Freeport, Grand Bahama
Freeport Harbour and Container Port
The deep-water harbour at the heart of the Freeport free trade zone, with a container port opened in 1997 and the harbour’s industrial lots.
- 1997 · container port opened
- 16.1 m · draft at the quay
- ≈1.1 M TEU · handled a year, public reports