your working day.

  • Email

    Drawings, questions and quote requests from Turks and Caicos, read by our sales and engineering team.

    dang.victor@worldsteelgroup.com
  • Phone & WhatsApp

    International calls reach our head office in Vietnam. Ask for a call at an hour that suits Cockburn Town.

    +84 902 881 833 WhatsApp +84 902 881 833
  • Video call

    Walk through your Turks and Caicos drawings with an engineer on Zoom or Microsoft Teams, or watch an inspection live at the plant.

    Ask for a call
  • Turks and Caicos Islander contractors

    You win the job and build it; we design, detail and fabricate the steel and ship it to Providenciales.

    Contractor partnership

Send us a message from Turks and Caicos

Tell us about your Turks and Caicos project

A few lines are enough to start: the island and the district, what you are building and a rough size. You get a reference number by email straight away, and a member of our team replies with questions or a written scope of supply.

Contractor partnership · Turks and Caicos

Turks and Caicos contractors: you win the job, we fabricate the steel

Resorts and condominiums on Grace Bay and the Providenciales coast, villas, the airport, schools, clinics, government buildings in Grand Turk and warehouses near South Dock are big steel packages. You win the job and run the site. We design, detail and fabricate the steel in our own plant, ship it to Providenciales and back your bid with drawings and live tracking.

  • Resorts, condominiums and villas
  • Schools, clinics and government buildings
  • Warehouses near South Dock
  • Shop and erection drawings included

Who reads your message

The team that answers Turks and Caicos

The same sales team answers contractors, owners and engineers in Turks and Caicos. Write through the form above or on WhatsApp and the right person picks up your message.

Meet the full team

One team, two shores

Your site in Turks and Caicos, our plant in Vietnam

You talk to World Steel by WhatsApp, email or video. Your steel is engineered, fabricated, inspected and packed by the same company in Vietnam, shipped to Providenciales, and you follow every step in real time in PEB Studio.

  • Turks and Caicos

    Your project

    Shipped to Providenciales

    The contractor, our customer, erects the steel; the Turks and Caicos Islander engineer of record approves the drawings and files them. We have no office or crew in Turks and Caicos.

    Structural steel for Turks and Caicos
  • Vietnam

    Head office & engineering

    55 Le Thuc Hoach Street, Phu Tho Hoa Ward, Ho Chi Minh City, Vietnam

    Design to the Turks and Caicos building code in SAP2000 and Tekla Structures, project management and PEB Studio. Our US office in Westminster, California, handles coordination.

    +84 902 881 833
  • Vietnam

    Plant, IAS AC472 accredited

    Lot Q9-10-15-16, Street No. 7, Hai Son Industrial Park (Phase 3+4), Duc Hoa, Tay Ninh Province (formerly Long An), Vietnam

    Fabrication, QC, painting and export packing for Turks and Caicos. Visits and witnessed inspections by arrangement.

    Tour the plant

Getting here

Flying in from Turks and Caicos?

Two short drives take you from the runway to the shop floor. Step-by-step directions with photos of each stop.

Book a plant visit

Before you write

Read up on steel for Turks and Caicos

Six guides and a page for every district, written for Turks and Caicos: the code basis, the loads, the coatings and the road from Providenciales.

Turks and Caicos Q&A

Questions contractors in Turks and Caicos ask first

Providenciales or Grand Turk?

South Dock on Providenciales suits most resort work; Grand Turk suits the capital and the Turks islands. Tell us the island and we suggest the port.

Can you work with villa and resort architects?

Yes. We propose the steel frame for the architect’s design, coordinate it with the engineer of record and detail every member in Tekla.

Does World Steel have an office in Turks and Caicos?

No. We answer Turks and Caicos projects from our head office and plant in Vietnam and our US office in Westminster, California, by WhatsApp, email and video call. We work through contractors in Turks and Caicos: they win the job and build it, we design, detail and fabricate the steel and ship it to Providenciales.

Who erects the steel and who files the permit in Turks and Caicos?

The contractor, our customer, erects the steel and runs the site. The Turks and Caicos Islander engineer or architect of record approves the drawings and files them for the permit. We design to the Turks and Caicos building code with the loads they set and give them calculations, shop drawings and erection drawings to work from.

What should I send with my first message?

Tell us the island and the district, what the building is for and a rough size in meters or feet, and attach any drawings you have. Files up to 50 MB each can go with the form. We do not publish prices: every quote is written for its project, with the scope of supply and the price FOB Vietnam or CIF to Providenciales.

Working in another country? Contact pages for all 26 Caribbean countries.

Made in Vietnam. Shipped to Providenciales.

Send the drawings or the district, size and use. We set the design basis with your engineer of record, design or detail the steel to the Turks and Caicos building code, and quote it made in our plant in Vietnam, packed in erection order and shipped to Providenciales.